Title: Current status of NPP C
1Current status of NPP CI in the United Kingdom
21st Meeting of the Technical Working Group on
Nuclear Power Plant Control and Instrumentation,
23-25 May 2007, Vienna
- T P Smyth
- AMEC NNC, Knutsford, Cheshire, UK
2Current status of NPP CI in the United Kingdom
- Nuclear Power Plants in the UK
- Status of CI at AGR nuclear plants
- Reactor Protection Systems
- Data Processing Systems
- Refuelling machines
- Status of CI at PWR plant
- Simulators
- Status of regulatory environment affecting CI
- Recommendations
3Nuclear Power Plants in the UK (1)
4Nuclear Power Plants in the UK (2)?
- Electricity sources
- 20 nuclear
- 37 gas
- 34 coal
- Need to plan for energy replacement
- 7 plants will close in next 11 years
- 14 reactors
- 7294 MWe
- 13 of electricity sources
- North Sea oil and gas will be limited in future
- 23 May 2007
- Government announces 20 week consultation process
- Government wants to take decision this year
- No public money
5AGR Reactor Protection Systems (1)?
6AGR Reactor Protection Systems (2)?
- Obsolescence of equipment
- Difficulty in obtaining spares
- Repairs
- Replacement
- Analogue trip units
- Neoprene degradation
- New equipment
- Majority of protection parameters have been
addressed
7AGR Reactor Protection Systems (3)?
- Neoprene insulation degradation
- Magnox Oldbury power station
- Degradation with age
- Perishing
- Sweating
- Hygroscopic
- Becomes conductive - resistance lt 1 M?
- Stray currents in sensitive circuits
- Thermocouple amplifiers
8AGR Reactor Protection Systems (4)?
- Neoprene insulation degradation?
9AGR Reactor Protection Systems (5)?
- Neoprene insulation degradation
10AGR Reactor Protection Systems (6)?
- Neoprene insulation degradation
- Survey of all safety equipment
- Presence of neoprene
- State of neoprene
- Circuit function
- Replacement equipment at older stations
- Obsolescent anyway
- Repairs at newer stations
- Heysham 2 / Torness
- 4 years work, 2 more years to finalise all
equipment
11AGR Reactor Protection Systems (7)?
- Neutron Flux measurement systems
- AGR detectors located in core at 8 locations
- High temperatures
- Detector spares
- Wide range detector integral cable
- Manufacturing spares re-establishing production
processes - Currently a batch of 10 in progress
- Electronic units
- Neoprene
- Complete refit
- Repairs at Heysham 2 / Torness
12AGR Reactor Protection Systems (8)?
- Diverse Guardline upgrade
- Hinkley B / Hunterston B / Dungeness
- Driven by licensing basis for nuclear power
plants - Large subset of Main Guardline parameters
duplicated - From 1995 to 2000
- Heysham 2 / Torness had diverse guardlines from
the outset. - Hartlepool / Heysham 1 were judged to have
adequate diversity in protection systems
13AGR Data Processing Systems
- Safety claims on equipment
- Some reactor control functions
- Some alarms
- Hinkley Point B
- New DPS installed (1999)?
- Dungeness B
- New DPS being installed
- Control / equipment protection functions
segregated - Other AGR's
- Stabilization of equipment
- Adequate spares provision / hardware support.
- Improved air conditioning
- Limited re-manufacturing (optical transceiver
boards)?
14AGR Refuelling Machines (1)?
15AGR Refuelling Machines (2)?
16AGR Refuelling Machines (3)?
- Online refuelling
- Stringent safety requirements
- Equipment obsolescence
- Key focus at present
- Heysham 2 / Torness
- Replacement of Reypac controllers with Siemens S7
- I/O replaced, emulates original equipment
- Reypac controller replacement in progress
- Software reverse engineered and ported
- Safety functions partitioned
- Safety standards
- Modern standards considered when replacing
equipment
17PWR Principal CI Systems (1)?
18PWR Principal CI Systems (2)?
- Equipment Life cycle management
- Review of equipment status
- Review of spares holdings
- Participation of OEM (Westinghouse)?
- HICS
- Optical transceiver units obsolete
- New units re-engineered by Westinghouse
- Adequate spares manufactured
19Simulators
- Sizewell B
- On site
- Replaced in 2003
- Duplicate DPS
- Can be modified at the same time as the main DPS
- WANO recommendation
- AGR's
- Goal was to establish a simulator at each site
- Hartlepool - new simulator
- Heysham 2 / Torness
- Upgraded to increase fidelity
- WANO recommendation
20Regulatory Environment (1)?
- Standards hierarchy
- NII SAPS
- IAEA standards
- IEC standards
- IEC 61226
- PSA based assessment
- Target 10-7 / year
- Limit of reliability claims for software based
systems - Assume 1 demand / year
- 10-4/demand
- Require diverse protection to make up 10-3/demand
21Regulatory Environment (2)?
- Application to Sizewell B
- Primary Protection System
- Four channels, 2 out of 4 tripping
- Software based
- Production excellence
- IEC 61880
- Independent confidence building
- Extensive testing
- Independent code safety assessment
- Secondary Protection System
- Four channels, 2 out of 4 tripping
- Protection for frequent faults
- Laddic magnetic amplifiers
- Diverse technology
22Regulatory Environment (3)?
- New build
- In general, same regulatory requirements as
Sizewell B - Diversity requirements in reactor protection
systems - Possibly lower protection system targets
- Passively safe systems will make fewer demands
- Commercial Off the Shelf systems
- Assessment of evidence
- Smart Instruments
- Regulator considering application to nuclear
facilities - Assessment of evidence
23Recommendations
- IAEA topics
- Estimating and extending life of IC equipment to
address ageing and obsolescence - Supporting the evaluation, acceptance and
licensing of digital IC system - Lessons learned from IC project implementation
and guidance for modernisation and new plant
project