Title: TSF Upgrade


1
TSF Upgrade
  • Project Overview
  • Resources
  • Plans and Timetable
  • Hardware Tests Scott Kolya
  • VHDL Tests Marc Kelly

Bristol Manchester - RAL
Nicolo de Groot 11th April 2003 Final Design
Review
2
From To
3
History
  • September 2001 First proposal to PPRP. Based on
    daugthercards. Estimated costs 200k. Decision
    postponed.
  • December 2001 Approval for prototype funding
    (27k). Up to 60k for production.
  • 2002 Trigger Upgraded postponed by one year, use
    this to make a cheaper board, no daughtercards,
    only 5 FPGAs.
  • December 2002 New Proposal to PPRP

4
Funding
  • Full production costs, estimated at 75k are
    approved by the PPRP, after we have demonstrated
    a working prototype
  • An amount of 23k has been released to order
    components with a long lead time (FPGAs)

5
Current Status Prototype
  • 3 Chips, complete functionality needed for
    testing
  • Boundary Scan OK
  • Currently under test at SLAC (see Scotts and
    Marcs presentation)

6
UK Manpower
  • Physicists / Management
  • Roger Barlow, Manchester
  • Nicolo de Groot, RAL
  • Technical effort
  • Jamie Boyd, Postdoc, Bristol, 100
  • Dave Mercer, Engineer, Manchester, 50
  • Scott Kolya, Postdoc, Manchester, 50
  • Marc Kelly, Bristol, 100
  • These are time integrated averages.

7
Schedule
Item Target Date
Prototype completes electrical tests Complete
Prototype System function tests (UK) Jan Mar Apr 2003
Full firmware for Fast Control/DAQ/Op Control Complete
Full firmware for Input Formatter Complete
Full firmware for Engines Apr 2003
System Test (SLAC) Apr 1st Week May 2003
Parallel System Test at SLAC (with prototypes) June 2003
Final design complete June 2003
Full System Test at SLAC June 2003
Preseries tested at SLAC Early Sept 2003
Final delivery Oct 2003
8
Test Timetable
  • The schedule represents our most optimistic
    timetable. It is dictated by the need to have a
    full system test before the end of the run (July)
    using a pre-series. In order to be able to do so
    we will instrument 6 of our prototype boards for
    the system tests. The test schedule will
  • look like this
  • Last week April completion engine firmware,
    completion test VHDL
  • First week May system tests at SLAC
  • End of this week start assembly of 6 test
    boards 2 weeks
  • End of May boards to SLAC for full system test
  • June testing
  • This assumes the prototype boards will be usable
    for the full system test. (so far, so good)

9
Production Timetable
  • End June final design, start production
  • End August pre series ready
  • Early September test at SLAC
  • September production
  • October delivery
  • Currently beam back on September 5th. Can we
    speed things up ?

10
Summary
  • Complete redesign of TDF completed.
  • Prototype is there, testing.
  • Confident that we can deliver.
  • Some worries about the schedule.
  • Maybe on time but under budget