Monthly Status ReportePayroll Project
  • Marshall Space Flight Center
  • Date 11/19/03

2
Table of Contents
  • Summary Status
  • Accomplishments
  • Activities in Progress
  • Issues
  • Reference Material / Backup
  • High Level Schedule

3
Summary Status
4

Accomplishments
  • OPERATIONAL
  • Completion of crosswalk for FPPS Datamart fields
    to NASA Interfaces
  • Field categories
  • Fields that do not exist in either the Datamart,
    FPPS, or the Combined file
  • Fields that do not exist in the Datamart, but do
    exist in FPPS
  • Fields that will be required to be added due to
    functional CRs
  • Disseminated to Centers
  • Labor Distribution Scope Assessment
  • Labor Distribution Interfaces and Reports Scope
    Finalized
  • DOI to supply 1 labor cost file per center
  • NASA will not standardize Labor Distribution
    under ePayroll (Steering Committee decision)
  • Reports SWAT Team Work Sessions
  • Review of Agency and Center-unique reports
    completed
  • Reduction in reports from 374 to 78
  • Agreement on historical data conversion
  • Established joint NASA/DOI team for conversion of
    historical data
  • NASA will provide conversion routines for
    migration of NPPS History to FPPS datamart with
    the assistance of DOI

 
5

Accomplishments
  • OTHER
  • Meeting with DOI, October 20
  • Established SSL requirements for FPPS development
    environment
  • Load Testing High Level Requirements for NASA/DOI
  • Load testing infrastructure to be in place by
    early December
  • DOI to provide detail test cases for requirements
    in establish Load Runner scripts
  • Established critical path dates for e-Payroll
    implementation
  • Historical data conversion contingency defined
  • Establishment of Standardized Communications
  • Change Management and Training Bi-Weekly Meetings
  • Center Transition Team Weekly Meeting
  • Migration Teams Weekly Meeting

 
6
Activities In Progress
  • OPERATIONAL
  • Interface Control Documents (ICD) Definition
  • Provide ICD documents to centers 12/15/2003
  • Center review and confirmation of ICDS 1/5/2004
  • Reports SWAT Team Work Sessions
  • EEO reports requirement modified due to NASA
    Classification Code
  • Definition of minimum standard reports for the
    Agency by 11/21/03
  • OTHER
  • Standardized Award system
  • Business case analysis underway
  • Delay in collecting baseline support information
    from SAP
  • Meeting with DOI, December 1-5, 2003
  • Discuss specific training requirements for FPPS
    migration
  • Establish training schedule for agency/center
    level training
  • Key project documents under review
  • Project Plan
  • Risk Management Plan
  • Quality Assurance Plan
  • Baseline of Implementation Schedule

7
Activities In Progress
  • OTHER (Cont.)
  • Validation of center budget submissions
  • Interfaces and Reports
  • Other
  • Remaining Items for Formulation Closeout
  • Response from DOI on Gaps Assessment Package
  • Presentation of project plan to Steering
    Committee
  • ePayroll Scope Document Final Update

8
Issues
9
Reference / Backup
BACKUP
10
Summary Status Criteria
Project Criteria
11
High Level Schedule