Description:

Stray currents in sensitive circuits. Thermocouple amplifiers ... Currently a batch of 10 in progress. Electronic units. Neoprene. Complete refit ... – PowerPoint PPT presentation

Number of Views:55
Avg rating:3.0/5.0
Slides: 24
Provided by: entra
Category:
Tags: npp | current | status

less

Transcript and Presenter's Notes

Title: Current status of NPP C


1
Current status of NPP CI in the United Kingdom
21st Meeting of the Technical Working Group on
Nuclear Power Plant Control and Instrumentation,
23-25 May 2007, Vienna
  • T P Smyth
  • AMEC NNC, Knutsford, Cheshire, UK

2
Current status of NPP CI in the United Kingdom
  • Nuclear Power Plants in the UK
  • Status of CI at AGR nuclear plants
  • Reactor Protection Systems
  • Data Processing Systems
  • Refuelling machines
  • Status of CI at PWR plant
  • Simulators
  • Status of regulatory environment affecting CI
  • Recommendations

3
Nuclear Power Plants in the UK (1)
4
Nuclear Power Plants in the UK (2)?
  • Electricity sources
  • 20 nuclear
  • 37 gas
  • 34 coal
  • Need to plan for energy replacement
  • 7 plants will close in next 11 years
  • 14 reactors
  • 7294 MWe
  • 13 of electricity sources
  • North Sea oil and gas will be limited in future
  • 23 May 2007
  • Government announces 20 week consultation process
  • Government wants to take decision this year
  • No public money

5
AGR Reactor Protection Systems (1)?
6
AGR Reactor Protection Systems (2)?
  • Obsolescence of equipment
  • Difficulty in obtaining spares
  • Repairs
  • Replacement
  • Analogue trip units
  • Neoprene degradation
  • New equipment
  • Majority of protection parameters have been
    addressed

7
AGR Reactor Protection Systems (3)?
  • Neoprene insulation degradation
  • Magnox Oldbury power station
  • Degradation with age
  • Perishing
  • Sweating
  • Hygroscopic
  • Becomes conductive - resistance lt 1 M?
  • Stray currents in sensitive circuits
  • Thermocouple amplifiers

8
AGR Reactor Protection Systems (4)?
  • Neoprene insulation degradation?

9
AGR Reactor Protection Systems (5)?
  • Neoprene insulation degradation

10
AGR Reactor Protection Systems (6)?
  • Neoprene insulation degradation
  • Survey of all safety equipment
  • Presence of neoprene
  • State of neoprene
  • Circuit function
  • Replacement equipment at older stations
  • Obsolescent anyway
  • Repairs at newer stations
  • Heysham 2 / Torness
  • 4 years work, 2 more years to finalise all
    equipment

11
AGR Reactor Protection Systems (7)?
  • Neutron Flux measurement systems
  • AGR detectors located in core at 8 locations
  • High temperatures
  • Detector spares
  • Wide range detector integral cable
  • Manufacturing spares re-establishing production
    processes
  • Currently a batch of 10 in progress
  • Electronic units
  • Neoprene
  • Complete refit
  • Repairs at Heysham 2 / Torness

12
AGR Reactor Protection Systems (8)?
  • Diverse Guardline upgrade
  • Hinkley B / Hunterston B / Dungeness
  • Driven by licensing basis for nuclear power
    plants
  • Large subset of Main Guardline parameters
    duplicated
  • From 1995 to 2000
  • Heysham 2 / Torness had diverse guardlines from
    the outset.
  • Hartlepool / Heysham 1 were judged to have
    adequate diversity in protection systems

13
AGR Data Processing Systems
  • Safety claims on equipment
  • Some reactor control functions
  • Some alarms
  • Hinkley Point B
  • New DPS installed (1999)?
  • Dungeness B
  • New DPS being installed
  • Control / equipment protection functions
    segregated
  • Other AGR's
  • Stabilization of equipment
  • Adequate spares provision / hardware support.
  • Improved air conditioning
  • Limited re-manufacturing (optical transceiver
    boards)?

14
AGR Refuelling Machines (1)?
15
AGR Refuelling Machines (2)?
16
AGR Refuelling Machines (3)?
  • Online refuelling
  • Stringent safety requirements
  • Equipment obsolescence
  • Key focus at present
  • Heysham 2 / Torness
  • Replacement of Reypac controllers with Siemens S7
  • I/O replaced, emulates original equipment
  • Reypac controller replacement in progress
  • Software reverse engineered and ported
  • Safety functions partitioned
  • Safety standards
  • Modern standards considered when replacing
    equipment

17
PWR Principal CI Systems (1)?

18
PWR Principal CI Systems (2)?
  • Equipment Life cycle management
  • Review of equipment status
  • Review of spares holdings
  • Participation of OEM (Westinghouse)?
  • HICS
  • Optical transceiver units obsolete
  • New units re-engineered by Westinghouse
  • Adequate spares manufactured

19
Simulators
  • Sizewell B
  • On site
  • Replaced in 2003
  • Duplicate DPS
  • Can be modified at the same time as the main DPS
  • WANO recommendation
  • AGR's
  • Goal was to establish a simulator at each site
  • Hartlepool - new simulator
  • Heysham 2 / Torness
  • Upgraded to increase fidelity
  • WANO recommendation

20
Regulatory Environment (1)?
  • Standards hierarchy
  • NII SAPS
  • IAEA standards
  • IEC standards
  • IEC 61226
  • PSA based assessment
  • Target 10-7 / year
  • Limit of reliability claims for software based
    systems
  • Assume 1 demand / year
  • 10-4/demand
  • Require diverse protection to make up 10-3/demand

21
Regulatory Environment (2)?
  • Application to Sizewell B
  • Primary Protection System
  • Four channels, 2 out of 4 tripping
  • Software based
  • Production excellence
  • IEC 61880
  • Independent confidence building
  • Extensive testing
  • Independent code safety assessment
  • Secondary Protection System
  • Four channels, 2 out of 4 tripping
  • Protection for frequent faults
  • Laddic magnetic amplifiers
  • Diverse technology

22
Regulatory Environment (3)?
  • New build
  • In general, same regulatory requirements as
    Sizewell B
  • Diversity requirements in reactor protection
    systems
  • Possibly lower protection system targets
  • Passively safe systems will make fewer demands
  • Commercial Off the Shelf systems
  • Assessment of evidence
  • Smart Instruments
  • Regulator considering application to nuclear
    facilities
  • Assessment of evidence

23
Recommendations
  • IAEA topics
  • Estimating and extending life of IC equipment to
    address ageing and obsolescence
  • Supporting the evaluation, acceptance and
    licensing of digital IC system
  • Lessons learned from IC project implementation
    and guidance for modernisation and new plant
    project