Title: Waste water treatment through constructed wetlands
1Waste water treatment through constructed
wetlands
- Introduction
- How do constructed wetlands work?
- Construction and operation
- Pro - Contra
- Examples
2Lower AustriaAbwasserplan
- Concept for sustainable waste water treatment in
remote areas - Elaboration of the economically most feasible
variants (precondition for promotion of
investments)
- Application of constructed wetlands for waste
water treatment very popular
3How do constructed wetlands work?
4What are the components of constructed wetlands?
1. Pre-treatment 2. Intermittent loading 3.
Planted sand filter
Sizes 4 PE 500 PE (5.000 PE?)
5Errection of Constructed wetlands
1
- Installation of the pre-treatment facilities
- Installation of the intermittent loading facility
6Errection of Constructed wetlands
2
Excavation and leveling of the terrain for the
planted sand filter
7Errection of Constructed wetlands
3
- Sealing of the basins with layers
- Integration of the filter-materials (sand,
gravel)
8Errection of Constructed wetlands
4
Installation of distribution systems for plane
and uniform water loading
9Errection of Constructed wetlands
5
Planting with reed/cuttle.
10Errection of Constructed wetlands
6
After one year full coverage and maximum
cleaning capacity of the constructed wetland
11Operation is relatively simple(depending on the
size of the plant)
monthly control of the facilities Ammonium
monitoring yearly Reed/cuttle cutting
(spring) Cleaning of pre-treatment Effort
appr. 1 3 h/PE,year
12Examples in Lower Austria
13WWTPWEB AG / Pfaffenschlag, Low. Austria
Errection 2000
Size 15 PE
Effluent rates (mg/l) NH4/N 0,01 (5) CSB
25 (60) BSB5 4 (10)
14WWTPNeuwald / Großgerungs, Low. Austria
Errection 2004
Size 20 PE
Effluent rates (mg/l) NH4/N 0,15 (5) CSB
23 (60) BSB5 2 (10)
15WWTPIgelschwang / Wallsee-Sindelburg, LA
Errection 2005
Size 100 PE
Errection costs appr. 60.000 EUR (net) Filter
area 600 m² Altitude 350 m
16WWTP St. WolfgangStadtgemeinde Weitra , Low.
Austria
Errection 2006
Size 150 PE
Errection costs appr. 130.000 EUR (net) Filter
area 625 m² Altitude 550 m