Title: FET Environmental Primer Air Regulations: Permitting Basics
1FET Environmental Primer Air Regulations
Permitting Basics
- Steven Klafka, P.E.
- Wingra Engineering, S.C.
- Madison, Wisconsin
- www.wingraengineering.com
2Air Quality Permit Overview
- WDNR responsible for permit issuance
- USEPA oversight
- Construction permits for new sources
- Operation permits for existing sources
3Air Pollution Sources
- Operations Issued Air Quality Permits
- Stationary - Process or Point
- Stationary - Factory or Facility
- Portable - Asphalt Plant
- Indirect - Parking Lots and Highways
- Not Issued Air Quality Permits
- Area - Small Boilers, Wildfires
- Mobile - Cars, Trucks, Busses
- Off Road Lawn mowers, Snowmobiles
4Wisconsin VOC Emissions
5Air Pollution Sources Issued Permits
- Burning of fuels or wastes.
- Conveying or handling of dusty materials like
sand, wood shavings, etc. - Evaporation of solvents from painting, printing,
cleaning, gluing, storage, etc. - Chemical processing and reactions.
6Types of Emission Estimates
- MTE or Uncontrolled Need for Permit
- Full capacity 8,760 hrs/yr 0 collection
- Potential Determines Compliance
- Full capacity 8,760 hrs/yr Required
- Actual Reported for Annual Fees
- Actual capacity, hrs/yr and collection
7Sample Permit Calculations 1
- Shotblasting Operation with 99 Efficient
Baghouse - Capacity 2 tons per hour of metal
- USEPA Emission Factor 17 lbs TSP/ton of metal
- Applicable Discharge Limit NR 415.05(2) 3.59
P 0.62 - Comparison with General Permit Exemption
Thresholds - MTE 2 tph x 17 lbs of TSP/ton 34 lbs of
TSP/hr - gt 5.7 lbs TSP/hr, NR 406 construction permit
required - Actual 34 lbs/hr x (1 0.99) 0.34 lbs TSP/hr
- Potential 3.59 (2) 0.62 5.5 lbs TSP/hr
8Types of Emission Estimates
9CONSTRUCTION PERMITS
- Must be issued prior to construction or
modification of regulated sources. - NR 406 - Exemptions and Schedules
- NR 405 - PSD rules for Large Projects
- NR 410 Fees
- NR 411 Parking Lots and Roads
- NR 150 Environmental Assessment EIS
10Types of Specific Exemptions
- Natural gas-fired boilers lt 25 mmbtu/hr
- Wood-fired boilers lt 5 mmbtu/hr
- Paint/ink usage lt 1,666 lbs VOC/month
- VOC storage tanks lt 10,000 gallons
- Emergency generators lt 3,000 kilowatts
- Each state has own specific exemptions.
11Types of General Exemptions
- Uncontrolled emissions lt all permit thresholds
- 5.7 lbs/hr of total suspended particles (TSP)
- 3.4 lbs/hr of particles lt 10 microns (PM10)
- 9.0 lbs/hr of sulfur dioxide (SO2)
- 9.0 lbs/hr of nitrogen oxides (NOx)
- Thresholds for gt500 air toxics under NR 445
- Use specific exemption first, then general.
12Sample Permit Calculations 2
- Paint Spray Booth with 95 Efficient Filters
- Actual paint usage 600 gallons per month
- Maximum paint usage 1.5 gallons per hour
- Maximum VOC content 3.5 lbs VOC per gallon
- Maximum solids content 6.0 lbs solids per
gallon - Spray gun transfer efficiency 70
- Comparison with Specific Permit Exemption
Thresholds - Actual 600 gpm x 3.5 lbs/gal 2,100 lbs/month
VOC - gt 1,666 lbs of VOC/month exemption threshold
13Sample Permit Calculations 2
- Comparison with General Permit Exemption
Thresholds - VOC Emission Estimate
- MTE 1.5 gph x 3.5 lbs/gal 5.3 lbs/hr
- lt 5.7 lbs/hr general exemption threshold for VOC
- PM10 Emission Estimate
- MTE 1.5 gph x 6.0 lbs/gal x (1 - 0.7) 2.7
lbs/hr - lt 3.4 lbs/hr general exemption threshold for PM10
- ConclusionNo NR 406 construction permit is
required based on the general permit exemption
thresholds.
14Schedule and Fees
- Permit issuance within 2 to 12 months.
- 30-day public comment period.
- Public hearing if requested by public or
applicant. - 1,350 initial application fee
- 2,300 to 85,000 permit issuance fee
- NR 438 annual emission fee (35/ton)
15Criteria for Permit Approval
- Comply with emission limitations.
- Comply with air quality standards using
dispersion modeling analysis. - Standards include the NR 404 National Ambient Air
Quality Standards or NR 445 Acceptable Air
Concentrations for hazardous air pollutants. - Comply with current policies.
16Typical Permit Schedule
- Week 1 Submit application to DNR
- Week 5 Receive DNR request for information.
- Week 7 Respond to request for information.
- Week 11 DNR issues draft permit and PD.
- Week 12 Publish notice for public comments.
- Week 16 Public comment period ends.
- Week 18 DNR issues final permit and invoice.
17Expedited Permit Issuance
- Pre-application meeting with DNR.
- Submit a complete application.
- Anticipate DNR application review needs.
- Provide emission calculations.
- Comply with applicable requirements.
- Conduct DNR modeling risk analyses.
- Prepare environmental assessment.
- Anticipate public involvement.
18Recent Air Permit Enforcement
- 45,000 Failure to obtain permit.
- 45,600 Exceeded emission limits.
- 60,000 Failure to maintain records.
- 65,000 Failure to obtain permit.
- 71,820 Failure to maintain records.
- 86,450 Failure to raise stack.
- http//www.doj.state.wi.us/dls/environpro/news/
19Keys to Successful Air Permits
- Stay involved in review process.
- Review preliminary permit prior to official
draft permit. - Anticipate future production needs and provide
flexibility in permit. - Minimize unnecessary requirements.
20PSD Rules Add Complexity
- NR405-Prevention of Significant Deterioration
- Applies to new large sources
- Applies to modifications of large sources
- Additional permit issuance time
- Best Available Control Techology or BACT
- Pre-construction ambient monitoring
- Dispersion modeling for increments NAAQS
- Visibility, growth and vegetation analyses
21PSD Thresholds (tons/year)
Air Pollutant New Plant Modification
PM10 100/250 15
SO2 100/250 40
NOx 100/250 40
CO 100/250 100
VOC 100/250 40
Pb 100/250 0.6
22PSD Avoidance
- PSD rules uses potential emissions.
- Permit restrictions on capacity,operating hours,
or collection are considered. - PSD avoided to save permit issuance complexity or
processing time, or eliminate control
requirements. - Balance restrictions and future growth.
23Anatomy of an Air Permit
- Description of source or process.
- Emission limitations.
- Wis. Adm. Code citations.
- Record keeping requirements.
- Monitoring requirements.
- Testing and certification requirements.
- Reporting requirements.
24Sample Air Permit
25Construction Permit References
- Jeff Hanson, Construction Permit Leader
hansojc_at_dnr.state.us and (608) 267-6876 - Regional DNR Office Air Staff
- Air Permit Web Site
- http//www.dnr.state.wi.us/org/aw/air/reg/regs.
htm - Provides application forms, instructions,
issued and pending construction permits, and
modeling guidance. - Application Forms Instructions
- ftp//www.dnr.state.wi.us/DAW/AM/permits/AppForms/
- Issued Pending Operation Permits
- ftp//www.dnr.state.wi.us/DAW/AM/permits/OpPermit/
PmtDocs/
26OPERATION PERMITS
- Application must be filed for existing regulated
sources or prior to expiration of construction
permits. - Title V of 1990 Clean Air Act Amendments
(Congress) - 40 CFR Part 70 (USEPA)
- NR 407 - Exemptions Schedules (WI)
27Processes included in Permit
- Similar exemption thresholds as provided for
construction permits. - Includes processes which require a construction
permit if built today. - Includes minor processes which exceed NR 407
Table 2 inclusion thresholds (i.e. 2,000 lbs/yr).
28Types of Operation Permits
- FOP or Title V or Part 70 Permit
- 100 TPY PM, SO2, NOx, CO, VOC, Pb, Lower TPY for
VOC if located in ozone nonattainment area (SE
Wisconsin) - 10 TPY Federal Air Toxic or 25 TPY Combined Air
Toxics - Subject to most thorough review and compliance
demonstration. - Subject to MACT, if available.
- All applications for existing WI sources were due
by 1995.
29Types of Operation Permits Contd
- Federally Enforceable Synthetic Minor Permit
- Limits potential emissions by using operating
hours or production restrictions to remain below
thresholds. - Avoids MACT or other FOP requirements.
- All WI applications were due by 1995.
- Balance FESOP restrictions and future growth.
30Types of Operation Permits Contd
- SOP State Only Permit
- Required by state not federal rules.
- Potential emissions less than FOP thresholds
(i.e. 100 TPY) - Only annual compliance reports.
- All applications for existing WI sources were due
by 1998.
31Types of Operation Permits Contd
- Applications for all existing sources in
Wisconsin have been submitted to DNR. - Construction permits for new or modified
processes are replaced with operation permits
prior to expiration or incorporated into the
facility-wide operation permit.
32Operation Permit References
- Keith Pierce, Operation Permit Leader
pierck_at_dnr.state.us and (608) 267-0562 - Regional DNR Office Air Staff
- DNR Air Permit Web Site
- http//www.dnr.state.wi.us/org/aw/air/reg/regs
.htm - Provides application forms, instructions,
issued and pending operation permits, permit
application software. - USEPA MACT Web Site
- http//www.epa.gov/ttn/atw/eparules.html
33Air Permits in a Nutshell
- NR 406 construction permits required prior to the
start of construction or modification. - NR 407 operation permits are for existing
processes, or replace construction permits. - Review permits thoroughly before issuance to
assure accuracy and flexibility.