Title: E.I.G. Euridice G.I.E.


1
E.I.G. Euridice G.I.E.
  • Operation and Management
  • of the URL and other
  • Infrastuctures.

Marc Buyens Kris Moerkens Bert Vreys Alex
Isenborghs Christian Lefèvre Johan Peters
2
E.I.G. Euridice G.I.E.
  • History of the project (2)
  • Experimental programme (1)
  • Services to third parties (1)
  • Exploitation conditions (4)
  • Operational cost (4)
  • Safety structure of EURIDICE (1)

3
Milestones
  • 1974 Selection of the Boom Clay Formation.
  • 1975 Core Sampling (Geology, Geotechnical).
  • 1978 In situ tests in Terhagen.
  • 1980 - 1984 Construction of the URL.
  • 1987 Construction of the TD an the ANDRA
    gallery.
  • 1995 Construction of the demo hall and
    officces.
  • 1997 - 1999 Construction of the second shaft.
  • 2001 - 2002 Construction of the connecting
    gallery.
  • 2002 - ???? Construction of the ventilation
    building.

4
URL since 1987.
5
Experimental Programme
  • Characterisation of the Boom clay
  • Mine-by test, Archimedes, Phebus, Cactus, ...
  • Interaction between waste package and Boom clay
  • Corrosion tests, degradation of waste forms,
    corrosion of container materials, ...
  • Migration of radionuclides and gas in clay
  • Backfill and Reseal of shafts and galleries
  • Integrated experiments involving radiation
  • Cerberus, Coralus, ...

6
Services to third parties
  • Canberra Semiconductor N.V.
  • Temporary underground storage of germanium
    crystals in 1991 and 1992
  • IRMM
  • Underground gamma background and low activity
    measurements since 1993
  • Philips Eindhoven
  • Underground storage of video chips since 2000
  • UM electro-optic materials
  • Possibility of underground production of
    germanium crystals for the Max Planck Institute.

7
Exploitation conditions
  • Ministry of Labour and Employment
  • ARAB / RGPT
  • AREI / RGIE
  • Ministry of Economic Affairs
  • Administration of Quality and Safety
  • (former Mining Authority)
  • Mining regulations

8
Exploitation conditions
  • SCK licence Nr. N.0024 (R.D. 1986/11/19)
  • Hades licence
  • Safety files SCK
  • Use of radio-elements
  • HADES licene Nr. 1.777.51SVYL (1984/11/19)
  • R.D 1965/04/12 and 1972/04/04 (employment)
  • ARAB / RGPT
  • Specific conditions

9
Exploitation conditions
  • The owner has to appoint some one (responsible
    leader) to exercise supervision on the
    exploitation of the underground facilities (art.
    18 - R.D. 1965/04/12).
  • Access regulations
  • Working instructions
  • Safety instructions for underground activities
  • Special instructions for activities by a third
    party
  • Instructions for the use of radioactive elements
  • Emergency plan
  • Inspection procedures

10
Exploitation conditions
  • For the dayly operation of the facilities, the
    responsible leader can delegate a part of the
    responsability to other people.
  • (These peoples are called green helmets)
  • Operation of the hoisting gear
  • Operation of the cage (elevator)
  • Responsible for a working team in the underground
  • ......................

11
Operational Stand By costs
  • Rent of the hoisting gear and the headframe of
    the first shaft.
  • Manpower to keep the installation operational
  • Legal inspections by AIB-Vinçotte and AVN
  • Legal inspections by own people
  • Maintenance of equipment
  • Power consumption
  • ...............

12
Operational Stand By cost
  • Level 1 991,57 /day
  • Underground visits
  • Covers the winding installation and the operator
  • Level 2 1.760,04 /day
  • Field activities without the use of the DAC
    system
  • Covers level 1, utilities, legal deputy for
    underground activities
  • Level 3 1.859,20 /day
  • Field activities with the use of the DAC system
  • Covers level 2, the DAC system

13
Operational Stand By cost
  • Use of the drilling equipment 1.748,29 /day
  • In this cost the working team (1 A2 and 2 A3) and
    supervision is included
  • Charges for employees
  • A0 109,17 /hour
  • A1 75,26 /hour
  • A2 57,73 /hour
  • A3 41,67 /hour

14
Operational Stand By cost
  • Every user pays 1 OSB a month, unesteemed the use
    of the installations.
  • This cost must be seen as fixed participation in
    the operational cost.
  • Beside this it is foreseen to charge users for
    their active use of the installations.
  • Days of active use of the installations multiply
    by the OSB.
  • Use of the drilling equipment.
  • Use of other employees.
  • .

15
Safety structure EURIDICE
SCK-CEN
ESV EURIDICE
NIRAS/ONDRAF
Directeur
Directeur
P.A. IDPBW Ind. Veiligheid Medisch
toezicht Ergonomie Socio-psycho.
asp. Arbeidshygiëne Fysische Controle
P.A. IDPBW Ind. Veiligheid Ergonomie Arbeidshygiën
e
Verantwoord. leider HADES (1)
Veiligheids- coördinator (2)
(12.04.65)
(ER 1992/57/CEE)
(04.08.96)
(04.08.96) (28.02.63)
P.C. IDPBW ESV EURIDICE (3)
(1), (2), (3) dezelfde persoon "Preventie
Coördinator
16
(No Transcript)