1
Off Shore Platform Modularization
  • Necessity, Not An Option

2
Necessity?
  • Consider The Job Site
  • Green Field
  • Brown Field
  • Blue Field

3
Blue Field Job Site
4
What Is In An Off Shore Platform?
7 Decks
10 Packages Decks
  • Cellar
  • L Mezzanine
  • Production
  • U Mezzanine
  • Weather
  • Drilling
  • Heli Deck
  1. Skid Base
  2. Drilling PKG
  3. Pipe Barn
  4. Generator Bldg
  5. Living Qtrs
  • Flare Boom
  • Stair Tower
  • Pedestal Crane
  • Bridge Cap
  • DSF

5
Modular Build
  • By Deck
  • By Blocks Per Deck
  • Bottom Up Literally

6
Assembly Sequence
7
Assembly
8
.
Top of A53 Shaft
GBS Site Tower Crane View
A51 Cover Deck Installed
A54 Shaft, DCL
9
.
LMD PE Pre-Erection Block 32B - Outfitting
LMD PE Pre-Erection Block 33D -
Outfitting
CD Mechanical Installation and Outfitting
LMD PE Pre-Erection Block 33E - Outfitting
10
Modular Installation
  • GBS
  • Topsides

11
Installation
12
Off Shore Platform Modularization
  • The End