Title: Progetto: LIFE10 ENV/IT/000364
1Progetto LIFE10 ENV/IT/000364
ECOFATTINGEnvironmentally friendly natural
products instead of cloroparaffines in the
fatting phase of the tanning cycle Start
01/01/2012 End 31/12/2013 13/06/2013 18 month
meeting Elda Alicante (Spain) INESCOP premises
2AGENDA
- 0930 INESCOP Welcome and opening of the
meeting - 0935 All Actions carried out by each partner
and scheduled activities from January 2013 until
the end of May 2013. - 1030 All Open discussion on actions carried
out - 1100 All Coffee break
3AGENDA
- 1115 All ECOFATTING Technical future issues
- ICCOMCNR Technical activities scheduled in the
next six months of the project (project end) - All Open discussion on actions to be carried
out in the next six months of the project
(project end) - 1200 ICCOMCNR Management and dissemination
issues - 1240 All General questions
- 1250 End of progress meeting
- 1300 Tour of INESCOP premises
4Actions carried out by each partner
ACTIONS
13 material for workshops
14 diffusion material preparation
15 Italian training
16 Spanish training
17 Italy workshop
18 Spain workshop
19 fairs
20 digital supports
21 international dissemination
22 After-LIFE Communication Plan
23 Project management
24 Monitoring
25 audit
1 fat agents
2 environmental impact
3 natural products
4 laboratory level
5 semi-industrial level
6 pre-industrial level
7 environmental demonstration
8 environmental benefits
9 quality assessment
10 tecnico-economic viability
11 manual
5Actions carried out by each partner
ACTIONS
6Technical Actions carried out by each partner in
the last six months
-
- ACTION 3 Natural products demonstration and
evaluation - ACTION 4 Environmental demonstration of natural
products at laboratory level - ACTION 5 Fatting at a semi-industrial level by
using natural products - ACTION 6 Environmental demonstration of natural
products fatting at a pre-industrial level
7Technical Actions carried out by each partner in
the last six months
-
- ACTION 7 Environmental demonstration of hides
fatted with natural products - ACTION 8 Study of the demonstration about the
environmental benefits from the natural products
fatting process - ACTION 9 Quality assessment of leather products
production
8Technical Actions carried out by each partner
- Presentations of
- ICCOMCNR
- COLORTEX
- ENEA
- SERICHIM
- INESCOP
9Technical Actions carried out by each partner
-
- All Open discussion on actions carried out
10Dissemination activities
-
- ACTION 13 Material preparation for workshop
- ACTION 14 Diffusion material preparation
- ACTION 15 Training course for Italian tanneries
- ACTION 16 Training course for Spanish tanneries
- ACTION 19 International fairs and other events
- ACTION 20 Digital supports for international
diffusion - ACTION 21 International diffusion and
dissemination
11Dissemination activities
- ACTION 13 Material preparation for workshop
- Logo definition and design
- ICCOMCNR produced 1 banner in Italian and 1
banner in English - ICCOMCNR produced 400 eco bags as project gadget
- ICCOMCNR produced 1 roll up
- ICCOMCNR produced an official ECOFATTING power
point presentation in English to be used in
events - ICCOMCNR produced 200 brochures in Italian and
200 brochures in English - Inescop dissemination materials (poster,
presentation, etc.)
12Dissemination activities
- ACTION 14 Diffusion material preparation
- ICCOMCNR produced 12 ECOFATTING Notice boards
- ICCOMCNR produced 200 brochures in Italian and
200 brochures in English - ICCOMCNR carried out two TV interviews with local
TV agencies - Press contacts and articles related to ENEA event
for the 20th Anniversary of the LIFE Programme,
Faenza, June 21st, 2012 three press releases
have been made by ENEA, two of which published
into the ENEA official web site (sections
Eventi and News) and one disseminated through
mayor local newspapers.
13Dissemination activities
- ACTION 14 Diffusion material preparation
- ICCOMCNR was responsible of the edition of 1
article edited by a Pisa local newspaper - From January to August 2012, INESCOP presented
the project through the newsletters that are
distributed in electronic and paper form to
INESCOPs member companies (mainly tanneries and
footwear and leather goods manufacturers) - INESCOP activities
14Dissemination activities
- ACTION 15 Training course for Italian tanneries
- COLORTEX organised a training course specifically
aimed at tanning companies on May 31st
15Dissemination activities
- ACTION 16 Training course for Spanish tanneries
- A training course specifically aimed at tanning
companies will be held at INESCOP premises on
June 20th
16Dissemination activities
- ACTION 19 International fairs and other events
- ECOFATTING power point and video presentations at
the Italian Celebration Day for the 20th
Anniversary of the LIFE Programme, Brescia, May
25th, 2012 - ECOFATTING power point presentation at XXII
Settimana della Cultura Scientifica a
Tecnologica in Faenza, Aprile 18th, 2012 - ENEA, in networking with ECOFATTING LIFE10
ENV/IT/365, presented a poster in the 3rd
International Conference on Industrial and
Hazardous Waste Management which was hold in
Chania (Crete, GR) on September 12-14th, 2012.
17Dissemination activities
- ACTION 19 International fairs and other events
- ICCOM-CNR presented ECOFATTING in three national
meetings - - XXI National Meeting of Italian Society of
Pure and Applied Biophysics (SIBPA), 17-20
September 2012 - XXIII National Meeting of Analytical Chemistry,
Italian Chemical Society, La Biodola (Elba),
16-20 September 2012 the description of part of
the results of Action 1 were presented in a
published abstract and in a poster. Possible
participation at Uruguay event - Po.Te.Co. (Polo tecnologico conciario) in
Castelfranco di sotto (PI), 10/12/2012
18Dissemination activities
- ACTION 19 International fairs and other events
- INESCOP presented the project in different
national and international fairs listed below - - 21st Edition of ECOFIRA 2012, International
Fair of Environmental Solutions. Valencia
(Spain), 29th February 2nd March 2012. - - 12th Edition of Green Week, Brussels (Belgium),
22nd 25th May 2012 - - Conference in Green Week Satellite events
Regional responses to the EU2020 on water.
Lessons learned through European projects,
FCVRE, Brussels (Belgium), 22nd May 2012. - - 1st Water, Waste and Energy Management,
Salamanca (Spain), 23rd 25th May 2012
19Dissemination activities
- ACTION 19 International fairs and other events
- - Industrial Technologies Congress, 2012, Aarhus
(Denmark), 19th 21st June 2012 - - 18th Congress of the Latin American Federation
of Leather Chemists and Technologists, Montevideo
(Uruguay), 9th - 11th October 2012. - - 28th Edition of the International Footwear
Fair, FUTURMODA, Alicante, (Spain), 30th 31st
October 2012 - - 29th Edition of the International Footwear
Fair, FUTURMODA, Alicante (Spain), 17th 18th
April de 2013. - - 62nd Congress of the Spanish Leather Chemists
Association AQEIC Lorca Murcia (Spain), 10th
11th May 2013 - - LIFE Networking Event, Valencia (Spain), 14th
May 2013
20Dissemination activities
- ACTION 20 Digital supports for international
diffusions -
- ENEA is the project responsible for the selection
of external service video expert for the
collection and mixing of each associated
beneficiary activities video and production of
the global ECOFATTING video. - In this project period ENEA started all the
internal procedures for the external service
video expert selection.
21Dissemination activities
- ACTION 21 International diffusion and
dissemination - ECOFATTING website in Italian, English and
Spanish www.pi.iccom.cnr.it/ecofatting/it - ICCOMCNR produced 1 roll up
- ICCOMCNR produced an official ECOFATTING power
point presentation in English to be used in
events - ICCOMCNR and ENEA articles
- ICCOMCNR carried out two TV interviews with local
TV agencies - Cluster with OXATAN, SHOELAW, PODEBA, SOREME,
BioNaD, CLEANSED, After-Cu, MICROTAN, C02SHOE,
SHOEBAT and BIOREM (LIFE 09-10-11-12 projects)
22Dissemination activities
23Management activities
-
- ACTION 23 Project management
- ACTION 24 Monitoring
- ICCOMCNR has continuous contact with all project
partners for monitoring project activities - ICCOMCNR prepares and sends a monthly summary
(each 28th) of the project activities carried out
to monitoring representant - ICCOMCNR needs to receive from each partner
technical inputs before each 28th
24ECOFATTING Technical future issues
- ACTION 6 Environmental demonstration of natural
products fatting at a pre-industrial level - ACTION 7 Environmental demonstration of hides
fatted with natural products - ACTION 8 Study of the demonstration about the
environmental benefits from the natural products
fatting process - ACTION 9 Quality assessment of leather products
production - ACTION 10 Demonstration of technical-economic
viability - ACTION 11 Natural products fatting manual
- ACTION 12 Leather sample books of hides fatted
with natural products
25ECOFATTING Technical future issues
- ACTION 6 Environmental demonstration of natural
products fatting at a pre-industrial level - Description
- The leather produced in previous Actions will be
tanned with the natural products technique in the
fatting phase by means of collaborating with
Italian and Spanish tanneries that will be
selected from those interested. ICCOMCNR will
conduct a product assessment of the leather
samples produced with the new method and will
finalize the environmental product
characterization of the leather produced with the
treated leather.
26ECOFATTING Technical future issues
- Methods employed
- COLORTEX, SERICHIM and INESCOP will be involved
in - Industrial-scale production of sheep/goat
leather treated with innovative natural products
formulations in the fatting phase. - Product characterization.
- Industrial-scale production of bovine leather
treated with innovative natural products
formulations in the fatting phase.. - Product characterization.
- ICCOMCNR and ENEA will be involved in
- Environmental assessment of the new fatting
process in tanning cycle using internationally
accepted standards.
27ECOFATTING Technical future issues
- Expected results
- sheep/goat skins leathers tanned with the use of
natural products in the fatting phase. - bovine skins leathers tanned with the use of
natural products in the fatting phase. - analysis of the environmental impact from the
hide tanning process by using natural products
instead of cloroparaffines in the fatting phase
28ECOFATTING Technical future issues
- ACTION 7 Environmental demonstration of hides
fatted with natural products - Description
- The hides produced by the Italian and Spanish
tanneries will be used by Italian and Spanish
leather manufacturer companies, chosen from those
interested, to manufacture different leather
products. Immediately afterwards, a comparison
will be made between the natural products fatted
hides and cloroparaffines fatted hides, taking
into account the voluntary limits imposed by the
European Eco-label for ecological criteria
(Decision 2002/231/CE) and other chemical
parameters of environmental interest (pH, etc.).
To achieve this, validations of harmful
substances that could be present in hides will be
carried out. The validation results will be
written in a report.
29ECOFATTING Technical future issues
- Methods employed
- ICCOMCNR, INESCOP and ENEA will be involved in
- Production of different types of leather
products - Validations of harmful substances in hides based
on international standards. - Expected results
- 100 leather products elaborated with natural
products fatted leathers. - Production of more environmentally friendly
leather products, that complies with the European
Eco-label criteria
30ECOFATTING Technical future issues
- ACTION 8 Study of the demonstration about the
environmental benefits from the natural products
fatting process - All the information gathered from earlier
actions, as well as results and conclusions, will
be logged in a study. To achieve this, INESCOP
will send reports to ICCOMCNR in which the
results will be contained from the production
validations carried out in the Spanish companies,
as well as the results of the comparison between
leather products manufactured from natural
products fatted hides and cloroparaffines fatted
hides. This study will contain photos of the
leather products manufactured, and will contain
samples of natural products tanned hides at a
semi-industrial and pre-industrial level.
31ECOFATTING Technical future issues
- ACTION 9 Quality assessment of leather products
production - A check will be made to verify that hides fatted
with natural products satisfy leather products
quality standards. To achieve this, physical
validations (tensile strength, resistance to
wear, contraction temperature, etc.) will be
carried out on hides produced to manufacture
leather products in Italy and in Spain. These
validations will be carried out in COLORTEX,
SERICHIM and INESCOP laboratories, which are
equipped to carry out these types of assessments.
The results will be logged in a report.
32ECOFATTING Technical future issues
- ACTION 10 Demonstration of technical-economic
viability - This Action will foresee a deep analysis in
order to prove that hides tanned with the new
natural products method comply with quality
standards and are economically viable.
33ECOFATTING Technical future issues
- ACTION 11 Natural products fatting manual
- This Action will foresee the production of a
formative manual which explains how to apply the
new natural products fatting technique to the
industrial process in tanneries.
34ECOFATTING Technical future issues
- ACTION 12 Leather sample books of hides fatted
with natural products - This Action will foresee the production of hide
sample books tanned with the new natural products
fatting technique, which can be shown at
different events.
35ECOFATTING Technical future issues
-
- All Open discussion on actions to be carried
out in the next six months of the project
36ECOFATTING Dissemination future issues for the
next six months
- ACTIONS 13-22 Update
- In particular
- Action 13 production of new materials
- Action 14 production of new articles and
technical articles - Action 15 OK
- Action 16 OK
- Action 17 workshop in October-November in
Colortex - Action 18 workshop in October-November in
INESCOP - Action 19 participation at new 4 events
- Action 20 ENEA will produce a video in 3
languages (English, Spanish and Italian) in which
the ECOFATTING projects results will be shown. - Action 21 production of new 5 posters
- Action 22 ICCOMCNR, with the support of all the
partners, will produce the After-LIFE
Communication Plan
37ADMINISTRATIVE ISSUES
-
- Next Deliverables
- Progress Report submitted
- Partner cost analysis
- Monitoring Team visit
- Final Report
- Audit
- Next meeting
38NEXT DELIVERABLES
- Semi-industrial level Action 5
- Pre-industrial level Action 6
- Environmental demonstration Actions 7-8
- Study of technical-economic viability Action 10
- Videos Action 20
- Articles and press releases Actions 14, 21
- Dissemination materials Action 13-22
- Layman report Action 20
- After-LIFE Communication Plan Action 23
- Audit report Action 25
- Final Report Technical, Dissemination and
Financial documents
39Progress Report
-
- ICCOMCNR at the end of May 2013 has submitted the
foreseen Progress Report to the EC and Monitoring
Team, made up by - Progress report with the summary of technical,
administrative and dissemination project issues - Dissemination Annex
- Deliverables
40Partner cost analysis
41Monitoring team visit
-
- The Monitoring Team (Ludovico Susani) will visit
ICCOMCNR on 28th of June for checking the
progress of the project technical activities and
the administrative documents - Ludovico Susani requested the presence only of
ICCOMCNR and COLORTEX for checking the technical
activities - Please send to ICCOMCNR all the updated
administrative documents before 20th of June
42Final Report
-
- ICCOMCNR will be responsible of the production of
the Final report which will be made up by - Progress report with the summary of technical,
administrative and dissemination project issues - Dissemination Annex
- Deliverables
- Financial forms with all the originals signatures
from each partner - Audit document
- The EC ok of the Final report will produce the
project final payment from the EC
43Audit
-
- ICCOMCNR will be responsible for the production
of an audit document signed by an external
authorised auditor (already selected) which will
certify all the project financial data. - The selected auditor will check all the partner
financial data and will be free to request to
each partner more detailed documents.
44Project meetings
-
- Project meetings
- 1st Kick off meeting in COLORTEX in Italy in
January 2012 - 2nd Coordination meeting in ICCOMCNR in Italy in
June 2012 - 3rd Coordination meeting in SERICHIM in Italy in
January 2013 - 4th Coordination meeting in INESCOP in Spain in
June 2013 - Next Final Project meeting
- 5th Coordination meeting in ICCOMCNR in Spain in
December 2013