Welcome to the Session on Financial Management and Procurement - PowerPoint PPT Presentation

1 / 44
About This Presentation
Title:

Welcome to the Session on Financial Management and Procurement

Description:

Title: Welcome to the Session on Financial Management and Procurement Author: Administrator Last modified by: br-fm Created Date: 12/14/2006 6:24:25 AM – PowerPoint PPT presentation

Number of Views:281
Avg rating:3.0/5.0
Slides: 45
Provided by: ssaNicInf
Category:

less

Transcript and Presenter's Notes

Title: Welcome to the Session on Financial Management and Procurement


1
Procurement Procedure in SSA
Technical Support Group, SSA
2
Main Considerations
PROCUREMENT
Accountability and Ethical Standards
Economy
Efficiency
Transparency
Fairness
3
Main Considerations of Proficient Procurement
  • Economy Give the purchaser best value for money.
  • Efficiency Best procurement is simple and swift,
    producing positive results without protracted
    delays.
  • Fairness Impartial, consistent, and therefore
    reliable.
  • Transparency Maintains rules and procedures that
    are accessible and unambiguous. It is not only
    fair, but should be seen to be fair.
  • (v) Accountability and Ethical Standards A key
    deterrent to collusion and corruption, and a key
    prerequisite for procurement credibility.

4
Why is Procurement Important?
  • In procurement terms inputs are generally grouped
    into three categories
  • (i) Civil Works School Infrastructure and
    facilities like New PS, UPS, Residential Schools,
    Hostel, ACR, HM Room, BRC/URC, CRC, Drinking
    water, Toilets, Girls Toilet, Ramps, Handrail,
    Electrification, Retro-fitting, Boundary wall/
    fencing, Major Repairs, etc.
  • (ii) Goods - Typically equipment, computers,
    furniture, textbooks, library books, uniforms,
    TLE, TLM, other materials, supplies, commodities,
    etc.
  • Services Hiring of services including
    academic, technical and resource support provided
    by institutions/organizations in all areas,
    research studies, third party quality evaluation
    of civil works, auditors etc.
  • The quality, timeliness, local appropriateness
    and affordability of those procured inputs can
    largely determine whether the public investments
    will succeed or fail.

5
Effective Procurement
Objectives
Timely Delivery as per schedule
Right Quality product
Lowest possible price
Meeting recognized standards
Reliable suppliers
Right quantities
6
PROCUREMENT IN SSA
  • Strictly follow procurement procedure prescribed
    in Chapter IX of the Manual on Financial
    Management and Procurement (FMP).
  • Mandatory to follow the Manual provisions for all
    procurements under SSA.
  • Follow States financial ceilings except when
    not prescribed by MHRD.
  • Strictly follow MHRDs financial ceilings
    prescribed for various method of procurement on
    17-09-2008 as extended on 2-7-2010 which shall
    prevail on States ceilings.
  • Convert the Ceilings in US to Indian Rupee by
    adopting RBIs buying rate of exchange prevailing
    on the date of issue of purchase order/work
    order.

7
MHRDs Financial ceilings per contract
(In US equivalent)
Category Open Tender Limited Tender Single Tender Community
Goods gt50,000 lt3000,000 lt 50,000 lt30,000
Works gt40,000 lt300,000 lt50,000 lt40,000 lt40,000
Text books Upto 1 million lt500.000
SIEMAT Upto 800,000
Information Technology equipment gt50,000 lt4 million lt50,000
Books, Teaching materials school facility improvement, hiring of vehicles of equipment lt30,000
Service Contract lt200,000 lt200,000 lt200,000 lt200,000
  • Any contract in excess of the maximum limit
    indicated above shall not be procured using SSA
    funds.

8
Points to be kept in view
  • Identification of Needs.
  • Ensure availability of specific budget provision.
  • Assessment of bulk requirement at the beginning
    of the financial year.
  • Computer, equipment, furniture, books etc in
    economic lots as per annual need.
  • Procure miscellaneous items of stores not covered
    by bulk requirement as per actual need.
  • Make all purchases to the best advantage after
    comparison of competitive prices.
  • Strictly follow the level of procurement
    prescribed in the Manual
  • Encourage decentralized procurement
  • Avoid centralized procurement of items
    prescribed at lower level

9
PROCUREMENT
  • Strictly follow the levels of procurement
    provided in Para 112 of the Manual on FMP

9
10
  • School/KGBV level
  • All civil works, except buildings for Residential
    Schools/Hostels and KGBV.
  • Furniture to Govt. UPS
  • Library Books for schools
  • Teaching Learning Material
  • School grant.
  • Maintenance grant.
  • Teaching Learning Equipment
  • REMS
  • Learning Enhancement Programme (LEP).
  • Items required for KGBV.
  • Uniform
  • Special Training related Items
  • TLM, Contingency etc.

11
CRC/BRC level
  • Furniture/ equipment/computer etc.
  • Office contingencies
  • Teaching Learning Material
  • Teacher Training
  • Community Training
  • Civil works for construction of BRC, augmentation
    of BRC and CRC
  • Maintenance of BRC and CRC
  • Printing work
  • REMS

12
District level
  • Office equipment for DPO
  • Office furniture for DPO
  • Textbooks/other books/supplementary materials
  • Computers and accessories
  • Aids and appliances for CWSN
  • Office contingencies
  • Hiring of vehicles
  • Maintenance of equipment and vehicles
  • District level training and workshops
  • Printing work
  • REMS
  • ECCE Kit
  • Educational Kits for girls
  • Learning Enhancement Programme (LEP)
  • Construction of Residential Schools/Hostel and
    KGBV

13
State level
  • Textbooks
  • Computers and its accessories
  • Office equipment for SPO
  • Office furniture for SPO
  • Equipment for distance education
  • Aids and appliances for CWSN
  • Office contingencies
  • Hiring of vehicles
  • Maintenance of equipment and vehicles
  • State level training and workshops
  • Printing work
  • Engagement of consultancy firms (service
    contract)
  • Engagement of Auditors for external and internal
    audit
  • Engagement of experts/resource persons
  • Engagement of NGOs
  • REMS
  • Learning Enhancement Programme (LEP).

14
PROCUREMENT
  • Prepare the Procurement Plan every year and
    upload on SSAs website as envisaged in Para 113
    of the Manual.
  • A Model Procurement Plan tentatively prepared at
    the National level is given separately.
  • Strictly follow financial ceiling prescribed for
    each method.
  • Urged the States on 16th June 2011 to prepare the
    annual procurement plan for 2011-12 and upload
    the same on the web site.
  • Information received from 9 States of Chandigarh,
    Haryana, HP, Madhya Pradesh, Maharashtra,
    Meghalaya, Rajasthan, Uttarakhand, West Bengal.
  • Information yet to receive from the remaining 26
    States.
  • Defaulting States to ensure preparation of
    procurement plan on priority.
  • Linkage of all procurements with plan will be
    looked in audits, post review and concurrent
    review.

15
Method of Procurement
Method of Procurement
Procurement through communities
Open Tender
Limited Tender
Single Tender
Procurement without tender / quotation
16
OPEN TENDER
  • Meaning
  • Competitive bidding procedure and is the most
    efficient and economic way of procuring goods or
    works.
  • Provides for adequate competition in order to
    ensure reasonable prices.
  • Ensures transparency and equal opportunity to
    all.
  • The methods used in the evaluation and the award
    of contracts are made known to all bidders.
  • Items covered
  • Civil works construction of BRC, Residential
    schools / Hostel, KGBV, SIEMAT and any other
    civil works specifically approved by Project
    Approval Board through contractors.
  • Goods

17
OPEN TENDER
  • Steps
  • Preparation of tender documents
  • Notification / Advertisement
  • Issue of tender documents
  • Pre-bid Conference
  • Submission of tender documents
  • Public opening of tender
  • Evaluation
  • Selection of lowest evaluated responsive bidder
    based on post qualification
  • Negotiation with L-1 (if necessary)
  • Contract award and
  • Contract performance

18
  • Tender documents
  • Should be user friendly, self contained,
    comprehensive, unambiguous and relevant to the
    objective of purchase.
  • Use Standard State Governments tender documents
    duly modified, if necessary, to cover the
    following sections
  • Section - I Invitation for Bids (IFB)
  • Section - II Instructions to Bidders (ITB)
  • Section - III General Conditions of Contract
  • Section - IV Special Conditions of Contract
  • Section - V Schedule of Requirements
  • Section - VI Technical Specifications
  • Section - VI-A Post Qualification Criteria
  • Section - VII Bid form and Price Schedule
  • Section - VIII Bid Security Form
  • Section - IX Contract Form

19
  • Section - X Performance Security Form
  • Section - XI Performance Statement
  • Section - XII Manufacturers Authorization Form
  • Section - XIII Form for Bank Guarantee for
    Advance Payment
  • Section - XIV Performa for Equipment and
    Quality Control employed by the Manufacturer
  • Important Clauses
  • Notification of Tender Notice
  • Sale of tender documents
  • Schedule of requirement
  • Bid Form
  • Bid Prices
  • Technical Specifications
  • Post-Qualification Criteria
  • Bid Validity Period

20
  • Earnest Money
  • Pre-bid Conference
  • Signing of Bids
  • Submission of bids
  • Opening of bids
  • Evaluation criteria
  • Negotiation with L1
  • Award of contract
  • Security deposit
  • Retention money
  • Signing of agreement/contract
  • Payment terms
  • Adjudicator
  • Force Majeure
  • Liquidated damages
  • Corrupt or Fraudulent Practices
  • General Conditions of Contract (GCC)
  • Special Conditions of Contract (SCC)

21
Procurement Steps
  • Repeat Orders
  • Quantity increase/decrease as per State procedure
  • Place order within one month from the date of
    last supply
  • Prices have since not reduced
  • Purchases not made on urgent basis
  • Right to Accept any Bid or Reject all Bids
  • The purchaser has the right to accept or reject
    any bid and to annul the bidding process and
    reject all bids at any time prior to award of
    contract.
  • Rejection of all bids
  • Lack of competition
  • Tenders not substantially responsive
  • Review the causes justifying the rejection
  • Obtain the approval of competent authority

22
Procurement Steps
  • Award of Contract
  • Award Criteria
  • Award the contract within the bid validity
    period.
  • Award the contract to the successful lowest
    evaluated responsive bidder
  • The selected bidder need not undertake work not
    specified in bidding documents or to modify his
    bid.
  • Single offers received
  • Consider if
  • publicity was adequate,
  • bid specifications / conditions were not
    restrictive or unclear and bid prices are
    considered reasonable.

23
LIMITED TENDER
  • Items covered
  • Goods including books, uniforms
  • Teaching learning materials,
  • School equipment,
  • Hiring of vehicles, and
  • Operation and maintenance of equipment
  • Invitation for quotations
  • Based on comparing price quotations obtained from
    several suppliers, usually at least 3 to ensure
    competitive prices.
  • Issue a letter to the supplier to furnish the
    quotations for the required goods/equipment.

24
LIMITED TENDER
  • Invitation for quotations
  • No need of publication of notification in the
    newspaper/website.
  • Issue the request letters to suppliers on the
    approved list.
  • The request letter should indicate description,
    specifications and quantity of the goods as well
    as desired delivery time and place.
  • Only one quotation by each supplier.
  • Bid Price
  • Quote for the full quantity as described in the
    invitation letter.
  • Corrections, if any, made by crossing out, dated
    initialing and re-writing.
  • Include all duties, taxes and other levies
    payable by the Vendor/Supplier in the total
    price.
  • The rates quoted by the Vendor/Supplier be fixed
    for the duration of the contract and not subject
    to adjustment on any account.
  • The prices are quoted in Indian Rupee.

24
25
LIMITED TENDER
  • Steps
  • Identifying items
  • Laying down specifications
  • Estimating total numbers and costs of items
  • Need not notify in newspaper/website
  • Identifying likely agencies borne on the approved
    list of contractors/ suppliers (minimum 3, 8-10
    for more competitive rates)
  • Obtaining approvals of competent authority
  • Issuing letters of invitation
  • Processing quotations received

25
26
  • Obtaining orders of competent authority for
    placing orders for supply
  • Issuing letters placing orders for supply and
    delivery period
  • Quoted price shall include all duties, taxes and
    other levies
  • Rates quoted be fixed and not subject to
    adjustment
  • Ensuring inspection
  • Ensuring timely supply and
  • Making payments after delivery in satisfactory
    condition.
  • The financial ceiling prescribed for limited
    tender shall be applicable for Rate contracts of
    DGS D and Rate contracts of State Governments.

27
SINGLE TENDER
  • Followed in the case of
  • Articles specifically certified as of propriety
    nature or
  • Manufactured by a particular firm
  • Goods including books
  • Teaching materials
  • School grant
  • Hiring of vehicles and
  • Operation and maintenance of equipment etc
  • Appropriate for
  • Extension of existing contracts
  • Standard equipment/spare parts for existing
    equipments from original supplier.
  • Items obtainable from one source
  • Early delivery
  • In exceptional cases such as natural disaster.

28
  • WITHOUT TENDER / QUOTATION
  • Procurement of goods or group of goods estimated
    to cost the equivalent of the ceiling of State
    Govt.
  • Issue suitable guidelines by the SIS
  • THROUGH COMMUNITIES
  • Construction of all civil works except, BRC,
    Hostel, KGBV and SIEMAT
  • BRC construction if the community is technically
    capable
  • Purchase of materials as per ISI certification,
    if available
  • SPD may provide simple procurement guidelines

29
  • Identify the committee locally operating in the
    area.
  • Keep the following points in view
  • Active involvement of community in planning and
    implementation
  • Who will procure the materials or goods used in
    works
  • Goods / works have to be executed as per approved
    plans and specifications
  • The name and designation of the Engineer for
    technical supervision and certification.

30
  • Suggested advance payments based on the
    certificate issued by the Supervising Engineer
  • Advance (mobilisation advance
  • upon start up of the work and
  • on reaching lintel level)
    75 of total cost
  • Plastering and completion of
  • work
    25 of total cost
  • School toilet and other repair works
  • Advance (mobilisation advance
  • upon start up of the work) cost 75
    of total
  • Plastering and completion
  • of work cost
    25 of total

31
Service Contract
Considerations
High Quality
Efficiency
Transparency
Economy
32
Service Contract
  • Selection process
  • Preparation of Terms of Reference
  • Preparation of Cost Estimate and Budget
  • Advertisement, seeking Expression of Interest
    (EOI)
  • short listing of consultants/firms based on EOI
  • Issue of Request for Proposal (RFP) to short
    listed Consultants/firms.
  • Receipt of RFP in two envelope system, technical
    and financial proposals separately.
  • Formation of Evaluation Committee
  • Evaluation of Technical proposal and assign
    individual mark by each member on the basis of
    responsiveness to the TOR
  • Open the Financial proposals of the qualifying
    Consultants publicly in the presence of the
    Consultants/representatives
  • Final discussions including negotiations
  • Award of contract

33
Service Contract
  • Terms of Reference (TOR)
  • Prepare a well-defined TOR specifying the
    services to be provided on the following lines
  • Background information
  • A precise statement of objectives
  • An outline of tasks to be carried out
  • A time schedule for completion of tasks
  • The support/inputs provided by the Client
  • Composition of Review Committee to monitor the
    services
  • List of key personnel whose CV and experience
    would be evaluated.

34
Service Contract
  • Preparation of Terms of Reference
  • Preparation of Cost Estimate and Budget
  • Advertisement, seeking Expression of Interest
    (EOI)
  • short listing of consultants/firms based on EOI
  • Issue of Request for Proposal (RFP) to short
    listed Consultants/firms.
  • Receipt of RFP in two envelope system, technical
    and financial proposals separately.
  • Formation of Evaluation Committee
  • Evaluation of Technical proposal and assign
    individual mark by each member on the basis of
    responsiveness to the TOR
  • Open the Financial proposals of the qualifying
    Consultants publicly in the presence of the
    Consultants/representatives
  • Final discussions including negotiations
  • Award of contract
  • Performance of contract

35
Service Contract
  • Cost Estimate and Budget
  • Based on the assessment of resources needed to
    carry out the assignment, staff time, logistical
    support and physical inputs.
  • Costs divided into two broad categories (a) fee
    or remuneration and (b) reimbursable.
  • Ensure that the requested services are within the
    current financial budget.
  • Advertising
  • Not necessary for short term consultancy
    services.
  • Advertisement seeking Expression of Interest for
    other services, is published in regional and
    national newspapers having wide circulation and
    uploaded in the web site of the Client.
  • Specify requisite qualifications, experience etc.
    in the notification.

36
Service Contract
  • Short list of Consultants
  • Short list the Expression of Interest received
    based on the relevant qualifications and
    experience specified in the notification.
  • Receipt of proposals
  • Issue letter of Invitations along with the TOR to
    the short listed consultants/firms.
  • Seek proposals from the short listed consultants
    / firms in two envelope system i.e, technical
    proposal in one envelope and financial proposal
    in another envelope.
  • Evaluation Committee
  • Constitute evaluation committees separately for
    technical and financial evaluation
  • This committee will evaluate the proposals
    received from the consultants / firms

37
Service Contract
  • Evaluation
  • Carried out in two stages, first the quality and
    then the cost
  • Until the technical evaluation is concluded the
    evaluators of technical proposals will not have
    access to the financial proposal
  • Evaluation of Technical Proposal
  • Carried out on the basis of the responsiveness to
    the TOR.
  • The technical evaluation committee will prepare
    an evaluation report on the technical aspects of
    the proposal.
  • The report shall substantiate the results of the
    evaluation and describe the relative strength and
    weaknesses of the proposals.
  • Individual marks will be assigned by each member
    and a consolidated mark sheet is prepared.
  • Minimum qualifying marks should be provided in
    the Letter of Invitation and those who are not
    obtaining this will be disqualified

38
Service Contract
  • Evaluation of Financial Proposal
  • On completion of technical evaluation, notify
    those consultants whose proposals did not meet
    the minimum qualifying marks that their financial
    proposals will be returned after completing the
    selection process.
  • Simultaneously notify the consultants who have
    secured the minimum qualifying marks and intimate
    the date and time set for opening the financial
    proposal.
  • Allow sufficient time for attending the opening
    of financial proposals
  • The financial committee shall open the financial
    proposal publically in the presence of
    representatives of the consultants / firms who
    choose to attend.
  • Read aloud the name of the consultant / firm, the
    quality scores and the proposed prices when the
    financial proposals are opened
  • Prepare the minutes of the public opening.

39
Service Contract
  • Final discussions (negotiations)
  • Held with the selected consultant /firm on the
    following issues
  • The selected consultant /firm shall not be
    allowed to substitute key staff unless both
    parties agree that undue delay in the selection
    process makes such substitution unavoidable or
    that such changes are critical to meet the
    objectives of the assignment.
  • Financial discussions shall include in addition
    to fee / remuneration, clarification of the
    consultants / firms tax liability and how this
    tax liability shall be reflected in the contract.
  • In case these discussions fail to result in an
    acceptable contract, terminate the process and
    invite the next ranked consultant / firm for
    discussion
  • After the process is successfully completed,
    promptly notify other consultants /firms on the
    short list that they were unsuccessful

40
Service Contract
  • Award of Contract
  • Award the contract to the selected consultant /
    firm
  • Use the prescribed contract agreement form for
    signing the contract
  • Indicate the fee/remuneration negotiated with the
    selected consultant/firm to be paid for the
    services in the contract agreement and also the
    terms of payment

41
Non-Government Organizations
  • Preparation of Terms of Reference
  • Publication of advertisement
  • Formation of Evaluation Committee
  • Short-listing of NGOs on the basis of
    specifications and scope of the work specified in
    the TOR.
  • Desk appraisal and if found suitable, field
    appraisal by the Evaluation Committee
  • Recommendation by the Evaluation Committee for
    the selection of NGOs to the Grant-in-Aid
    Committee.
  • Approval by Grant-in-Aid Committee based on the
    report of the Evaluation Committee on the desk
    and field appraisal.

42
  • Post Review
  • Government of India or the funding agencies shall
    undertake post review of the contracts awarded on
    procurement of goods, works and services on a
    random basis.
  • All procurement documents should be retained and
    made available to the review team.
  • Mis-procurement
  • Goods, works and services that have not been
    procured as per the Manual shall be treated as
    mis-procurement and SSA funds cannot be used for
    such procurement.

43
  • Complaint Handling Mechanism
  • Set up complaint handling mechanism at national
    as well as State level to deal with complaint
    received from contractors/suppliers.
  • Dealt with at a level higher than that of the
    level at which the procurement process is being
    undertaken
  • Undertake a thorough enquiry of the allegations
    made
  • If found correct, take appropriate remedial
    measures
  • Initiate disciplinary proceedings against the
    delinquent staff
  • Receipt of any illegal gratification by staff is
    considered as misconduct and result in
    disciplinary proceedings against such staff, in
    addition to imposing penalties under the law.

44