BENE - PowerPoint PPT Presentation

1 / 48
About This Presentation
Title:

BENE

Description:

NuFact05 in Europe, most likely Proceedings & Interim Report ... Marie Curie hosts ? Table 3: Detailed expected and requested budget breakdown. ... – PowerPoint PPT presentation

Number of Views:25
Avg rating:3.0/5.0
Slides: 49
Provided by: NBP3
Category:
Tags: bene | curie

less

Transcript and Presenter's Notes

Title: BENE


1
BENE CARE
V. Palladino/INFN 19 Nov. 2003 Joint ECFA
Muon-BENE Week
general introduction relations with our other
efforts in the neutrino sector
federation towards the 5
years contract the revised
proposal Annex I
deliverables milestones as in Annex I

funds as in the forms
the first 18 months .
to the Interim Report Planning that Joint
Week Mon February 16 . an ordinary week

endorse Proposals for
Design Studies Joint
Week Mon May 24 a special week
hold Workshop on Physics _at_ SPL
NuFact05 in Osaka
Joint Week in the Fall
the yearly itinerant CARE/BENE week

where? when?
NuFact05 in Europe, most likely
Proceedings Interim Report and the rest
NuFact08 in Europe Final Report .. towards
CDR..
2
before BENE
the ECFA Muon Study Groups http//muonstoragerin
gs.web.cern.ch active around CERN
since 1998 (chair A. Blondel)

several Physics WGs

NuOsc and more
the CERN NFWG H. Haseroth . now ENG (HH and R.
Edgecock)

NuFact Superbeams

several task forces
the Betabeam WG P. Zucchelli now M.
Lindroos .
neutrinos met
Isolde

active in tight collaboration with the US
and Japan Muon Collaborations (yearly
NuFact Int. Summer Workshop School)
3
the ECFA Muon Study Groups http//muonstoragerin
gs.web.cern.ch active around CERN
since 1998 (chair A. Blondel)

several Physics WGs

NuOsc and more
Oscillation Physics with a Neutrino Factory
CERN-TH/2002-208
MezzettoHernandez et al after DydakGomez
Physics with low energy muons at a Neutrino
Complex http//xxx.lanl.gov
/pdf/hep-ph/0109217
Giudice, V.der Schaaf et al
High intensity neutrino physics Physics at the
fron end of a Neutrino Factory a quantitative
appraisal
CERN-TH/2001-131, hep-ph/0105155
Mangano, Kataev et al
Kaon Physics with a high intensity proton driver
http//arXiv.org/ps/hep-ph/o
107046
Buchalla et al
Physics opportunities at mm Higgs Factory
http//xxx.lanl.gov/pdf/hep-ph/0109
199
Janot et al
4
the CERN NFWG H. Haseroth . now ENG (HH and R.
Edgecock)




NuFact Superbeams

several task forces
set up by the EMCOG (chair C. Wyss)
the EU
Muon Coordination Oversight Group
set up by CERN
and the major EU HEP agencies
H. Schonauer
, Helge Ravn
E. Keil
The study of a EU Neutrino Factory at CERN
http//nicewww.cern.ch/molat/neut
rino/nf103.pdf
5
the Betabeam WG P. Zucchelli now M.
Lindroos .
neutrinos met
Isolde

in tight collaboration with ISOL Community
..
6
)
CARE
.
Dissemination Board
Care Collaboration Council


Joint Research Activities
(5 subprojects)
Networking Activities
(3 subprojects)
N2 ELAN (Electron linear accelerators
colliders) (F. Richard/Orsay)
JRA1 SRFCAV (SRF Cavity) (D. Proch/DESY)
JRA3 PHIN (Photo-Injector) (A. Ghigo/INFN)
JRA2 SRFTECH (SRF Technology) (T. Garvey/ORSAY )
600KE
2600KE
2600KE
3600KE
!
N3 BENE (Beams for European NeutrinoExperiments
) (V. Palladino/INFN)
JRA4 HIPPI (High Intensity Proton Pulsed
Injector) (R. Garoby/CERN)
NB this is the RD towards a MW Injector for
the p driver !!! (first 200 MeV)
CNGS !!!! LHC

500KE
3600KE
N4 HEHIHB High Energy and High Intensity Hadron
Beams (H. Haseroth/CERN)
JRA5 NED (Next European Dipole) (A.
Devred/Saclay)
national funding agencies

400KE
1000KE


7
CARE and BENE
are also an emanation of ECFA (and EPS)

B. Foster M. Spiro started it all
within ECFA, the board of Directors of HEP
laboratories appointed
representatives in ESGARD (R. Aleksan)
European Steering Group for
Accelerator RD
ESGARD set up the CARE team, as described
for neutrinos, asked
the EMCOG to mandate somebody and
begins now to coordinate the Design Studies
8
from BENE proposal coordinate and integrate
the activities of the accelerator and particle
physics communities working together,

in a worldwide context, towards
achieving superior neutrino (?)
beam facilities for Europe. 1) to establish a
road map for upgrade of our present facility and
the
design and construction of new ones 2) to
assemble a community capable of sustaining
the technical realisation
and scientific exploitation

of these facilities 3) to foster a sequence of
carefully prioritizedcoordinated initiatives
capable to establish,
propose and execute the
RD efforts necessary to achieve these goals.
220 signatures
9
BENE as
a linear combination ..
ECFA Muon Study Groups
ENG
Betabeam
mufront
muend
betabeam
PHYSICS WP
NOVEL ? BEAMS WP
DRIVER WP
TARGET WP
COLLECTOR WP
DS
N3 BENE (Beams for European NeutrinoExperiments)
Work Packages
10
E. Gschwendtner
11
RD projects HARP, TARGET
BNL GRENOBLE TTA (nTOF)
HORN Studies
CTF (LAL) MUSCAT
MICE
etc These must also find proper attention
inside WPs
HIPPI
12
http//esgard.lal.in2p3.fr/
with cuts
13
STATUS TODAY preparing the 5 years contract
the revised proposal (after the cuts)
Annex I
the kernel of our contract
now
still draft . good enough only to be worth
discussion . lots of work still Pasini dixit
later MOU?
Consortium Agreement in preparation too
14
(No Transcript)
15
a road map
a community
RD plans
16
(No Transcript)
17
A possible Road Map
NuFact LMD CP possibly T MSW Matter Effects
Muon Acceleration Storage RD
Muon IonizationCooling RD (MICE)
MW Target Collector RD
MW P driver
Superconducting Proton Linac (few
GeV/c)
aim at CDR by LHC startup!
18
A possible Road Map
Ne18
ne
Ion Acceleration Storage RD
Radioactive Ion Beams RD
BetaBeam
ne
He6
CP T CPT
10
NuFact LMD CP possibly T MSW Matter Effects
Muon Acceleration Storage RD
Muon IonizationCooling RD (MICE)
MW Target Collector RD
MW P driver
90
Superconducting Proton Linac (few
GeV/c)
nm
Conventional
SuperBeam,
p
nm
Physics at new large u/ground lab 500 Kton
Water Cerenkov? 50 kton Li A?
?13 maybe CP
N decay !
SuperNovae Obs. !
nm
p -
conventional beam 2 CNGS !!!!!!!!!!!!
19
all Players more Germany?
20
Marie Curie hosts ?
21
(No Transcript)
22
(No Transcript)
23
(No Transcript)
24
(No Transcript)
25
(No Transcript)
26
(No Transcript)
27
(No Transcript)
28
(No Transcript)
29
(No Transcript)
30
(No Transcript)
31
(No Transcript)
32
Table 3 Detailed expected and requested budget
breakdown. (The sums do not include UNI-GE and
PSI, participants from Switzerland)
aim at DS money
higher priority
33
Planning all that
this Joint Week Mon Nov 17 ..

34
yesterday
Dear colleagues The EMCOG meeting will be held
tomorrow Tuesday 18 November in room 1-1-025 at 
1400 until 1800. -- announcements ) -- SPL
status and plans (Maurizio Vretenar) -- beta
beam Design study status (Mats Lindroos) --
Neutrino factory design study (Rob Edgecock) --
target experiment  (Harold Kirk or Kirk Mc
Donald) -- SPL physics workshop (Vittorio
Palladino) -- discussion Thank you for
confirming your attendance, kind regards, Alain
Blondel ) 1. MICE approval at RAL    2.
status of plans for Frejus Laboratory
35
Today and tomorrow
Frejus - J. Bouchez
US road map study
NO Venice 3-5/12
Physics _at_SPL
36
also today
37
Thu
38
Fri
will be collecting material from you
39
Joint Week Mon February 16 . an ordinary week

endorse Proposals
for Design Studies
40
Design studies FP6 foresees funding for design
studies of new infrastructures. Encouraged by EU
in reference with the (approved) CARE. In
preparation is the proposal for a European based
Design study of a
neutrino factory and superbeam RAL as leading
house. (Peach/Edgecock) Proton driver
CERN in coll. with Saclay, RAL,
etc., Target ? many interested. Still searching a
leading house.
TTA at CERN under consideration (pulsed beam
important) Horn and collectors LAL
Orsay CTF Cooling
MICE_at_RAL Acceleration, FFAG Saclay,
Grenoble, Frascati CDR by LHC
startup ! Storage ring and instrumentation
.. Detectors
Europe alone does not have critical mass for all
this. gt world collaboration with USA and Japan
was launched at NUFACT03 in June 2003.
41
Joint Week Mon May 24 a special
week hold Workshop on Physics _at_ SPL

42
Betabeam Eurisol
Moriond Mar 03
Factor 23 !
E U Radio I Sotopes On Line
Radio Isotopes b emitters
Few 100 MeV!
!!!
Same detector as Superbeam. At the same time!
43
?s EURISOL
EURISOL and future ? programs may share a new
powerful European p driver
?
?
?
?
?
Eurisol
Eurisol
Eurisol
Eurisol
20ms rep rate
A second design sudy
. unique
opportunity
44
The physics case for the SPL()
1)neutrino oscillations conventional
Superbeam 2)EURISOL RIB stability
of nuclear matter 3)neutrino
oscillations Betabeam NuFact
4)slow muon .. Rare LFV decays 5)
further sinergies to be energetically sought

() Superconducting Proton Linac
many MW (1016 2-3 GeV/c p)
presently favoured option for
p driver (HARP)
significant Effort PHYSICS DRIVER TARGET COLLEC
TOR
Document to the CERN Scientific Policy Committe
in December
Workshop late May 04 Physics at the SPL
Report in time for SPSC_at_Cogne IX, Sep. 04
45
NuFact04 in Osaka
Joint Week in the
Fall the yearly itinerant
CARE/BENE week

where? when? RAL? LNF??
NuFact05 in Europe, most likely
Proceedings Interim Report and the rest
NuFact08 in Europe Final Report
CDR to DG
46
(No Transcript)
47
The End
48
Write a Comment
User Comments (0)
About PowerShow.com