Title: Request for Environmental Services (RES)
1Request for Environmental Services (RES) Missouri
Local Programs How to Complete The Request for
Environmental Services
2Why Submit the RES Form?
- Every federally funded transportation project
must have an environmental classification. - Most project receive a categorical exclusion
commonly known as a CE - The form also helps the environmental
specialists at MoDOT identify additional
clearances that might be necessary.
3When Do We Submit the RES Form?
- Submit the RES within 30 days of PE obligation or
early in the design phase of the project. - FHWA must approve the NEPA classification prior
to 35 plan completion. - The Section 106 clearance NEPA classification
must be approved before Right of Way acquisition
can begin.
4Infrastructure Projects
5Filling Out the RES Form Basic Information
- The top sections of the form include basic
location information and cost data. Enter the
project data into each cell. - The project cost estimate for each category
should be entered into the cost estimate boxes.
A 60,000 estimate for PE would be entered as
60.
1. Suburban City
5. MO 7
2. STP 1234(567)
6. Transportation Enhancement
7. None
3.
4. 1000234
8. February 28, 2012
9. This project is to construct a sidewalk
from I-70 to US 40 Highway
In this example, the LPA should enter the Agency
Name in box 1.
6Cost Estimate Information
Cost Estimate Breakdown (In 1,000)
PE R/W Roadway Bridge Inspection Utility Total
Cost Estimate 60 400 20 480
7Filling Out the RES Form Facility Information
- The next sections ask for engineering information
about the existing facility and the proposed
design improvement.
EXISTING CONDITION PROPOSED DESIGN IMPROVEMENT
Functional Classification Functional Classification Functional Classification
ADT ADT ADT
Speed Limit Speed Limit Design Speed
Number of Travel Lanes Number of Travel Lanes Number of Travel Lanes
Lane width Lane width Lane width
Shoulder width Shoulder width Shoulder width
Curb gutter? Yes/No Curb gutter? Yes/No Curb gutter? Yes/No
Bridge width, measured from gutterline to gutterline Bridge width, measured from gutterline to gutterline Bridge width, measured from gutterline to gutterline
Sidewalks? (Lt/Rt./Both/None) Sidewalks? (Lt/Rt./Both/None) Sidewalks? (Lt/Rt./Both/None)
Sidewalk width Sidewalk width Sidewalk width
Parking Allowed (Y/N) Parking Allowed (Y/N) Parking Allowed (Y/N)
Bridge Length Bridge Length
Roadway Length Roadway Length
8Filling Out the RES Form Facility Information
- To help the environmental team assess the project
area, the impacts of the projects on nearby
natural and man-made features must be identified.
This section identifies features, such as nearby
parks, underground fuel tanks and required right
of way.
ADDITIONAL INFORMATION
Topography ? (Flat/Rolling) Topography ? (Flat/Rolling) Topography ? (Flat/Rolling)
Railroad Crossing ? Y/N Railroad Crossing ? Y/N Railroad Crossing ? Y/N
Drainage District (if applicable)? Drainage District (if applicable)? Drainage District (if applicable)?
Is the project on or adjacent to MoDOT ROW? Is the project on or adjacent to MoDOT ROW? Is the project on or adjacent to MoDOT ROW?
Will additional right of way or easement be acquired? (Y/N) Will additional right of way or easement be acquired? (Y/N) Will additional right of way or easement be acquired? (Y/N)
Est. additional ROW (in acres) Est. Perm. Easements Est. Temp. Easements
Right of way acquisition by (Consultant/Local Agency/Other) Right of way acquisition by (Consultant/Local Agency/Other) Right of way acquisition by (Consultant/Local Agency/Other)
Design by (Consultant/Local Agency/Other) Design by (Consultant/Local Agency/Other) Design by (Consultant/Local Agency/Other)
ROW or Easements from Parks/Public Lands? (Y/N) ROW or Easements from Parks/Public Lands? (Y/N) ROW or Easements from Parks/Public Lands? (Y/N)
Any residential/commercial displacements? (Y/N) If yes, give detail of how many and whether residential and/or commercial Any residential/commercial displacements? (Y/N) If yes, give detail of how many and whether residential and/or commercial Any residential/commercial displacements? (Y/N) If yes, give detail of how many and whether residential and/or commercial
Any known locations of gas stations, landfills, other hazardous waste concerns? (Y/N) If yes, describe Any known locations of gas stations, landfills, other hazardous waste concerns? (Y/N) If yes, describe Any known locations of gas stations, landfills, other hazardous waste concerns? (Y/N) If yes, describe
9Filling Out the RES Form Non-Infrastructure
Information
- The RES form has a few questions for
non-infrastructure projects. These types of
projects could be vehicle purchases, research and
outreach or education projects and studies or
preliminary engineering only projects.
For non-infrastructure projects only Will the project identify future infrastructure improvements (Y/N) If yes, what kind?
For non-infrastructure projects only Expected final product submittals (ex Feasibility Study, Summary Report, Estimate, Outreach Efforts Documented, etc.)
10Filling Out the RES Form Flood and Hydraulic
Design
- This section of the form identifies impacts on or
near waterways.
NATIONAL FLOOD INSURANCE PROGRAM (NFIP) AND
HYDRAULIC DESIGN DATA
Is Local Agency a participant in the NFIP?
Is the project in a FEMA-identified Zone, subject to 100-year flooding? (If so, what Zone?)
Is the project in a FEMA-defined floodway?
Does the project involve land purchased through FEMA Hazard Mitigation Grant Program (Flood buyout property)?
REMARKS
11The End!