MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE - PowerPoint PPT Presentation

1 / 24
About This Presentation
Title:

MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE

Description:

MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE GIS POST-PROCESSING GIS POST-PROCESSING PREPARATION Power, USB/PC cable, Active Sync Connection Install ... – PowerPoint PPT presentation

Number of Views:39
Avg rating:3.0/5.0
Slides: 25
Provided by: JoeS51
Category:

less

Transcript and Presenter's Notes

Title: MOBILEMAPPER FIELD MOBILEMAPPER 6 MOBILEMAPPER OFFICE


1
MOBILEMAPPER FIELDMOBILEMAPPER 6MOBILEMAPPER
OFFICE
  • GIS POST-PROCESSING

2
GIS POST-PROCESSING
  • PREPARATION
  • Power, USB/PC cable, Active Sync Connection
  • Install MobileMapper Today on MobileMapper 6
  • ftp//ftp.ashtech.com/Mobile Mapping/MobileMapper
    6/Software/MobileMapper Software/MobileMapper
    Today/MobileMapper Today.zip
  • File on FTP site is zipped and must be extracted
    prior to installation
  • Execute MobileMapperTodaySetup.exe file on PC
    while MobileMapper 6 is connected via ActiveSync
  • MobileMapper Today is installed on to PC and then
    on to the MobileMapper 6
  • Install MobileMapper Office on PC
  • ftp//ftp.ashtech.com/Mobile Mapping/MobileMapper
    6/Software/MobileMapper Software/MobileMapper
    Software.zip
  • File on FTP site is zipped and must be extracted
    prior to installation
  • Execute Setup.exe file on PC to install
    MobileMapper Office to PC

3
GIS POST-PROCESSING
  • PREPARATION (Continued)
  • Install MobileMapper Field on MobileMapper 6
  • ftp//ftp.ashtech.com/Mobile Mapping/MobileMapper
    6/Software/MobileMapper Software/MobileMapper
    Software.zip
  • File on FTP site is zipped and must be extracted
    prior to installation
  • Execute Setup.exe file on PC to install software
    while MobileMapper 6 is connected via ActiveSync
    and install the MobileMapper Field software to
    MobileMapper 6. MobileMapper Field is installed
    to the PC and then on to the MobileMapper 6
  • Versions
  • MobileMapper Today (MobileMapper 6) V 1.0.0.15
  • MobileMapper Office (PC) V 1.0.1.3
  • MobileMapper Field (MobileMapper 6) V 1.00
  • GNSS Toolbox (MobileMapper 6) V 1.00
  • Installed as part of MobileMapper Field

4
GIS POST-PROCESSING
  • PREPARATION (Continued)
  • Licensing
  • MobileMapper Office (PC) requires no license
  • MobileMapper Field (MobileMapper 6) must be
    licensed with activation code
  • Program will not open without license
  • Post-processing for MobileMapper Field must be
    licensed with activation code
  • Code requested when selecting Record raw data
    for post-processing box inside the Recording
    tab under the Options dialogue boxes

5
GIS POST-PROCESSING
  • OUTDOOR FUNCTIONALITY TESTS
  • Outdoors cannot be simulated using GNSS Toolbox
  • Satellites tracking
  • Raw data logging Has this option been licensed
    and is there sufficient memory?
  • Ground truth against known data Does the
    computed position appear correct?

6
GIS POST-PROCESSING
  • DATA COLLECTION
  • Advice
  • Software activation codes require the user to put
    the MobileMapper 6 into suspend mode or the code
    will be lost. With that task done once, it can be
    powered on and off without losing the code.
  • Use MobileMapper Today to set the clock every
    time it is turned on to ensure that the clock is
    set properly before using MobileMapper Field. It
    is the first clue that the MobileMapper 6 is
    ready for work. Manually setting the clock does
    not ensure that the clock is set properly.
  • Good PDOP does not ensure good accuracy.
    Consider the quality of the GPS signal. One
    customer who complained about accuracy sent
    photos showing the receivers lying on the
    ground. Signals bouncing off the ground are
    multipath.

7
GIS POST-PROCESSING
  • DATA COLLECTION (Continued)
  • Advice (Continued)
  • Do not expect CORS reference data on the same day
    of recording.
  • Accuracy has as much to do with the 10 minutes
    before and after the feature was recorded as it
    does the ten seconds spent recording a point
    feature.
  • Common mistakes and things you should NOT do
  • Raw data recording begins before the clock is set
    or before there is a stable DGPS solution.
  • Raw data recording is halted between feature
    mapping resulting in dozens of tiny raw data
    files, none of which will process properly.
  • Raw data recording of such short duration that it
    will not process. Many of these contain
    ephemeris files too tiny to have recorded the
    current ephemeris. Good rule of thumb is that a
    file less than 20 minutes long is wasted effort.
  • Feature mapping that begins within seconds of
    starting the raw data recording.
  • Put receiver in pocket while walking between
    features to be logged..

8
GIS POST-PROCESSING
  • DATA COLLECTION (Continued)
  • Orient GPS unit against the local sky
  • Ensure satellite tracking
  • Ensure DGPS solution if in an SBAS coverage area
  • MobileMapper Field basics
  • Main screen
  • Position icon
  • DOP
  • Solution type
  • Easting/Northing
  • Scale
  • Menu
  • Log

9
GIS POST-PROCESSING
  • DATA COLLECTION (Continued)
  • MobileMapper Field basics (Continued)
  • Menu
  • Pause/Resume
  • Stop
  • Layers
  • Job
  • Options
  • Status
  • Exit (not the X)

10
GIS POST-PROCESSING
  • DATA COLLECTION (Continued)
  • Create New Job

11
GIS POST-PROCESSING
  • DATA COLLECTION (Continued)
  • Create New Layer
  • Point Feature

12
GIS POST-PROCESSING
  • DATA COLLECTION (Continued)
  • Create New Layer (Continued)
  • Point Feature (Continued)

13
GIS POST-PROCESSING
  • DATA COLLECTION (Continued)
  • Add another layer
  • Line Feature

14
GIS POST-PROCESSING
  • DATA COLLECTION (Continued)
  • Add another layer (Continued)
  • Line Feature (Continued)

15
GIS POST-PROCESSING
  • DATA COLLECTION (Continued)
  • Add another layer (Continued)
  • Polygon Features

16
GIS POST-PROCESSING
  • Data Collection (Continued)
  • Turn on raw data recording
  • Menu / Options
  • Choose memory location
  • Check box and then OK
  • Wait a few minutes in clear view of the sky
    before recording features.

17
GIS POST-PROCESSING
  • Data Collection (Continued)
  • Collect (Log) four points describing a rectangle

18
GIS POST-PROCESSING
  • Data Collection (Continued)
  • Collect (Log) four points describing a rectangle
    (Continued)

19
GIS POST-PROCESSING
  • Data Collection (Continued)
  • Collect (Log) four lines describing the same
    rectangle

20
GIS POST-PROCESSING
  • Data Collection (Continued)
  • Collect (Log) a polygon describing the same
    rectangle

21
GIS POST-PROCESSING
  • Data Collection (Continued)
  • Turn off raw data recording
  • Wait a few minutes after recording last feature
  • Menu / Options
  • Deselect check box and then OK

22
GIS POST-PROCESSING
  • Post-Processing
  • Submit raw data files to Joe Sass for
    pre-analysis
  • jsass_at_ashtech.com
  • All shape files (.shp, .prj, .shx, .dbf) in
    targeted directory
  • GPS Raw Data in its own folder (.grw and .crw)
  • Reference data Preferably 1 second data rate
  • Rinex data from local CORS
  • G file from ProMark/ProFlex 500 base station
  • Create new or open existing Map project in
    MobileMapper Office
  • Activate collected SHP files from the data
    collector
  • Import Rover raw data from the data collector
  • Import Reference raw data from file or internet
  • Enter correct reference station position
  • Post-process data
  • Export or transfer data to destination software

23
GIS POST-PROCESSING
  • Follow-up webinar scheduled for

24
GIS POST-PROCESSING
QUESTIONS?
Thank you for your time and attention.
Write a Comment
User Comments (0)
About PowerShow.com