Title: LCS Mission Modules ILS
1LCSMission Modules ILS
Robin Kime PEO LMW PMS 420L (202) 781-2546
2LCS Mission Modules Description
- The LCS is composed of a Seaframe and installed
reconfigurable Mission Packages - Benefits
- Modular and configurable to meet mission needs
- Open systems architecture supporting technology
refresh and spiral development - Vision LCS will provide a cost effective
reconfigurable and upgradeable platform and
mission packages focused on specific littoral
warfare area. LCS will allow the concentration of
force against specific threats while enabling
high cost multi-function ships to concentrate on
other mission areas.
3LCS Mission Package (MP) Support Overview
PMS 420 LCS Mission Modules
- Legacy Fleet Processes / National Systems
- Process Changes to Support MP
- Distance Support Concept
- Shore
- MP Specific Support Requirements
- Fleet Concerns
- NOTIONAL Timeline for Addressing Fleet Concerns
4 PMS 420 LCS Mission Modules
Ship Systems Legacy Parts and Maintenance
Reporting Process
NTCSS Application (OMMS-NG)
Parts Issues
3M - Effectiveness
SIM
Parts Demands
Allowance Products Scheduled COSAL
(opt.) CILS-TAT (opt.) MAMs COSAL
Refresh Remove Monthly ASI (not opt.)
4790/CK Configuration Changes
4790/2K Maintenance Actions
Configuration Changes
5Sea Frame
LCS Communication Support
Template / Transactional Storage (Disconnected
Ops)
WEB Forms/ Interface Applications
DS2
MSD
Ship
Mission Package
DS2
- 1. Ship enters information
- 2. Converted to Template
- 3. Stored and transferred on DS2/NIAPS
- Shore DS2/NIAPS system transfers data to to MPSF
instances of NTCSS/SNAP - Recommend standardizing on Ships 3-M Reporting vs
Aviation 3-M Reporting Systems - Minimal training required.
6MSD / ISIC / MPSF ORGANIZATION
ISIC
BLDG 55
CO
ISIC N4 TECHNICAL
ISIC N41 LOGISTICS
ISIC N44 MAINT OFF
MARITIME SUPPORT DETACHMENT AT FISC AND SWRMC
3MC
SMMO
FISC LOGISTICIAN
PORT ENGINEER
FISC (LST)
RMC (MST)
MPSF
7MP ShipShore Communication
PMS 420 LCS Mission Modules
Mission Package Support Facility (MPSF)
SUW
ASW
NTCSS UIC 2
NTCSS UIC 1
DS2/NIAPS
MP DS Portal to NIAPS Server
MP communicates w/Ships DS2/NIAPS server to Shore
DS2/NIAPS server Shore DS2/NIAPS server
communicates w/ appropriate Mission Package NTCSS
server (e.g. MIW) 3 Distinct Mission Area UICs
with Mission Package Work Centers Mission
Packages Identified as specific Work Centers
comprised of multiple mission modules/containers
MIW
NTCSS UIC 3
Work center 2
Work center 1
MM
MM
MM
MM
MM
MM
8 MP Unique Support
PMS 420 LCS Mission Modules
- Maintenance
- Limited at-sea corrective repair. Most deferred
to shore MPSF except for Mission ending failures - Maintenance reporting done at MPSF
- O I-Level Corrective and PMS Reporting at MPSF
accomplished using Mission Area NTCSS (OMMS-NG) - At sea Limited Corrective and PMS repair
Reporting done using DS2.0 Forms communicated
back to the OMMS-NG at the MPSF (short term) - PMS limited at-sea to Periodicities of 30 days or
less - Allowance Outfitting Inventory
- Afloat Load Out Allowances Based on LCS MM
OLevel Afloat Maintenance Plans - Corrective Critical, Items with a high
probability that would cause a C-3/C-4 CASREP - Planned Maintenance Essential PMS Items only
- Load Out Items Provided as Pre-expended BIN
- MPSF Mission Area Allowances (Ashore O Level
Allowances - Determined for each Mission Area (UIC)
- Virtual Inventory managed at FISC and issued
when needed - PBL Support Items
- Maintenance and Supply Reporting managed by PBL
Contractor - May require additional system/PBL Back up stock
due to stringent operational scenarios -
9 MP Unique Support
PMS 420 LCS Mission Modules
- Manning
- MSDs
- Leverage Existing ISIC/MSD SMMO for
data/inventory management - Re-supply
- Shelf life item management
- Leverage 3MC
- 2Kilos development
- Leverage FISC Log/Port Eng
-
-
10Typical Maintenance Functional Requirements
- General PMS Requirements
- PMS Schedules
- Viewing/Printing PMS Documents
- PMS Workflow Requirements
- Feedback Reports
- Afloat Master Job Catalog (MJC) Functionality
- Corrective Maintenance (Connected Operations)
- Planned Maintenance (Disconnected Operations)
- Corrective Maintenance (Disconnected Operations)
- Non-Maintenance Related Requirements
- Work Candidate Status
- Non-Maintenance Related Requirements Status
11Shipboard Maintenance Process Flow
ChartsConnected Ops
PMS 420 LCS Mission Modules
NO
Proceed to D Level Process
12
12Shipboard Maintenance Process Flow
ChartsDisconnected Ops
PMS 420 LCS Mission Modules
13
13 Typical Supply Functional Requirements
- Material Receipt, Stowage and Inventory
Management - Spot Inventories
- Material Issue
- Issue Criteria
- Search Criteria
- Issue Directives Import/Export Feature
- Issue Processing
- Issue Labeling
- Proof of Receipt/Delivery and Transshipments
- Management of Issue Directives
- Issues During Disconnected Operations
- Material Issue (Disconnected Operations)
- Battle Casualty Issue Flow
- Material Offload
- Carcass Management and Tracking
- Material Turned Into Stock
- Management of Other Commodities
14Process Flow Maintenance and Supply
PMS 420 LCS Mission Modules
15
15Fleet Concerns
PMS 420 LCS Mission Modules
- Inventory
- How will inventory be funded?
- Initial Inventory Provided by Mission Area PARMs
Using End Item Procurement Dollars - MPSF Allowances Managed by FISC as Virtual
Inventory under WCF - How will inventory be managed?
- Load Out Inventory Provided as Pre-Expended BIN
- Load Out and Ashore O Level Supply Issue and
Requisitioning Managed Ashore by MPSF via Mission
Area NTCSS - When will the inventory be replenished?
- Primarily upon return to MPSF
- Some Critical Items Replenished at Pit Stops
16Fleet Concerns
PMS 420 LCS Mission Modules
- Maintenance
- What will be the system to record maintenance?
- Long Term Solution ePMA to Mission Area shore
NTCSS (OMMS-NG) via DS 2.0 - Short Term Solution WEB Form via NIAPS/DS 2.0 to
Mission Area shore NTCSS
17Summary
- IT solution
- Leveraging existing requirements from SEAFRAME
- Fall Back Position will be vetted by DS Folks
- Processes
- Leveraging where possible
- Team approach to ensure correct fidelity
- SUP/SEALOG/ISEA/Fleet
- Action Tracking
- 420L POAM under construction
- Collaborative Action lists 420L/FLEET
- Combined Action Tracking in 420L IDE
- Regular update to the customer
18Back-up Information
19NIAPS Applications
PMS 420 LCS Mission Modules
- Include -webATIS 2.0 -ATIS 1.4 -ePMA v3.1 -DS
2.1 -SOMS v3.09 -TSIMS v8.1.3
-SKED v3.1/3.2 -OMMS-NG API -NKO Afloat
-LCMS -SCORM -Content Viewer -Navy E-Learning
-5VM -JASS/JCMS -NTMPS -NAFL - -ETJ -NTDPS
- Application Program Interface (API)
- Needs to be defined early by Afloat IT Solution
Integrator (SPAWAR Norfolk) - Leverage Sea Frame Solution w/ MM specific
requirements - Should identify where info needs to go (servers
on MP) - Information routing reflected in Webform