Title: Project Planning:


1
  • Project Planning
  • Assembling a Mortenson Integrated Work Plan

2
Project Planning
  • A plan that is not written down is only an
    idea. Greg Knutson
  • Mortenson want plans with great ideas. Not just
    ideas.

3
Project Planning
  • Integrated Work Plan (IWP) A plan that
    identifies the work phase, each activity in the
    work phase, each task with in each activity and
    each sub task within each task.
  • An IWP incorporates the safety, quality and
    efficiency requirements necessary to complete the
    work injury free, to the specification and to the
    maximum possible human output.
  • The following strategy is for an entire
    construction project, however this strategy can
    be applied to any work process.
  • Keep your mind open to strategic planning
    components and how this strategy facilitates plan
    development.

4
Project Planning
  • We must get better at planning.
  • Our profession is by nature reactive.
  • We spend the bulk of our time dealing with the
    past than anticipating the future.
  • It is those things that we do not anticipate that
    causes confusion.
  • As you know Safety and Quality are the first to
    be jeopardized in a state of confusion.

5
Project Planning
  • Project Planning Steps
  • Assemble the TOOLS
  • UNDERSTAND the project
  • Determine COMMUNICATION requirements
  • DEVELOP the Plan
  • COMMUNICATE the Plan
  • IMPLEMENT UP-DATE the Plan
  • EVALUATE the results

6
Project Planning
  • Planning Tools
  • Operations Manual
  • Contract Documents (Plans Specs)
  • Project Schedule
  • Project Phasing Requirements
  • Governing Agency Requirements
  • Mortenson Zero Injury Manual
  • Mobile Crane, Disruption Avoidance, etc
  • Mortenson Quality Manual

7
Project Planning
  • Understand the project
  • Talk to the Team
  • Business Development, Estimating (lead estimator)
    Scheduling (who made the schedule)
    Construction/Project Executive, Customer
  • What is the Project Strategy?
  • Understand the Budget and Estimate
  • Review Contract Documents
  • Plans Specifications
  • Safety Goals and High Risk Activities
  • Quality Expectations
  • Project Schedule

8
Project Planning
  • Communicating the Plan
  • Who will you communicate the plan to?
  • Mortenson Team Members
  • Customers
  • Architect/Engineer
  • Governing Agencies
  • Subcontractors
  • Craftworkers
  • General Public

9
Project Planning
  • Communicating the Plan
  • Methods of communication
  • Plans Drawings
  • Text
  • Project Meetings
  • Posting the Plan
  • Job Wide Safety Meetings
  • Distribution

10
Project Planning
  • Developing the Plan
  • Divide into manageable components
  • Phase of the Work
  • Work Activity
  • Work Task
  • Sub Tasks (Daily Pre-Task Planning)
  • A plan must be developed for each Phase of Work

11
Project Planning
Project Components
12
Project Planning
Project Components
Including procurement (MRPII) 0-100 push-ups
Into 5 push up increments
13
Example of Project Planning
Project Components
Business Development Construction
Executive Superintendent Project Manager
Structure
Foreman
14
Project Planning
  • Phases of Work
  • Civil Phase
  • Structural Phase
  • Enclosure Phase
  • Interior Build-out
  • Building Systems
  • Start-Up / Close-Out
  • A Phase of Work can be added to meet project
    specific requirements.

15
Project Planning
  • A Phase of Work has Work Activities
  • Structural (Phase of Work)
  • Work Activities
  • Deep Foundations
  • Foundations
  • Structural Steel
  • Slab on Grade
  • Slab on Metal Deck

16
Project Planning
  • A Work Activity has Work Tasks
  • Foundations (Work Activity)
  • Work Tasks
  • Layout
  • Fine grade
  • Forming (set/strip)
  • Reinforcing
  • Concrete Embedment
  • Place/finish concrete

17
Project Planning
  • A Work Task has Sub Tasks
  • Fine Grade (Work Task)
  • Sub Tasks
  • Establish Elevations
  • Import/Export Soil Materials
  • Daily Pre-Task Planning is used to plan Sub
    Tasks

18
Project Planning
  • Integrating Safety
  • Review the Phases of Work, Work Activities, Work
    Tasks and Sub-Tasks in conjunction with the Zero
    Injury Manual.
  • List the sections of the Zero Injury Manual that
    apply to the work being conducted during each
    Phase of Work.
  • List all High Risk Activities and mitigation
    plans

19
Project Planning
  • Integrating Quality
  • Review the Phases of Work, Work Activities, Work
    Tasks and Sub-Tasks in conjunction with the
    Quality Plan.
  • List the sections of the Quality Plan that apply
    to the work being conducted during each Phase of
    Work.
  • List will include all required Pre-installation
    Meetings, Initial inspections and Follow-up
    inspections (Inspection log)
  • Identify all submittals (Submittal Register)

20
Project Planning
  • Integrating Efficiency
  • Review the Phases of Work, Work Activities, Work
    Tasks and Sub-Tasks in conjunction with the
    Project Schedule.
  • List the duration for each Phase of Work.
  • List the duration for each Work Activity
  • List the duration for each Work Task
  • Cross reference all durations with the project
    estimate and budget

21
Project Planning
Phase of Work
Work Activity
Work Task
Form Reinforce
Sub Tasks
Integration of Safety, Quality, Efficiency
starts at this point of the process
22
Project Planning
  • Safety
  • Section-5 Concrete
  • Section-9 Excavation
  • Section-12 JHA
  • Quality
  • Soil Testing
  • Concrete Testing
  • Reinforcing Insp.
  • Layout Verification
  • Efficiency
  • 20 Days Foundations
  • Layout 2 days
  • Fine Grade 5 days
  • Estimated Cost
  • Structural (Phase of Work)
  • Foundations (Work Activity)
  • Layout ( Work Task)
  • Fine grade
  • Forming (set/strip)
  • Reinforcing
  • Concrete Embedment
  • Place/finish concrete
  • Backfill

23
Project Planning
  • Assemble collected information for each Phase of
    Work and determine activities that occur
    concurrently.
  • Evaluate how these activities will interact and
    list the challenges associated with Safety,
    Quality and Efficiency.
  • Look for the same safety, quality and efficiency
    type activities. Is there an opportunity to
    consolidate, simplify, or innovate the process.

24
Project Planning
  • Safety
  • Equipment Access
  • Personnel working adjacent to equipment
  • Equipment Training
  • Quality
  • Material Staging
  • Efficiency
  • Soil Testing (required by
    all activities)
  • Layout Verification (required by 2
    activities)
  • Consolidate Safety Training
  • Foundations
  • Utilities
  • Backfill

25
Project Planning
  • Assembling the Plan
  • The plan will consist of several components
  • Site Utilization Plan
  • Phase of Work Plans
  • A Project Schedule
  • A list of High Risk Activities and their
    mitigation
  • A list of Quality Activities (inspections
    submittals)
  • Budget Estimate
  • List of Best Practices
  • Lessons Learned

26
Project Planning
  • Assembling the Plan
  • Take the information you have collected and
    transfer it to the appropriate contract drawing.
  • Make references to the project manuals as
    required.
  • Zero Injury Manuals
  • Quality Plan
  • Specifications
  • Submittals
  • Project Schedule
  • A plan that is communicated visually is
    comprehended faster than written text.

27
Project Planning
  • Communicating the Plan
  • Forward the plan to ALL subcontractors. Get their
    feedback and make adjustments as required.
  • Remember MORTENSON IS MANAGING THE PROJECT.
  • Distribute the final plan to all Project Team
    Members
  • Post the plan in a conspicuous location.
  • Review the plan during all project meetings

28
Project Planning
  • Implement and Up-Date the Plan
  • Use the plan to manage the project. Insure
    subcontractor/suppliers are following the plan.
  • Keep the plan Up Dated. As a project changes the
    plan must change also. As subcontractors join the
    project the plan that we present must be
    accurate.

29
Project Planning
  • Evaluate the Plan
  • Continuous evaluation of the plan is required.
  • Are Safety goals being reached?
  • Are Quality expectations being obtained?
  • Is the project on Schedule?
  • Is the project on Budget?
  • What can we do better?

30
Project Planning
  • Questions