Title: SPS Experiments on Long-Range Beam-Beam Compensation
1SPS Experiments on Long-Range Beam-Beam
Compensation
G. Burtin, J. Camas, G. de Rijk, G. Ferioli,
J.-J. Gras, S. Jackson, J.-P. Koutchouk, J.
Wenninger, F. Zimmermann, with help from lots
of groups!
- Summary
- Motivation
- LHC SPS Simulations
- Scaling
- MDs in 20022003
- BCT, PMT
- Future Devices
- Summary again
2Summary
- SPS BBLR Set Up models Long-Range Beam-Beam
Collisions - in the LHC so far 33 MDs performed in 2002
2003 - Tune shift orbit distortions well understood
they allow precise - determination of beam-wire distance
- Beam lifetime and loss measurements indicate LHC
parameters - at the edge (10 less crossing angle -gt beam
lifetime of 4 h) - Clear shrinkage of emittance due to BBLR its
dependence on - current and distance using calibration by
scraper, this was - converted into diffusive aperture (d.a.)
Irwins scaling law - confirmed (d.a.Sqrt(I)) d.a. might be only 2s
in LHC?! - Direct diffusion measurements started (limited
by PMT - signals, by scraper speed software), so far
difficult - Further MDs (upgraded scraper) analysis (e.g.,
1000 turns) - foreseen
- Two more devices in 2004 will demonstrate
correction efficiency - also allow comparison of various crossing
schemes
3Long-Range Beam-Beam Collisions
- perturb motion at large betatron amplitudes,
where particles come close to opposing beam - cause diffusive aperture (Irwin), high
background, poor beam lifetime - increasing problem for SPS, Tevatron, LHC,...
- that is for operation with larger of bunches
LR encounters
SPS 9
Tevatron Run-II 70
LHC 120
4LHC 4 primary IPs
and
30 long-range collisions per IP
120 in total
partial mitigation by alternating planes of
crossing at IP1 5 etc.
5result of weak-strong simulations for LHC
center of other beam
Y. Papaphilippou F.Z., LHC 99
diffusive aperture
6Long-Range Beam-Beam Compensation for the LHC
- To correct all non-linear effects correction
must be local. - Layout 41 m upstream of D2, both sides of
IP1/IP5
Phase difference between BBLRC average LR
collision is 2.6o
(Jean-Pierre Koutchouk)
7Scaling from LHC to SPS
perturbation by wire
relative perturbation
for constant normalized emittance the effect in
units of sigma is independent of energy and beta
function!
8Experimental Set-Up in the SPS
IwireNb e c LR/lwire
Tech. Coord. J. Camas G. Burtin/BDI Help from
many groups
wire length
wire current
two 60-cm long wires with 267 A
current equivalent to 60 LHC LR collisions
(e.g., IP1 5)
9nominal distance 19 mm (in the shadow of the arc
aperture)
water cooling
10 LHC long-range collisions SPS wire cause
similar fast losses at large amplitudes in
simulations
SPS wire
diffusive aperture
LHC beam
1 mm/s
1 mm/s
diffusive aperture
effect of the 1-m long wire at 9.5s from the
beam center, carrying 267 A current, resembles
the total number of long-range collisions in the
LHC
11MDs in 2002 and 2003
20/08/2002, 26 GeV/c IC and PMT reading vs.
position (threshold!), tune shift _at_120 A
DQx,y-/0.0060 10/09/2002, 26 GeV/c
commissioned new inductive coil, DT gt18o at 275
A, blew up ey by damper chirps (WH), DQ Dy vs.
bump _at_120 A 267 A 23/09/2002, 55 GeV/c blew up
ey by damper, vertical aperture problem emittance
shrinks for beam-wire distances lt12 mm, beam
losses lifetime vs. separation 27/06/2003, 26
GeV/c new dipole corrector, emittance shrinkage
if BBLR is excited 04/07/2003, 26 GeV/c blew up
emittance by mismatch, emittance shrinkage vs.
wire excitation 21/08/2003, 26 GeV/c kick pencil
beam, emittance shrinkage vs. separation,
calibration by scraping, diffusion measurement
12linear optics perturbations
orbit change Dd and tune shift DQ due to wire
(or due to other beam)
precise control of beam-wire separation!
13MD-2002-3
comparison with MAD prediction (J. Wenninger)
orbit kick
Qy
Qx
14MD-2002-23 beam-wire distance derived from
tune shift and from orbit change versus
prediction
prediction
15evidence for diffusion vs. beam-wire distance in
SPS MD-2002-3
9 s
9 s
background up
lifetime drops
below 9s!
logarithmic scales!
LHC at the edge of lifetime drop!
8 s
compare with LHC simulation
9.5 s
16MD-2003-1
final emittance reduced, if wire
is excited for large initial emittances it may
approach a constant value
dependence on initial emittance
17dependence on wire current
experiment of July 4, 2003, confirms Irwins
scaling law beam shrinks since particles at
large amplitude are lost
18Final emittance vs bump for 3 different BBLR
excitations
Reduction in emittance of the left outermost
point without excitation is consistent with
scraping at an amplitude of (19-13.4)mm 5.6 mm,
corresponding to 2.4 times the rms beam size of
2.3 mm. This is also the dynamic aperture for
267 A w/o bump.
dependence on beam-wire separation
19Scraper at 3.05( 0.88)mm gives eOUT1.7 mm, no
BBLR
IN Scan at 100 ms
OUT Scan at 3200 ms
Note orbit bump and LRBB excitation from 1500 ms
Bump 11.6 mm for BBLR _at_67 A gives eOUT2.2 mm
Bump 9.4 mm for BBLR _at_267 A gives eOUT1.15 mm
20Abel transformation of wire-scan data gives
change in (norm.) amplitude distribution
(Krempl, Chanel, Carli)
BBLR 267 A, bump 4.5 mm eout2.06 mm
scraping at 3.06 mm, eout1.71 mm
scraping at 2.06 mm, eout1.31 mm
BBLR 267A Bump 9.4 mm, eout1.15 mm
21Calibration curve of measured final emittance vs
scraper position allows us to estimate effective
aperture due to BBLR excitation
Calibration measured final emittance vs. scraper
position
22scaling to the LHC d.a. only 2-3 s?
23Example of BCT PMT data
BBLR at 12725 ms, scraping at 13225 ms
only BBLR (at 12725 ms), w/o scraping
PMT
PMT
BCT
BCT
can we fit a diffusion constant?
on the right, scraper position is about 1s at
larger amplitudes the diffusion seems much faster
than the speed of the scraper
24Extension 1 Compensation
- Goal demonstrate the correctability of the LR-BB
effect for LHC conditions - Betatron phase shift (2 degrees)
- Wire out of beam aperture (12 ? instead of 9.5 ?)
- Excitation error say 10
- Set-up a second identical device in LLS5 about 2
m away vertical motion same quality (vacuum
compatibility) larger safety vs SPS aperture.
25Extension 2 Long-Distance Compensation
Crossing Schemes
- compensation over long distance with variable
phase advance and independent xy orbit bumps at
two wires y wire - this will confirm the practicability of the
compensation scheme for the LHC with reduced
systematic cancellations explore tolerances - compare effects of alternating x-y crossings at
two locations (LHC baseline) with 2 times
stronger collision at 45 degrees - inclined
hybrid crossing - and with pure vertical or pure
horizontal crossing other 2 wires this will
probe the sensitivity to the LHC crossing scheme
and assess present choice
26schematic of 2nd and 3rd device
clearance required to stay in the arc shadow 19
mm (y), 51.5 mm (x), 26.5 mm (45 deg)
272nd 3rd devices will be mobile with wires in
different planes (G. Burtin)
28Summary
- SPS BBLR Set Up models Long-Range Beam-Beam
Collisions - in the LHC so far 33 MDs performed in 2002
2003 - Tune shift orbit distortions well understood
they allow precise - determination of beam-wire distance
- Beam lifetime and loss measurements indicate LHC
parameters - at the edge (10 less crossing angle -gt beam
lifetime of 4 h) - Clear shrinkage of emittance due to BBLR its
dependence on - current and distance using calibration by
scraper, this was - converted into diffusive aperture (d.a.)
Irwins scaling law - confirmed (d.a.Sqrt(I)) d.a. might be only 2s
in LHC?! - Direct diffusion measurements started (limited
by PMT - signals, by scraper speed software), so far
difficult - Further MDs (upgraded scraper) analysis (e.g.,
1000 turns) - foreseen
- Two more devices in 2004 will demonstrate
correction efficiency - also allow comparison of various crossing
schemes