FCS ACQUISITION - PowerPoint PPT Presentation

1 / 29
About This Presentation
Title:

FCS ACQUISITION

Description:

New Fielded Unit. Effective Suitable Survivable, KPP's COIC's, ORD Requirements. Capabilities ... at User Intent And How FCS Enabled Unit Of Action Will Fight ... – PowerPoint PPT presentation

Number of Views:39
Avg rating:3.0/5.0
Slides: 30
Provided by: scott83
Category:
Tags: acquisition | fcs | unit

less

Transcript and Presenter's Notes

Title: FCS ACQUISITION


1
FCS ACQUISITION EVALUATION TEAMING
Army Test and Evaluation Command
2
Evaluation Strategy
Elements (Platforms, Networks, )
FCS
MISSION
MOPs/MOEs FoS/SoS Level (ORD, Spec, KPP, COIC)
MOPs/MOEs Element Level (ORD, Spec)
Mission Threads (OO)
Decomposition
Red
Blue
Capabilities Limitations By Mission Unks
3
Traditional Acquisition Program
Mission
Mission Capability Exists
Fielded Unit
PROXY Issues
Effective Suitable Survivable, KPPs COICs, ORD
Requirements
New Equipment
4
FCS Acquisition Program
Mission
Relates To Warfighter Needs
Relates To Identified Criteria
Capabilities
Effective Suitable Survivable, KPPs COICs, ORD
Requirements
New Fielded Unit
5
ATECs Role
  • Independent Evaluator For FCS
  • Develop MOEs And MOPs To Support Platform And
    FoS/SoS Assessment Of
  • Specs
  • ORD Requirements
  • KPPs
  • COICs
  • Address The Capabilities Limitations Of The FCS
    Enabled UA Mission Accomplishment
  • Produce An Evaluation Of Whether The FCS FOS, In
    The Context Of The UA, Is Effective, Suitable,
    And Survivable
  • Work In A Collaborative Environment To Maximize
    Commonality Of Resources Ensure The Success Of
    FCS

6
CTO Organization
Primary Functional Management Location
Director ATEC Deputy Director
LSI Deputy Director PMO Deputy Director
Analysis Support
Evaluation Liaison Cell
St. Louis Office
System of System Level
Test Planning, Integration, Execution
Product Assurance Verification
Test Resources
MS/TE Integration
Test Assessment Reporting
Test Support Facilities
System Level
C4ISR
Manned Combat Systems
Unmanned Ground Systems
Unmanned Aerial Systems
Complementary Systems Test Integration
Lethality/ Munitions
Field Offices
Ft. Huachuca
Ft. Hood
WSMR
UAMBL
YPG
7
COLLABORATION PROCESS
OO, ORD
Combat Developer Defines Scenarios And Vignettes
FCS That Meets Users Needs Within A Shortened
Acquisition Cycle
Mission Decomposition Detailed Look at User
Intent And How FCS Enabled Unit Of Action Will
Fight
PM/LSI SoS Spec, FCS Design
OO, ORD, Spec, Mission Decomp
OO, ORD, Spec, Mission Decomp, TE Plans
ATEC Evaluation Plan to Assess Capabilities
Limitations
Plan Together, Test Once, Share the Data
8
Evaluation Strategy
Elements (Platforms, Networks, )
FCS
MISSION
MOPs/MOEs FoS/SoS Level (ORD, Spec, KPP, COIC)
MOPs/MOEs Element Level (ORD, Spec)
Mission Threads (OO)
Decomposition
Red
Blue
Capabilities Limitations By Mission Unks
9
Platform/FoS/SoS Capabilities/Limitations
  • MOEs, MOPs Based On COIs, ORD, KPP, AIs
  • Platform Level
  • Based On Unique Platform Requirements
  • FoS/SoS Level
  • Based On Synergistic Effects Of Multiple
    Platforms
  • Focused On FCS Contributions To Capabilities
  • Requires Complimentary Systems To Execute FCS
    Test
  • Basis To Determine Capabilities And Limitations
    At All Levels

10
Evaluation Strategy
Elements (Platforms, Networks, )
FCS
MISSION
MOPs/MOEs FoS/SoS Level (ORD, Spec, KPP, COIC)
MOPs/MOEs Element Level (ORD, Spec)
Mission Threads (OO)
Decomposition
Red
Blue
Capabilities Limitations By Mission Unks
11
Mission Capabilities Limitations
  • MOEs, MOPs Based on OO, ORD,
  • Based On Live, Virtual Constructive Events
  • Utilize Mission Decomposition Process To
  • Assist In OT Planning
  • Correlate Capabilities And Limitations At
    Platform, FoS SoS To Required Tasks
  • Determine Requirements For Force Effectiveness
    MS
  • Focused On FCS Contributions To Mission
  • Sensitivity Analyses Conducted To
  • Determine If Other FCS Or Complimentary Systems
    May Alleviate Shortfalls In Capabilities Caused
    By
  • Technical Limitations
  • Environmental Influences (Including Threat
    Effects)
  • Enable Army Examination Of Alternate Scenarios/
    Red Responses

12
Mission Decomposition
  • Achieve air superiority
  • Destroy WMD capability
  • Facilitate control of energy centers
  • Destroy resisting Rebel forces

JTF
TASKS
  • Destroy WMD
  • Seize oil and gas pipelines and prod facilities
  • Seize the RHC fac of the IFP mil forces
  • Seize vital infrastructure with min coll damage
  • Facilitate the transition of power
  • Destroy Rebel forces in zone

JFLCC
TASKS
  • Seize RHC fac with min coll damage
  • Defeat Rebel forces WS/W of Baku
  • Conduct vertical maneuver to Baku

UE1
TASKS
  • Establish multiple FOBs, on order conduct
  • handover FOB security to 3d BN 504 PIR
  • Defeat rebel forces W/SW of Baku
  • Secure OBJ CAMEL

UA1
UA1
TASKS
  • Defeat enemy forces withdrawing to Baku
  • Seize bridge vic OBJ BISHOP
  • Conduct air assault with 1 dismounted INF CO

CAB2
TASKS
13
Task Decomposition
  • Defeat enemy forces withdrawing to Baku
  • Seize bridge vic OBJ BISHOP
  • Conduct air assault with 1 dismounted INF CO

CAB2 Tasks
TASKS
AUTL Task
ART 8.1.2 Conduct an Attack
TASKS
  • TA 1 Deploy Conduct Maneuver
  • TA 2 Develop Intel
  • TA 3 Employ Firepower
  • TA 5 Exercise C2

AUTL Sub-tasks
TASKS
ART 7.2.1 Collect Relevant Information ART 7.2.3
Display COP Tailored to User Needs ART 7.2.5
Disseminate a COP Execution Info ART 7.2.2
Process Relevant Information to Create a COP
Lower AUTLTasks
TASKS
  • Conduct UAV Flight Operations
  • Conduct GCS (C2V) mission activities
  • Conduct Autonomous Surveillance

MTP Tasks
TASKS
14
FCS Task to Functional Capability Mapping
Tasks
Capabilities
15
FCS Functional Capability to ORD Requirements
Tasks
Capabilities
16
FCS ORD Requirements to Materiel
Capabilities
Materiel
17
Capabilities/Limitations Assessed At All Levels
  • JTF Mission
  • JFLCC Task
  • UE Task
  • UA Task
  • FCS Task
  • Platform Task
  • Subsystem Task

As defined in OO
Decomposition
As defined in COIC, KPP, ORD
As defined in ORD, Spec

18
  • Example Feedback to Be Provided to TRADOC and LSI
    Systems Engineering as a Result of this Endeavor
    thus far
  • ORD 1215 -  FCS FoS systems must be capable of
    automated precision engagements with automated
    fire control, distribution and clearance
    procedures with a manual back-up. (Threshold).
    Rational paragraph indicates requirement enables
    rapid selection of high payoff and most
    dangerous targets while static or moving.
  • SOS Spec - no capability at SOS level in spec for
    rapid selection of high payoff and most
    dangerous targets while static or moving only
    addresses rapid selection of high payoff and
    most dangerous targets in paragraph
    3.7.4.2.1.4.1 and 3.7.4.2.1.4.1 for threshold and
    objective requirements for MCS (ORD 3407) MCS.
    SOS Spec does not include ORD 3825 which
    indicates selection of high payoff targets
    requirement for ICV.
  • ORD 1159 FCS systems must accomplish
    position/navigation (horizontal and vertical) to
    a one meter Spherical Error Probable (SEP) with a
    Low Probability of Detection (LPD)/ Interception
    (LPI) and in the presence of electronic jamming.
    (Objective)
  • SOS Spec - (3.2.1.3.2) identifies requirement as
    Objective. Only other references to navigation
    are 3.2.1.8.15.3.1- kit to enable legacy systems
    to be interoperable 3.7.18.1- auto navigation
    for UAS CL I 3.7.23.2.1.2.24 UGS position
    themselves directly enables 18 tasks from 3
    missions, indirectly enables 37 tasks from 3
    missions
  • OO (SORC) Required Capability - Terrain
    Analysis. ORD addresses in 5.9.2 no ORD
    Reference number addresses in Appendix H,
    2.5.1.3.1.1.6 Appendix F, Table 302 Appendix J
    IERs.
  • SOS Spec could not find any reference to
    requirement for terrain analysis directly
    enables 21 tasks from 3 missions, indirectly
    enables 35 tasks from 3 missions

19
Applying Mission Decomposition Capability
Mapping to Construct Operational Test Events
Sample Application
20
UA Missions in OT
System
Task 1
Task 2
Task 3
Unit Mission Lane
Task 1
Task 2
Task 3
Task 1
Task 2
Task 3
SoSIL
Unit Mission Lane
Larger Unit Mission Lane
Task 1
Task 2
Task 3
Task 1
Task 2
Task 3
CL III UAS
Task 1
Task 2
Task 3
Unit Mission Lane
Task 1
Task 2
Task 3
Virtual Loop
Live Loop
21
Sample Task Set Applied OT Model
System
Task 1
Task 2
Task 3
Unit Mission Lane
Task 1
Task 2
Task 3
Task 1
Task 2
Task 3
SoSIL
Unit Mission Lane
Larger Unit Mission Lane
Task 1
Task 2
Task 3
Task 1
Task 2
Task 3
CL III UAS
Task 1
Task 2
Task 3
Unit Mission Lane
Task 1
Task 2
Task 3
Virtual Loop
Live Loop
22
Evaluation Strategy Example
FCS
Platforms
MISSION
MOPs/MOEs FoS/SoS Level (ORD, Spec, KPP, COIC)
MOPs/MOEs Platform Level (ORD, Spec)
Mission Threads (OO)
Decomposition
Red
Blue
Mission Delayed Awaiting Ground Sensor for NLOS
Capabilities Limitations By Mission Unks
UAV Cannot Be used as Sensor for NLOS in the
precision mode
UAV TLE 120M NLOS 25M CEP
Comanche Provide Location Accuracy for NLOS
23
Evaluation Strategy Example
FCS
Platforms
MISSION
MOPs/MOEs FoS/SoS Level (ORD, Spec, KPP, COIC)
MOPs/MOEs Platform Level (ORD, Spec)
Mission Threads (OO)
Decomposition
Red
Blue
Manned Grnd Vehicle Protection Limited to 14.5mm
Capabilities Limitations By Mission Unks
Network Provides Enemy Location to Commander
Prior to Engagement
Enemy Destroyed Out of Contact
WIN-T/JTRS Provides Connectivity
UAV Provides Enemy Location
24
The Road Ahead
  • TRADOC Complete Decomposition of 1st Mission
  • TRADOC, ATEC, PM/LSI Identify MS Requirements
  • Develop Common Database For All Stakeholders
  • Identify All TE Events
  • Include All Measures For Evaluation
  • Capabilities and Limitations Based
  • Evaluation of Data and Confidence Levels
    Continuously Updated

25
Backup
26
FCS Test Program Schedule
27
ORD - KPP Mapping
28
MS In Support of Evaluation
Elements (Platforms, Networks, . . . )
FCS
MISSION
MOPs/MOEs Element Level (ORD, Spec)
MOPs/MOEs FoS/SoS Level (ORD, Spec, KPP, COIC)
Mission Threads (OO)
Decomposition
Red
Blue
Capabilities Limitations By Mission Unks
Updated as Systems Mature
29
Instrumentation Facilities In Support of
Evaluation
Elements (Platforms, Networks, etc.)
FCS
MISSION
MOPs/MOEs FoS/SoS Level (ORD, Spec, KPP, COIC)
MOPs/MOEs Element Level (ORD, Spec)
Mission Threads (OO)
Decomposition
Red
Blue
Capabilities Limitations By Mission Unks
Write a Comment
User Comments (0)
About PowerShow.com