Diapositiva 1 - PowerPoint PPT Presentation

About This Presentation
Title:

Diapositiva 1

Description:

... to TDC Transmit input OR optically to ... Programmable Majority Logic Reconf Controller CMOS-LVDS Driver FPGA (Spartan IIE) 13 (15) ORs Trigger 2 to ... – PowerPoint PPT presentation

Number of Views:36
Avg rating:3.0/5.0
Slides: 11
Provided by: F366
Category:
Tags: fpga | diapositiva

less

Transcript and Presenter's Notes

Title: Diapositiva 1


1
RPC Technical Trigger
Flavio Loddo I.N.F.N. Bari on behalf of Barrel
RPC Collaboration
2
RPC Technical Trigger
Phase I Sector Trigger for testing RPC (and DT)
during Commissioning
RBC (RPC Balcony Collector)
RPC Cosmic trigger
Phase II Technical trigger to be used during
off-beam periods for RPC (and other detectors)
calibration
RBC TTU (Technical Trigger Unit)
3
Block Diagram of RPC DAQ
4
RPC LBBox
In Barrel LBBox it is unused It can provide the
OR of 96 strips (half RPC)
5
Phase I RBC (RPC Balcony Collector) Main Features
Generic Barrel Sector
  • Receive 2x13 (or 15) ORs from LB (LVDS)
  • (OR of 96 strips (1 bi-gap half RPC))
  • Produce Sector Trigger
  • Mask noisy/dead Ors
  • Force selected ORs to be in the coincidence to
  • increase trigger selectivity
  • Majority level selectable between 1 and 6
  • I2C Interface
  • Re-Transmit input OR electrically (LVDS) to TDC
  • Transmit input OR optically to Counting Room (GOL)

RB4
RB3
RB2_OUT
RB2_IN
RB1_OUT
RB1_IN
6
RBC Block Diagram
CMOS-LVDS Driver
FPGA (Spartan IIE)
to TDC
LVDS-CMOS converter
13 (15) ORs
Programmable Majority Logic
Trigger 1
From 2 LBBoxes
13 (15) ORs
(2 sectors)
Trigger 2
GOL
Controller
Reconf
HFE4383
( Reconfigure FPGA every 5 mins to recover
eventual SEU loss of configuration)
to Optical PP
QPLL
Deskewed HF clock
I2C (from CB)
1 RBC per 2 sectors 6 RBC/Wheel 30 RBC/Barrel
40 MHz LHC Clock (from LB)
7
RBC Status
  • FPGA design is under development.
  • What was done
  • I2C Interface
  • Masking and Forcing feature
  • Trigger generation (but Im waiting for further
    input/suggestions from Users)
  • Still to do
  • GOL management
  • Board design .
  • .
  • Open issues
  • Board location
  • Fibers routing and patch panels
  • INFN Financial approval
  • .

8
Phase !! RPC Technical Trigger Implementation
USC area
UXC area
1 RBC/ 2 sectors
Fiber
Barrel Wheel
10 Optical Ribbons
1 Optical Ribbon/Half wheel
9
TTU (Technical Trigger Unit) Block Diagram
(Preliminary)
  • Receive optical link from RBCs
  • Combine ORs from 1 Wheel (or from Half Wheel)
  • ..

Programmable Majority Unit
TLK2501
TLK2501
Trigger
TLK2501
TLK2501
TLK2501
HFBR782
6 Fibers
Deskewed HF clock
VME Interface
QPLL
TTCrx
Comm. line
LHC Clock
10
Cost Estimation
  • RBC QPLLGOLVCSEL 100,00
  • FPGA 100,00
  • PCB 300,00
  • Various 100,00
  • NRE 1000,00
  • Tot (30 RBC) 20.000,00
  • Fibers (6000 m) 6000,00
  • 5 TTU 15000,00
  • 1 VME crate 5000,00
  • 1 VME controller (V2728) 3000,00
Write a Comment
User Comments (0)
About PowerShow.com