Title: Sample Site Plans


1
Sample Site Plans
2
Site Sampling Plans
  • Requirement of Total Coliform Rule
  • Effective September 1, 1992
  • Plan identifies representative sites in the
    distribution system for sampling
  • Subject to DHS/LPA review, revision and approval

3
Site Sampling Plans
  • Plan shall be in the form of a distribution
    system map, street map, and or system schematic

4
Site Sampling Plans Map
  • Map must cover the entire water system and
    include
  • Water sources and types (well, spring, intake
  • Treatment facilities filters, chlorination,
    etc.
  • Storage tanks/reservoirs
  • Pressure reducing stations
  • Booster Stations
  • Routine and repeat sampling sites
  • of samples required to be collected
  • Total population served
  • Procedures for handling notification

5
Did you Forget?
  • Number of routine samples required each month is
    based upon population or service connections
  • Population Service Number
  • Served Connections Samples
  • 25 to 1,000 15 to 400 1
  • 1,001 to 2,500 401 to 890 2
  • 2,501 to 3,300 891 to 1180 3
  • 3,301 to 4,100 1181 to 1460 4
  • 4,101 to 4,900 1461 to 1750 5
  • gt 4,901 See CCR Title 22 Table 64423-A

6
Site Sampling Plans Routine Sampling Sites
  • Identify representative sites throughout the
    distribution system
  • Include locations along dead ends
  • Do not use the last connection
  • Do not use the source(s)
  • Consider repeat sampling locations upstream
    downstream locations

7
Site Sampling Plans Routine Sampling Sites
  • Number of representative sites may be greater
    than the required number of monthly samples
  • Rotate sampling sites by identifying different
    locations every month
  • Provide description of sample site rotation

8
Site Sampling Plans Routine Sampling Sites
  • List all routine and repeat sampling sites
  • List the monthly rotation of sites
  • Rotation scheme should cover a 12-month calendar
    year
  • Assumed to be repeated each year thereafter

9
Palo Verde CWD PWS CA 1300616 Population
400 Service Connections 127 Water source 2
Groundwater wells Treatment Chlorination (gas)
Iron Removal (sand pressure filter) Distribution
Storage Hydropneumatic tank (2000 gal)
  • Positive Coliform Response Procedure
  • On notice from the lab of a positive routine
    sample the duty operator will
  • Check system for possible source of
    contamination, correct problems as necessary
  • Take repeat samples at Routine location, Repeat
    1, Repeat 2 and Repeat 3 locations within 24
    hours.
  • Notify President of CWD 555-1111 and LPA 555-2222
    when repeats were taken

8 ACP
6 ACP
Repeat 1 117 Sunset Way
Routine Sample123 Sunset Way
PVCWD Monitoring Plan Samples Required per month
1 Routine Sample Location123 Sunset Way
Repeat Sample 1 117 Sunset Way Repeat Sample
2 127 Sunset Way Repeat Sample 3 Treatment
plant effluent tap
Repeat 2 127 Sunset Way
Repeat Sample 3 Treatment plant effluent tap
Wells and Treatment plant
10
Site Sampling Plans Revisions
  • Sample siting plans may be changed
  • Due changes in system
  • Due to growth
  • At least once every 10 years submit modified plan
    to DHS/LPA for review and approval