Visioning Session - PowerPoint PPT Presentation

1 / 29
About This Presentation
Title:

Visioning Session

Description:

Time and Task 6:30 Introduction Team, Goals, ... Repair and preventative maintenance of HVAC systems Unoccupied & Occupied Costs (Annualized) Unoccupied: ... – PowerPoint PPT presentation

Number of Views:134
Avg rating:3.0/5.0
Slides: 30
Provided by: Informati387
Category:

less

Transcript and Presenter's Notes

Title: Visioning Session


1
Visioning Session C.R. Layton U.S. Army Reserve
Center October 23, 2012
2
Visioning Session Schedule
  • Community Opportunities
  • Starting with a blank page
  • Time and Task
  • 630 Introduction
  • Team, Goals, Format, Outcome
  • 645 PowerPoint Tour
  • Opportunities, Constraints
  • 700 Goals and Objectives
  • Other noted examples
  • Community Catalyst
  • Shared partners, Shared costs
  • 800 Visioning Session Wrap-up
  • 830 Conclude Session

3
City Commission Priorities
  • Redevelopment of the property should
  • Serve a broad community purpose
  • Achieve established City goals as articulated in
    the Strategic Plan and elsewhere
  • Add value to the surrounding neighborhood and
    community
  • Emphasize the ability of applicant group to
    leverage outside community support and resources
    and
  • Value the integration of uses as demonstrated by
    the proposal.

4
PowerPoint Tour
5
Project History
  • 1950 Property transferred to U.S. Army by City
    of Gainesville
  • 1951-1953 Main building constructed
  • 1953 Began operation as USAR Center
  • 1958 Building addition
  • 2009 Center was vacated
  • 2011 City was notified the Army Reserve
    Center was no longer needed for service
    and would be conveyed to the City
  • 2012 City commissioned air, soil, and
    groundwater testing

6
Site Inventory
  • Total site area 6.8-acres
  • Number of Buildings 3 (1 administration/2
    petroleum, oil, and lubricants (POL) buildings)
  • Parking areas 2 lots (approx. 0.40-acres each)
  • Approximately 30 trees (live oak and long leaf
    pine)
  • Approximately 1,816 LF of perimeter security
    fencing
  • Covered picnic structure

7
Administrative Offices
Parking Area 2
POL sheds
Drill Hall
Indoor Firing Range
Parking Area 1
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
Environmental Conditions
  • 2010 Environmental Condition Of Property Report
  • Found no evidence of site contamination or need
    for remediation
  • City-Initiated 2012 Phase II Environmental Site
    Assessment
  • Found no evidence of contamination or adverse
    soil or groundwater impacts

14
Environmental Conditions
  • Army-Initiated Studies found
  • No listed wetlands
  • Located outside of the 100-year floodplain (FEMA
    FIRM)
  • No known listed species
  • Environmental Study Review by City of Gainesville
    Environmental Coordinator required prior to
    rezoning/redevelopment of property

15
(No Transcript)
16
Neighborhoods
  • Located within Northeast Neighbors and proximate
    to Greater Northeast Community, Duval, and
    Duckpond neighborhoods
  • Common neighborhood concerns
  • Property maintenance
  • Crime
  • Traffic
  • Common neighborhood strengths
  • Active, engaged neighbors
  • Tree canopy
  • Proximity to downtown
  • Common neighborhood goals
  • Landscaping and traffic calming improvements
  • Development of tot lots and/or pocket parks
  • Attracting more neighborhood oriented businesses

17
Parks, Recreation, and Cultural Affairs Master
Plan
  • The Master Plan identified a need for the
    following facilities within the 20-year planning
    period
  • Passive open spaces
  • Picnic facilities
  • Playgrounds and tot-lots
  • Indoor recreation facilities
  • Public meeting rooms
  • Basketball courts
  • Volleyball courts
  • Tennis courts
  • Walking and exercise paths
  • Bicycle trails
  • Soccer/football fields
  • Softball/baseball fields
  • Swimming pools

18
Estimated Maintenance Costs (by City General
Services Department)
  • One-time Costs 28,000
  • Exterior 3,000 - one time clean up of facility
    grounds.
  • Structural 5,000 Initial roof repairs and
    5,000 Interior painting and patching.
  • Mechanical 15,000 Repair and preventative
    maintenance of HVAC systems
  • Unoccupied Occupied Costs (Annualized)
  • Unoccupied Total Costs - 20,000
  • Occupied Total Costs - 142,000
  • Long Range Capital Costs
  • Roof Replacement (5-10 yrs) - 534,000

19
Marshall Street ArmoryLansing, Michigan
20
Marshall Street Armory
  • Current Use Shared workspace for a group of
    local nonprofits
  • Gross SF 38,000 SF
  • 4.82 acres
  • Physical Condition Fair
  • Acquisition Cost 200,00
  • Renovation Cost 5.1 M
  • Renovation Cost/SF 134/SF
  • Sources of Funds 5.1M Tax Credits and
    Grants
  • Operating Costs N/A
  • Ownership Gillespie Group

21
The Center for Arts at the ArmorySomerville, MA
22
The Center for Arts at the Armory
  • Current Use Performing arts center, café,
    farmers market, classrooms, nonprofit office
    space
  • Gross SF 34,000 SF
  • Physical Condition Fair
  • Acquisition Cost 2.6 M
  • Renovation Cost 6 M
  • Renovation Cost/SF 176/SF
  • Sources of Funds Privately financed
  • Operating Costs 420,000 per year to cover
    operating expenses and debt service
  • Ownership Highland Armory Realty Trust

23
Goals and Objectives
24
?N
First Floor Plan
25
N?
Second Floor Plan
26
(No Transcript)
27
(No Transcript)
28
(No Transcript)
29
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com