Title: Invercargill Schools Slide Show
1The attached presentation is of remodelling work
carried out in a number of schools in
Invercargill as a result of school
reorganisations in 2005. For further information
on any of the work carried out at these schools
contact Gavin McKenzie Network Facilitator
Ministry of Education Invercargill Phone 03
211 3614
2Invercargill Schools
Slide Show 4 April 2006
3Donovan Primary School
- Three primary schools merged into one
- Established on a closed intermediate school site
- Technology spaces remodelled into regular
classrooms
4New playground
5Workshop conversion underway
6Remodelled classroom
7Another workshop being transformed
8Another classroom remodelled for the kids
9Bluff Community School
- Two primary schools merged into one
- The school site previously had 112 students and
is now projecting to have 147 students this year - The junior block and administration area has been
remodelled - Lift access and new toilets blocks are planned
for this year
10Remodelled administration block
11Remodelled classroom block
12Upgraded classroom
13Upgraded junior room
14New River Primary School
- Four primary schools merged into one
- The school site previously had 144 students and
is now projecting to have 311 students this year - Five relocatable classrooms and a hall moved onto
site then upgraded
15Before the verandah
16With the verandah
17Hall on the move
18Hall on its new site
19Five relocatable classrooms moved on site from
several different schools
20Upgraded relocatable classrooms
21Cloak bay entry to classroom
22Upgraded classroom with interactive whiteboard
23New classroom colour scheme
24Newfield Park Primary School
- Two primary schools merged into one
- The school site previously had 367 students and
is now projecting to have 339 students this year - Two relocatable classrooms moved onto site for
bilingual classes and upgraded
25Verandah added to main block
26Low maintenance materials chosen
27New cloakbay used to join the relocatable
classrooms together and enhance the block
28Shelter provided with a verandah
29Interactive whiteboard in upgraded classroom
30New centralised resource storage room
31Fernworth Primary School
- Two primary schools merged into one
- The school site previously had 320 students and
is now projecting to have 488 students this year - A new four classroom block has been completed
- A reading recovery centre and dental clinic
buildings were relocated onto the site
32New classroom block
33Before classrooms were moved and upgraded
34Relocatable rooms after upgrading
35Verandah feature
36Light and bright classrooms
37Good quality display areas provided
38Southland Girls High School
- Changed from a Year 9 to 13 to a Year 7 to 13
school - Previously had 828 students and now has 1,212
students - Expanded into the neighbouring Tweedsmuir Junior
High School site - Heavy tile roofs replaced, courtyard redeveloped
where 10 classrooms were removed from
39Heavy tile roof replaced with lightweight roof
40Ex Tweedsmuir Junior High School building
41Southern style signage throughout the school
campus
42Old bike sheds now used for storage and sheltered
lunch area
43Relocated staffroom
44Large staff area
45Older classrooms upgraded
46Laboratory shared by two classrooms
47Classroom adjoining shared lab
48Classrooms upgraded with colour
49Every classroom is a different colour
50Southland Boys High School
- Changed from a Year 9 to 13 to a Year 7 to 13
school - Previously had 550 students and now has 1,086
students - Six relocatable classrooms moved onto the site
from other schools - Heavy tile roofs replaced, technology block
extended, classrooms remodelled for Year 78
students
51Structurally strengthened about 1992
52Hall strengthened and extended
53Lockwood relocatable classrooms
54Glass used to lighten spaces
55Before walkway added
56After walkway added to Year 78 home rooms
57New toilet block and entry
58Aurora College
- This is a new school that was created following
the closure of Mt Anglem College and Tweedsmuir
Junior High School - The school site previously had 478 students and
now has 556 students this year - Mt Anglem College remodelled the S68 design
buildings with a 7M budget to create separate
senior and junior campuses on the one site
59The information centre is central to the site
60Gymnasium additions
61IT Hub in Library
62Shared space adjoining classrooms
63Covered social space
64Senior shared space
65New technology additions
66James Hargest College Senior Campus
- Two intermediate and one high school merged and
situated on two sites - The two school sites previously had 1,853
students and now has 1,844 students this year - Two Nelson block designed buildings have been
redeveloped to meet the needs of the school
67Library redevelopment
68Artwork in foyer
69Issue desk area
70Visible bag area
71Library entry
72Good supervision from issue desk
73Many quiet areas included
74Comfortable reading areas
75Administration entry
76Administration foyer
77Student reception
78Ramped access to first floor
79Classroom additions to Nelson Block
80Classroom addition to Nelson Block
81Different classroom design
82James Hargest College Junior Campus
- Two intermediate and one high school merged and
situated on two sites - Classrooms have been upgraded and a new
technology block is under construction now
83Technology block sketch plan
842.4M technology block underway
85Large open shared space between classrooms
86Remodeled cloakbay
87Classroom entry upgrade
88Ascot Community School
- One intermediate and two primary schools merged
on to the intermediate school site in 1999 - A residential section was purchased to open up
the front of the site to the public
89Upgraded street entry
90Technology block
91The End