Title: Preparation for silicon sensor arrival


1
Preparation for silicon sensor arrival
  • sensor delivery schedule aggressive
  • expect 130 L2-L5 sensors each in July and August
  • sensor lot/batch will likely be in the order of
    50-70
  • from 9/2003 until 4/2004 270 L2-L5 sensors each
    month
  • first L0/L1 (110 pcs) sensors in October 2003
    (but effectively later)

Frank Lehner U Zurich
2
Silicon sensor arrival - preparation
  • We have a detailed QA plan with established
    procedures
  • All people involved in that business should check
    on http//www.physik.unizh.ch/lehnerf/dzero/qa/qa
    .html
  • QA document v4.0
  • definition of tests
  • general procedures for testing
  • Sensor QA part flow v2.0
  • detailed part flow for testing
  • timing estimates
  • Procedures for visual inspection v1.0
  • Guidelines for clean room and sensor SH v2.0

3
Sensor arrival - preparation
  • Key tests
  • initial registration into DB
  • checking paperwork from vendor
  • inserting vendor info into vendor information
    spreadsheet -gt perl script -gt database
  • visual inspection
  • follow visual inspection guidelines
  • use traveler form during inspection (form
    attached to visual inspection guide line)
  • insert visual inspection comments into key test
    spreadsheet
  • I-V and C-V
  • data go into key test spreadsheet
  • all L2-L5 sensor key tests at FNAL
  • Technician for DB and visuals Nina Ronzhina
  • Physicists for IV CV Md Mao/R.Lipton

4
Sensor arrival preparation
  • 10 L2-L5 full strip test (FST) at KSU (35) SB
    (65)
  • sensors selected for FST by RD and FL
  • FST information goes into full strip test
    spreadsheet -gt perl -gt database
  • 5 sensors are subject to long term bias test at
    FNAL (Md. Mao/R. Lipton)
  • selection based on visual inspection and I-V
    results from key tests
  • initially 10 sensors per batch will be
    mechanically measured on OGP at FNAL
  • agreement what to measure thickness, flatness,
    cut tolerances 2x (sides and ends)
  • sensors which show chips/cracks at edges have to
    be measured
  • not yet an agreement on data format

5
Sensor arrival preparation
  • irradiation test at KSU
  • 1.5 of the sensors (irradiation on baby
    detector)
  • two irradiation steps up to 2.5E13 10 MeV p/cm2
  • irradiate roughly half of the baby detectors
    which are at KSU anyway for FST tests
  • L0 L1 baby detectors have to be shipped from UR
    to KSU for irradiation (do we need a higher dose
    for them?)

6
Sensor QA plan
7
Sensor arrival preparation questions
  • Questions
  • Is Nina trained for visual inspection?
  • Is the visual inspection station in Lab A ready?
  • When do we have the vendor information and key
    test spreadsheet ready?
  • Do we have dry boxes for sensor storage at FNAL?
  • Are the programs for the mechanical measurements
    on the OGP written?
  • Is the output format defined?

8
L0/L1 PRR preparation
  • L0/L1 PRR will be on August 8th, 9 a.m. CT
  • documents infos posted on http//www.physik.uniz
    h.ch/lehnerf/dzero/prr/prr_l1.html
  • following documents are prepared or have to be
    prepared/finalized
  • Note on electrical characterization of L1 sensors
  • editor Marcel
  • status 1st version exists
  • plots and results are there, need only additional
    layout work
  • I will finalize it
  • Note on irradiation of L1 sensors
  • editor Frank
  • status 2nd version
  • plots and results are there
  • however results on strip capacitance are a very
    weak point, went up from 1.1 pF/cm to 1.5 pF/cm
  • no reults on coupling capacitor value after
    irradiation
  • no results on strip capacitance versus HV after
    irradiation

9
L0/L1 PRR preparation
  • Note on comparison of strip measurements between
    SB and KSU
  • editor Bob
  • status 2nd version exists (from July)
  • gives a very nice overview, shows the overall
    good agreement between KSU and SB on many
    measurements with some exceptions though
  • to be included in electrical sensor
    characterization note or separate note ??
  • Note on fluence determination and dosimetry
    checks at KSU irradiation facility
  • editor Tim
  • status 2nd version exists (from July)
  • contains leakage current vs. fluence plots which
    are also in the other note
  • foil activation double check between FNAL KSU
    within 20

10
L0/L1 PRR preparation
  • older note on L2 irradiation document for L2-L5
    PRR from March 6, 2003
  • editor Regina Tim
  • status unchanged
  • do we need an update of this at all?
  • other existing notes
  • quality assurance document v4.0
  • visual inspection guidelines v1.0
  • sensor SH document v2.0
  • generally in good shape

11
L0/L1 PRR preparation
  • all documents released to PRR by July 25 (i.e.
    two weeks in advance)
  • everybody, please read and send comments in to
    all notes by latest July 20
  • again, the notes are posted on
  • http//www.physik.unizh.ch/lehnerf/dzero/prr/prr_
    l1.html