Group 1 GenerationofClimateInformationforApplicationandAdaptation - PowerPoint PPT Presentation

About This Presentation
Title:

Group 1 GenerationofClimateInformationforApplicationandAdaptation

Description:

Stakeholders San Juan, La Rioja, Mendoza, Neuqu n, R o Negro (Alto Valle) EnergyandWater Management Windenergy (IMPSAT, others?) Solar in La Rioja Hydro: ... – PowerPoint PPT presentation

Number of Views:38
Avg rating:3.0/5.0

less

Transcript and Presenter's Notes

Title: Group 1 GenerationofClimateInformationforApplicationandAdaptation


1
Group 1GenerationofClimateInformationforApplicati
onandAdaptation
  • JoseBoninsegna, Jean-Philippe Boulanger, Andrea
    Carril, Elvira Gentile, Hervé Le Treut, Laurent
    Li, Claudio Menéndez, Mario Nuñez, Pablo Ristori,
    Celeste Saulo, Silvina Solman

2
  • Mainsuggestion
  • Define thestudyobject, takingintoaccountregions/se
    ctors more vulnerable toweather/climate

3
  • Sectors
  • Hydropower
  • Agriculture
  • Tourism (snow)
  • Insurance
  • Seamlessinformationtopredicton a varietyof time
    scales (weather, seasonal, decadal, CC)
    weather/climaterisks AND adaptationstrategies

4
Suggestedmethodology
  • Identifykeystakeholderstobuildtherationaleofthepro
    ject (bootom-up)
  • Integratedprojectcombiningtheoreticaldevelopments
    (Andes), modeldevelopments/improvements
    (seelater), methods, social studiesandcustomizedpr
    oducts (bottom-up/top-downinteractions)
  • Pilote studytobuildanintegrated/appliedmethodology
    adressingclimate/weatherriskswithstakeholdersfromt
    hestart Theobjectiveisto define how thingsshould
    be done in termsofprovidingclimateservices.

5
SpecificModellingTopics
  • Snow (pack, melt,) Glaciars
  • Inclusionofdynamicvegetation
  • Effectofmountain-drag convection
  • Snowcoverobservations (satellitein-situ)
  • Addedvaluesofhigh-resolutionmodelswithrespectto
    global models in thisregion
  • LIDAR Data (San Juan) toevaluate/calibratemodels
    CALIPSO satellite (withembarked LIDAR)
  • Proxies (at different time scales)
    ofspecificrisks (hail, drought,)

6
Project Scheme
  • WorkwithSpecificSectors
  • Needs
  • Communication
  • - Adaptation
  • Modelling
  • Theoretical
  • Improvements
  • SeamlessForecasts (anduncertainity)

Data Collection andhomogenization In-situ Satellit
e Modeloutputs
Climate Services
7
Questions- Shallweconsider a frenchcounterpart
(south Alpes)?YES (Meteo-France, IPSL, CEMAGREF)
butafter a firstdraftoftheproposalwrittenonourregi
on- Chileanpartners- Link with PPR RIVIA?
8
StakeholdersSan Juan, La Rioja, Mendoza,
Neuquén, Río Negro (Alto Valle)
  • EnergyandWater Management
  • Windenergy (IMPSAT, others?)
  • Solar in La Rioja
  • Hydro
  • COMAHUE
  • Pampa Energy-HINISA/HIDISA
  • Departamento de irrigacion
  • Agriculture/Forest
  • WineyardCooperative
  • NationalInstituteofViticulture (qualityofthewines
    in Argentina
  • CooperativeofGarlicproducers
  • FruitproducerCooperatives (Mendoza, Rio Negro)
    EXPOFRUT/Moño Azul/?
  • Agencia Nacional del Fuego (Fires)-SMN
  • Tourism
  • Ski resorts
  • Mountaintourism (summer)
  • Wine Touring
  • National Parks
  • Insurance
  • Hailandfrostinsurance (La Segunda, Sancor, )
  • Mining
  • ??

9
TimelineMayo-Agosto Identificacion de
stakeholdersDiseño de cuestionario con
identificación de los eventos de riesgo y de los
lead-time necesarios para sus tomas de
decisión.Entrevistas con un grupo selecto de
stakeholders para preparar una reunión más
adelante.Septiembre Reunión con stakeholders
y grupos científicos en Mendoza (propuesta de
Pepe Necesidad de apoyo financiero CONICET/UMI
para viajes, viáticos y gastos de
reunión).Output esperado Lista exhaustiva de
riesgos climáticos, información esperada por los
stakeholders y claridad sobre lo que la
investigación podría aportar como respuestas.
Diseño del rational, de los objetivos y de la
estructura general del proyecto.Octubre-Diciembr
eElaboración de una propuesta concreta.
Identificación de competencias faltantes en el
grupo.Contactos con partners en Argentina y en
Francia (propuesta de transferencia de
competencia más que elaboración de un Twin
Project)2012Finalización de la propuesta y
puesta en forma especifica para el llamado
selecto.
10
Events
Write a Comment
User Comments (0)
About PowerShow.com