SEA PORTS CORPORATION - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

SEA PORTS CORPORATION

Description:

... - Marine structure 1.0 Commercial Harbour-Phase I 1200 1500 Piles-Beam Structure Cast-in-Situ Concrete ... Document presentation ... – PowerPoint PPT presentation

Number of Views:91
Avg rating:3.0/5.0
Slides: 23
Provided by: 5716
Category:

less

Transcript and Presenter's Notes

Title: SEA PORTS CORPORATION


1
??? ???? ?????? ????????????? ????????????
?????
???? ??????? ??????? SEA PORTS CORPORATION
  • ????? 2011?

2
????? ?????? ?????? ????????? ???????? (?????
????? ???????)
3
(No Transcript)
4
Site Conditions
5
???? ???????? ????? ?????? ????????? ??? ?????
?? ??? ???????? ?????? ???? ??? ???? ?? ???????
?? ??? ??????,???? ?? ?????? ?????? ????? ???????
?????? ?????? ????? ???? ???? ????? ???????
?????? ?? ????? ????? ??? ????? ?????? ??????
???? ?????? ??? ????? ?? ????? ?????? ??? ??
?????? ?????? ???? ???? ???????? ????? ???? ?????
??????? ?? ?????? ??? ??????? ????? ???? ??????
???????? ????? ?????? ?? ????? ??????? ????????
???? ?????? ?????? ????? ????? ??????? ??????
????????? ???????? ?????? ?? ????? ?????? ??????
????????? ????????? ????? ???????
6
?????????? ????? ?????? ?? ????? ???? ???????
???? ???? ???????? ??????? ?? ?????? ????? ?????
??????? ????? ???? 30??? ???? ????? ?????? ?????
?????? ?????? ????????? ???????? ???? ????? ????
????? ???? ?????? ???? ??????? ?? ?????? ??????
?? ???? ?????? ????? ??????? ??? ??????? ?????
????? ?????? ??????? ???????? ???????
7
(No Transcript)
8
??????? ??????? ????? ????? ???????
1- ??????? ??????? (???????
??????) 2- ??????? ???????? 3- ????? ???????
9

????? ??????
????? ???? ?????? ?????????
????? ???????
10
1.0 Commercial Harbour
  • Location
  • Locates about 30Km to south of Sawakin Port
  • Ports Functions
  • The third main commercial port in Sudan
  • Livestock and sealife
  • Other general cargo,such as cotton, vegetable
  • Processing Industry Base associated with
    livestock and sealife,etc.

11
1.0 Commercial Harbour
  • Planning Option

Phase II Processing Industry Base
Phase I
Phase I
20ha
50ha
22ha
18ha
Phase II General Cargo
Phase II General Cargo
12
(No Transcript)
13
1.0 Commercial Harbour
  • Optimized adjustment
  • Road Railway System
  • Location of livestock area and wind directions
  • Port facilities desalination center, lodging
    house/office, livestock canned treatment center
    and refrigerated container area
  • Power water supply system

Wave Rose
14
????? ???? ?????? ?????????-??????? ??????
  • ??? ??????  241? ???????? ??????  3.0??
    ?????  - 12.0
  • ??? ???????  3150000 ??? ???? ??? ?????  0.4
    ????? ????? ???????  ???? ??????? ? ?????
    ???? ?????? ????? ????????? ??????? ?????? ?
    ????? ??????? ???? ????? ?????? ???????
    ????????? ???? ?????? ???? ??????? ???? ?????
    ???? ????? ? ?????? ?????? ? ????? ???? ??????? ??
    ????? ???????? ????? ????????

15
1.0 Commercial Harbour-Phase I
  • Marine structure
  • Piles-Beam Structure
  • Foundation
  • Cast-in-Situ Concrete Pile
  • Superstructure
  • Beam and Slab

16
2.0 Travel Spot
TRAVEL SPOT
17
3.0 Fishery Services Base
  • Supposing fishery activity characteristic
  • Present fishery activities were not in the inland
    watercourse
  • The future developing fish boat is big enough for
    ocean type.
  • Aim to
  • Fishermen migration and re-settle-down
  • Development Chance of Fishery Industry

18
3.0 Fishery Services Base
2 solutions A In the independent area (at
south of commercial port) with independent
channel B At north of commercial port
Considering the vessel collision, it is suggested
independent fishery port and its independent
channel shall be considered.
SOLUTION B
SOLUTION A
19
3.0 Fishery Services Base
  • Fishery berths facilities (for solution B)

20
3.0 Fishery Services Base
  • Fishery berths facilities (for solution B)
  • 35000 m2 land area for fishery base.
  • 300m long quay will be constructed for fishery
    berths.
  • Utilizing the slop area of main entrance channel.
    This can reduce the probability of vessel's
    collision with the commercial vessel.
  • Taking advantage of the natural water area for
    fishery boats without additional channel basin
    dredging. (structure dredging may be needed.)

21
3.0 Fishery Services Base
But channel utilizing is a problem for commercial
vessel and fishery boats considering vessel
collision.
  • Suggestion Solutions
  • Improving management and communicating system for
    commercial port and fishery base.
  • Pilot needed
  • 2 locations for Preventing Collision between
    Vessels
  • In future, if needed an independent channel for
    fishery port shall be dredged.