Minimum Measure 6: Pollution Prevention and Good Housekeeping - PowerPoint PPT Presentation

1 / 28
About This Presentation
Title:

Minimum Measure 6: Pollution Prevention and Good Housekeeping

Description:

Minimum Measure 6: Pollution Prevention and Good Housekeeping. Gravel in gutter. Minimum Measure 3: Illicit Discharge Detection and Elimination. Grass raked into ... – PowerPoint PPT presentation

Number of Views:63
Avg rating:3.0/5.0
Slides: 29
Provided by: engineeri1
Category:

less

Transcript and Presenter's Notes

Title: Minimum Measure 6: Pollution Prevention and Good Housekeeping


1
Minimum Measure 6 Pollution Prevention and
Good Housekeeping
Gravel in gutter
2
Minimum Measure 3 Illicit Discharge Detection
and Elimination
Grass raked into gutter
3
Minimum Measure 3 Illicit Discharge Detection
and Elimination
Storm Drain
Gravel / trash
4
Yard waste
Minimum Measure 3 Illicit Discharge Detection
and Elimination
5
No BMPS in place
Minimum Measure 4Construction Site Runoff
Control
6
Need Best Management Practices
Minimum Measure 4Construction Site Runoff
Control
7
Need BMPs
Minimum Measure 4Construction Site Runoff
Control
8
Minimum Measure 6Pollution Prevention and
Housekeeping
Storm Drain
Trash / Litter
9
Storm Drain Stenciling Program
Minimum Measure 2 Public Participation and
Involvement
10
Minimum Measure 4Construction Site Runoff
Control
Bare soil in gutter
11
Minimum Measure 4Construction Site Runoff
Control
Need BMPs
12
Need BMPs
Minimum Measure 4Construction Site Runoff
Control
13
Need BMP Maintenance
Minimum Measure 4Construction Site Runoff
Control
14
Minimum Measure 5Post Construction Runoff
Control
15
Minimum Measure 3Illicit Discharge Detection
and Elimination
Paint
16
Minimum Measure 3Illicit Discharge Detection
and Elimination
Oil / Antifreeze leaks
17
Minimum Measure 5Post-Construction Management
Sediment
18
Minimum Measure 4Construction Site Runoff
Control
  • Bare soil

Storm Drain
19
Minimum Measure 5Post-Construction Management
20
Minimum Measure 6Pollution Prevention and
Housekeeping
Sediment
21
Minimum Measure 6Pollution Prevention and
Housekeeping
22
Minimum Measure 4Construction Site Runoff
Control
Bare Soil
Storm Drain
Gravel
23
Minimum Measure 4 Construction Site Runoff
Control
24
Minimum Measure 4Construction Site Runoff
Control
25
Minimum Measure 4Construction Site Runoff
Control
26
Minimum Measure 4Construction Site Runoff
Control
27
Minimum Measure 6Pollution Prevention and
Housekeeping
28
Minimum Measure 3Illicit Discharge Detection
and Elimination
Write a Comment
User Comments (0)
About PowerShow.com