Title: Sample Site Plans
1Sample Site Plans
2Site Sampling Plans
- Requirement of Total Coliform Rule
- Effective September 1, 1992
- Plan identifies representative sites in the
distribution system for sampling - Subject to DHS/LPA review, revision and approval
3Site Sampling Plans
- Plan shall be in the form of a distribution
system map, street map, and or system schematic
4Site Sampling Plans Map
- Map must cover the entire water system and
include - Water sources and types (well, spring, intake
- Treatment facilities filters, chlorination,
etc. - Storage tanks/reservoirs
- Pressure reducing stations
- Booster Stations
- Routine and repeat sampling sites
- of samples required to be collected
- Total population served
- Procedures for handling notification
5Did you Forget?
- Number of routine samples required each month is
based upon population or service connections - Population Service Number
- Served Connections Samples
- 25 to 1,000 15 to 400 1
- 1,001 to 2,500 401 to 890 2
- 2,501 to 3,300 891 to 1180 3
- 3,301 to 4,100 1181 to 1460 4
- 4,101 to 4,900 1461 to 1750 5
- gt 4,901 See CCR Title 22 Table 64423-A
6Site Sampling Plans Routine Sampling Sites
- Identify representative sites throughout the
distribution system - Include locations along dead ends
- Do not use the last connection
- Do not use the source(s)
- Consider repeat sampling locations upstream
downstream locations
7Site Sampling Plans Routine Sampling Sites
- Number of representative sites may be greater
than the required number of monthly samples - Rotate sampling sites by identifying different
locations every month - Provide description of sample site rotation
8Site Sampling Plans Routine Sampling Sites
- List all routine and repeat sampling sites
- List the monthly rotation of sites
- Rotation scheme should cover a 12-month calendar
year - Assumed to be repeated each year thereafter
9Palo Verde CWD PWS CA 1300616 Population
400 Service Connections 127 Water source 2
Groundwater wells Treatment Chlorination (gas)
Iron Removal (sand pressure filter) Distribution
Storage Hydropneumatic tank (2000 gal)
- Positive Coliform Response Procedure
- On notice from the lab of a positive routine
sample the duty operator will - Check system for possible source of
contamination, correct problems as necessary - Take repeat samples at Routine location, Repeat
1, Repeat 2 and Repeat 3 locations within 24
hours. - Notify President of CWD 555-1111 and LPA 555-2222
when repeats were taken
8 ACP
6 ACP
Repeat 1 117 Sunset Way
Routine Sample123 Sunset Way
PVCWD Monitoring Plan Samples Required per month
1 Routine Sample Location123 Sunset Way
Repeat Sample 1 117 Sunset Way Repeat Sample
2 127 Sunset Way Repeat Sample 3 Treatment
plant effluent tap
Repeat 2 127 Sunset Way
Repeat Sample 3 Treatment plant effluent tap
Wells and Treatment plant
10Site Sampling Plans Revisions
- Sample siting plans may be changed
- Due changes in system
- Due to growth
- At least once every 10 years submit modified plan
to DHS/LPA for review and approval