1
Operational Risk Management
2
Contingency Planning
Who Can We Rely On For Support ?
  • Are We Really Prepared ?

3
Support
  • Insure that there is complete support from senior
    administration, including funding
  • There needs to be concurrence on the objectives
    and scope of the plan
  • Identify both the required and available
    resources (internally and externally)
  • Establish a practical timeline that includes a
    phased-in approach
  • Identify realistic goals that are in keeping with
    established objectives

4
Information Management
Sign
The total of relevant knowledge is often called
intellectual capital. This includes not only
knowledge as a single conception, as an
individuals personal resource but as knowledge
of an organization appearing in patents, in
company-specific process models and routines.
Even culture and Customer supplier relationships
belong to intellectual capital.
5
Risk Assessment
Have you thought everything through ?
6
Risk Assessment
  • Risk assessment includes the following three
    components
  • Threats
  • Situations that impact an organization
    operationally and/or financially
  • Usually measure in terms of a what if
    probability
  • Time is measure by the amount of down-time and
    recovery-time is required
  • The relative probability of each threat must be
    estimated utilizing the following determinants

7
Threat Determinants
  • Geographic location
  • Topography of area
  • Proximity to major sources of power, bodies of
    water, and airports
  • Degree of accessibility to the organizations
    office and other locations
  • History of local utility companies in providing
    uninterrupted services
  • Previous experience of the areas susceptibility
    to natural, cyber or bioterrorism threats
  • Proximity to major highways which transport
    hazardous waste, combustible products, etc.
  • Proximity to nuclear power plants, chemical
    production facilities or military installations

8
Risk Assessment
  • ASSETS
  • Most organizations measure assets by virtue of
    physical attributes such as buildings,
    furniture, etc.
  • In addition, there are financial assets which are
    measured by either lost revenue, recovery costs
    and any fines or penalties that occur during any
    business interruption
  • A less tangible asset can be the decrease or loss
    of good will or any loss of a competitive stake

9
Risk Assessment
  • MITIGATING FACTORS
  • Usually associated with preventative measures
    that minimize loss and decrease downtime
  • Any policies and procedures that are developed to
    help protect and safeguard an organization and
    reduce the impact from threats
  • Examples can be as simple as security systems,
    fire suppression systems, UPS, and generator
    back-ups

10
Risk Assessment
  • Additional considerations
  • Telecommunications and information systems must
    be reviewed
  • Physical plant administration must also be looked
    at to include facility infrastructure such as
    HVAC, utilities, location, etc.
  • Business functions including staffing, downtime
    procedures and recovery requirements must be
    evaluated

11
Have you conducted a business impact analysis ?
12
Business Impact Analysis (BIA)
  • Organizational impact must be measured in four
    major categories
  • Operating system
  • Financial system
  • Legal
  • Regulatory

13
BIA Methodology
  • Identify and meet with Project Coordinator
  • Develop a user data collection document that
    helps define departmental or unit critical
    functions, applications and maximum acceptable
    downtime
  • Schedule a meeting with key personnel to review
    any additional project information and help guide
    them through the departmental or unit interview
    process

14
Background Information
  • The following are areas to be reviewed
  • Current state of contingency planning (BCP)
  • Existing operating systems and processes
  • On-site and off-site IM facilities and procedures
  • Directory of applicable IM software and users (by
    area)
  • IM hardware and connectivity

15
Interview Process
  • Evaluate by area the top priority requirements in
    the following areas
  • Critical Systems
  • High priority tasks
  • Downtime procedures (temporary)
  • IM outage policies and procedures
  • Physical plant requirements
  • Utility requirements
  • Personnel requirements
  • Minimum supplies and equipment
  • Recovery procedures

16
Other Considerations
  • Billing and collection functions are critical
  • Working capital will be difficult to determine if
    information on A / P and A / R are not accessible
  • Remember that you have legal (contractual)
    requirements to vendors and customers that may
    not be fulfilled
  • There are also regulatory deadlines are must be
    maintained (ie. State and federal tax filings)

17
Recovery Strategies
18
Recovery Classification
  • Functions must be classified in priority order
  • Priority I
  • Priority II
  • Priority III
  • Priority IV
  • Priority V

19
Priority I
  • Downtime is not acceptable.
  • Alternate site(s) with fully functional equipment
    and staff must be available
  • Recovery must be immediate

Priority II
  • A four to eight hour window exists for recovery
  • Alternate site(s) with fully functional equipment
    and staff must be available

20
Priority III
  • Downtime must not exceed 24 hours
  • Systems can be established anywhere (on-site or
    off-site)

Priority IV
  • 24 to 72 hour recovery period

Priority V
  • Greater than 72 hour recovery period

21
Recovery Resources
  • The next step is to identify resources (internal
    external) that are needed to support ongoing
    operations
  • Utilizing information garnered in the evaluation
    phase will assist with
  • identifying options
  • establishing priorities
  • identifying associated costs
  • reviewing the options with administration
  • gaining consensus to move forward

22
Associated Costs
  • It is wise to establish a table that identifies
    both the revenue impact and additional expense
    associated with BIA
  • This evaluation should be done by department/unit
    and should be performed utilizing a daily revenue
    impact
  • Short term disruptions may not result in an
    increase in direct costs or a decrease in revenue
    on a daily basis
  • Additional expense should be included based on
    the amount of time required to recapture data,
    charges, etc.
  • These can include DOL penalties, OT, one-time
    costs, new equipment purchases, etc.

23
Recovery Resources
  • A cost-benefit analysis must be performed that
    reviews the impact of the cost for recovery
    efforts weighed against the impact of NO recovery
  • Examples of recovery options may include
  • Transfer of duties
  • Temporary facility reconfiguration
  • Internal reciprocal arrangements
  • Back-up sites
  • External support
  • No formal arrangements

24
Recovery Options
  • Transfer of duties
  • This option assumes that other locations are
    available within an organization for work to be
    transferred.
  • Examples can be ambulatory medical facilities
    such as surgery centers, urgent care centers,
    satellite labs, etc.
  • For non-critical functions it may include
    off-site data storage facilities, payroll
    functions, human resources, etc.

25
Recovery Options
  • Temporary facility reconfiguration
  • This option allows for use of non-critical office
    space on the campus or in the building that can
    be used to facilitate more critical functions
  • Physical space that may be considered would
    include education /training rooms, conference
    rooms, unoccupied patient care units, etc.
  • Any temporary facility would need to be equipped
    with electrical, telecommunications, information
    management and office furniture

26
Recovery Options
  • Internal reciprocal arrangements
  • Pre-arranged agreements should be concluded with
    other departments or units within the
    organization that allow for temporary transfer of
    responsibilities
  • This may require that non-critical functions be
    placed on hold in the unaffected
    departments/units
  • It is helpful to periodically evaluate the
    unaffected departments/units ability to perform
    the task to be assigned.
  • This can be done during scheduled downtimes

27
Recovery Options
  • Back-up sites
  • Some organizations have constructed alternate
    locations either on the campus or near-by to
    support critical functions
  • This is a very costly investment and not done
    routinely
  • Some organizations contract with other
    organizations (refer to External Support)

28
Recovery Options
  • External support
  • Letters of Understanding must be developed with
    external support organizations to support
    business recovery efforts.
  • These may include
  • Telecommunications Data Recovery
  • Hotels schools
  • Utility Companies (Gas, electric, water)
  • Transportation (bus companies, trucking, heavy
    machinery)
  • Municipal offices (public safety)
  • Support Services (laundry, security, bldg./food
    services, staff departments)
  • Healthcare facilities (hospitals, ECFs,
    pharmacies)

29
Recovery Options
  • No formal arrangements
  • In some instances (non-critical functions) it is
    more cost efficient not to have formal
    arrangements
  • When making this determination, senior
    administration must be aware and accept the risks
    associated with this decision

30
Plan Definition
  • Plans must be flexible enough to respond to a
    variety of situations and timelines
  • The plan should enable the organization to
    initiate rapid recovery procedures for
    occurrences that exceed either 24, 48 or 72 hours

31
Contents Of A Plan
  • Executive Summary
  • Risk Assessment BIA
  • Identify Organization Contingency Planner
  • Definition of crisis management structure
    including
  • General responsibilities
  • Emergency Operations Center (EOC)
  • Notification systems
  • Event verification damage assessment
  • Management responsibilities
  • Ongoing communications

32
Contents Of A Plan
  • Recovery Activities
  • Public Information
  • Business Recovery Team Structure
  • Organizational Structure
  • Team definitions
  • Team Manager assignments
  • Testing Continuing Education Methodologies

33
Community Involvement
Who Can You Rely On?
34
Building Relationships
  • Develop solid relationships with both public and
    private sectors
  • This produces a win-win relationship
  • Remember, no organization can function
    independently when there is a disaster situation
  • Planning requires that you not have blinders on
    and that you seek out external resources as well
    as internal resources

35
Community Partnerships
  • Becoming active in community affairs allows an
    organization to have personal relationships and
    have a better understanding of the strengths and
    weaknesses of a community
  • There are many resources that need to be
    developed besides the obvious public safety
    departments such as
  • Emergency Management (local and state)
  • Emergency Medical Services
  • Fire Departments
  • Police Departments

36
Community Resources
  • Additional departments that need to be involved
    can include
  • FEMA
  • Utility Companies
  • City / County Government
  • National Guard
  • Water Companies
  • School Systems
  • Coast Guard
  • Red Cross
  • Etc.

37
Public / Private Cooperation
  • Developing public / private relationships
    benefits everyone
  • Governmental departments gain a better
    appreciation for private sector efficiencies
  • The private sector becomes a partner with the
    community
  • It is better to be part of the solution and
    ultimately the success of proper planning

38
Challenges
  • There are many obstacles to developing a cohesive
    community contingency plan
  • Lack of local governmental support/interest
  • Decreased funding and changing priorities
  • Corporate downsizing
  • Public and private re-engineering
  • Public / private culture differences
  • Little or no standardization
  • Technological changes (increased risk)
  • Outsourcing demands
  • A shrinking globe

39
Survival
  • The long-term survivability for an organization
    or the community it serves is dependant on being
    able to recover as quickly as possible with
    minimal disruption from service or business loss
    and the income that is generated from it.

40
Testing The Plan
Contingency Plan
  • Does it work?

41
Why Test ?
  • To determine the feasibility and compatibility of
    back-up facilities and procedures
  • Identify, update and enhance areas within the
    plan
  • Verify the accuracy and completeness of the plan
  • Identify weak areas and utilize in training for
    team members
  • Demonstrate an organizations or communitys
    ability to recover
  • Provide a mechanism for updating the plan and
    working with other community partners

42
Types Of Tests
  • Tests can be conducted in a variety of ways
  • Paper drill (using checklists)
  • Scheduled walk-through
  • Scheduled downtimes
  • Area specific plans (ie. Telecommunications, IM,
    etc)
  • Scenario based drills with live bodies

43
Develop Test Plan
  • Considerations to include are
  • Purpose of the test
  • Objectives
  • Type of test
  • Timing
  • Scheduling
  • Duration
  • Test participants (internal and/or external)
  • Assumptions
  • Constraints
  • Assignments
  • Test steps