Integrated Corridor Management Pioneer Sites - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

Integrated Corridor Management Pioneer Sites

Description:

Purpose: select up to eight (8) Sites for assessment of ... Alameda County Congestion Management Agency. Alameda County Transit. Highlights of the Corridor ... – PowerPoint PPT presentation

Number of Views:28
Avg rating:3.0/5.0
Slides: 16
Provided by: pauljgo
Category:

less

Transcript and Presenter's Notes

Title: Integrated Corridor Management Pioneer Sites


1
Integrated Corridor ManagementPioneer Sites
2
Outline
  • ICM Pioneer Site RFA
  • Proposal Evaluation Areas
  • Pioneer Sites
  • Summary of Pioneer Sites

3
ICM Pioneer Site Request for Applications
  • Summary
  • Purpose select up to eight (8) Sites for
    assessment of their capability to implement
    integrated corridor management
  • Result award up to eight (8) cooperative
    agreements for participation in the ICM
    initiative
  • Applications received on May 15th, 2006

4
Proposal Evaluation Areas
  • Minimum Criteria
  • Lead Agency must be a public sector agency and
    share at least 30 of the Stage One cost
  • Must include freeway, arterial, and transit
    networks in an urban area and systems to support
  • Real-time or near real-time data collection on
    all network types
  • Part I Qualifications of the Pioneer Site
    Corridor (65)
  • Description of the Applicant Corridor (10)
  • Institutional Capabilities within the Applicant
    Corridor (10)
  • Technical Capabilities within the Applicant
    Corridor (20)
  • Operational Capabilities within the Applicant
    Corridor (15)
  • Agency Staff Capabilities within the Applicant
    Corridor (10)
  • Part II Technical Approach (35)
  • Applicants Project Management Approach (10)
  • Applicants Systems Engineering Approach (10)
  • Quality of the Applicants Pioneer Site Team
    Staff (15)
  • Part III Cost
  • Part IV Geographic Diversity

5
Pioneer Sites
6
Dallas US 75
  • Lead and other Agencies
  • Dallas Area Rapid Transit Authority
  • Cities of Dallas, Richardson, Plano, and
    University Park
  • Town of Highland Park
  • North Central Texas Council of Governments
  • North Texas Tollway Authority
  • TxDOT Dallas District
  • Highlights of the Corridor
  • Good real-time data availability
  • Available transit capacity
  • Includes HOV, Tolling, Express Bus, Light Rail

7
Houston I-10 US 290
  • Lead and other Agencies
  • Texas Dept. of Transportation
  • Houston Metropolitan Transit Authority of Harris
    County
  • Harris County
  • City of Houston
  • Houston-Galveston Area Council
  • Highlights of the Corridor
  • Good mix of networks
  • Existing partnerships and agencies in the same
    facility
  • Includes HOV, Tolling, Pricing, Express Bus, BRT

8
Minneapolis I-394
  • Lead and other Agencies
  • Minnesota DOT
  • Hennepin County
  • City of Minneapolis
  • Metro Transit
  • Highlights of the Corridor
  • Well-defined networks, travel patterns, and
    performance measures
  • Good network transfer capability
  • Good traveler information, especially freeway and
    transit
  • Includes HOV, Tolling, Pricing, Express Bus, BRT

9
Montgomery County I-270
  • Lead and other Agencies
  • MD Dept. of Transportation
  • Montgomery County
  • WMATA
  • Highlights of the Corridor
  • Good congestion information including daily
    traffic, transit performance and ridership
  • Long-standing cooperative agreements
  • Includes HOV, Commuter Rail, Heavy Rail

10
Oakland I-880
  • Lead and other Agencies
  • Metropolitan Transportation Commission
  • Caltrans District 4
  • Alameda County Congestion Management Agency
  • Alameda County Transit
  • Highlights of the Corridor
  • Performance monitoring and corridor modeling
    capabilities
  • Existing ICM strategies
  • Includes HOV, Tolling, Express Bus, BRT,
    Commuter Rail, Heavy Rail

11
San Antonio I-10
  • Lead and other Agencies
  • TxDOT - San Antonio District
  • City of San Antonio
  • VIA Metro. Transit Agency
  • Southwest Research Institute
  • Texas Transportation Institute
  • Highlights of the Corridor
  • Good corridor with frequent transit service
  • Potential to demonstrate ICM capabilities during
    construction
  • Well-established real-time data collection
  • Includes Express Bus

12
San Diego I-15
  • Lead and other Agencies
  • SANDAG
  • Caltrans
  • San Diego/Escondido/Poway
  • Metropolitan Transit System
  • North County Transit District
  • Highlights of the Corridor
  • Well-defined corridor
  • Long history of interagency cooperation and
    agreements
  • Some level integrated corridor management already
    exists
  • Includes HOV, Tolling, Pricing, Express Bus, BRT

13
Seattle I-5
  • Lead and other Agencies
  • Washington State DOT
  • City of Seattle
  • King County Metro Transit
  • Highlights of the Corridor
  • Transit focus with high ridership (65 commuters
    use transit)
  • Good cooperation between transit and arterial
    agencies
  • Compatibility between two traffic signal systems
  • Good vision of ICM goals
  • Includes HOV, Express Bus, Commuter Rail, Light
    Rail

14
Summary of Pioneer Sites
15
Next Steps
  • Kickoff meeting in late October 2006
  • 8 Draft Concept of Operations in March 2007
  • 8 Draft Requirements Documents in September 2007
  • Select sites to model in December 2007
  • Select sites to conduct demonstrations in Fall
    2008
Write a Comment
User Comments (0)
About PowerShow.com