Title: Minimum Measure 6: Pollution Prevention and Good Housekeeping
1Minimum Measure 6 Pollution Prevention and
Good Housekeeping
Gravel in gutter
2Minimum Measure 3 Illicit Discharge Detection
and Elimination
Grass raked into gutter
3Minimum Measure 3 Illicit Discharge Detection
and Elimination
Storm Drain
Gravel / trash
4Yard waste
Minimum Measure 3 Illicit Discharge Detection
and Elimination
5No BMPS in place
Minimum Measure 4Construction Site Runoff
Control
6Need Best Management Practices
Minimum Measure 4Construction Site Runoff
Control
7Need BMPs
Minimum Measure 4Construction Site Runoff
Control
8Minimum Measure 6Pollution Prevention and
Housekeeping
Storm Drain
Trash / Litter
9Storm Drain Stenciling Program
Minimum Measure 2 Public Participation and
Involvement
10Minimum Measure 4Construction Site Runoff
Control
Bare soil in gutter
11Minimum Measure 4Construction Site Runoff
Control
Need BMPs
12Need BMPs
Minimum Measure 4Construction Site Runoff
Control
13Need BMP Maintenance
Minimum Measure 4Construction Site Runoff
Control
14Minimum Measure 5Post Construction Runoff
Control
15Minimum Measure 3Illicit Discharge Detection
and Elimination
Paint
16Minimum Measure 3Illicit Discharge Detection
and Elimination
Oil / Antifreeze leaks
17Minimum Measure 5Post-Construction Management
Sediment
18Minimum Measure 4Construction Site Runoff
Control
Storm Drain
19Minimum Measure 5Post-Construction Management
20Minimum Measure 6Pollution Prevention and
Housekeeping
Sediment
21Minimum Measure 6Pollution Prevention and
Housekeeping
22Minimum Measure 4Construction Site Runoff
Control
Bare Soil
Storm Drain
Gravel
23Minimum Measure 4 Construction Site Runoff
Control
24Minimum Measure 4Construction Site Runoff
Control
25Minimum Measure 4Construction Site Runoff
Control
26Minimum Measure 4Construction Site Runoff
Control
27Minimum Measure 6Pollution Prevention and
Housekeeping
28Minimum Measure 3Illicit Discharge Detection
and Elimination