Title: Risk Management Program


1
Risk Management Program
2
Program 2 requirements
  • Initial startup
  • Normal operations
  • Temporary operations
  • Emergency shutdown and operations

1a
3
Program 2 requirements
  • Normal shutdown
  • Startup following
  • Normal or emergency shutdown
  • Major change that requires a hazard review

1b
4
Program 2 requirements
  • Consequences of deviations
  • Equipment inspections

1c
5
Program 3 requirements - steps
  • Initial startup
  • Normal operations
  • Temporary operations
  • Emergency shutdown

2a
6
Program 3 requirements - steps
  • Emergency operations
  • Normal shutdown
  • Startup following
  • Turnaround
  • Emergency shutdown

2b
7
Program 3 requirements
  • Operating limits
  • Consequences of deviation
  • Steps required to correct or avoid deviation

2c
8
Program 3 requirements- safety and health
considerations
  • Properties of chemicals used in the process
  • Hazards presented by chemicals used in the
    process

2d
9
Program 3 requirements- safety and health
considerations
  • Precautions to prevent exposure
  • Engineering controls
  • Administrative controls
  • PPE

2e
10
Program 3 requirements- safety and health
considerations
  • Control measures if exposure occurs
  • Quality control
  • Special or unique hazards

2f
11
Program 3 requirements - steps
  • Safety systems and their functions

2g