Title: AMPO
1Regional 2025 Transportation Plan Performance
Measures AMPO Conference San Antonio,
Texas October 14, 2004 Paul T. Hamilton, Chief
Planner Tri-County Regional Planning
Commission Lansing, Michigan
2(No Transcript)
3Preliminary Comparative Analysis of Scenarios
Used in Selecting the Preferred Alternative
4Preliminary Comparative Analysis of Scenarios
Used in Selecting the Preferred Alternative
(continue)
5Transportation System Performance Measures Land
Use Alternative Analysis
6(No Transcript)
7Summary of Impacts
8Impact Evaluations
Scenario Preference
9Adopted Regional Land Use Vision
10TCRPC Congestion Management
- Crash rate analysis
- Congested vehicle miles of travel (VMT)
- Congested vehicle hours of travel (VMT)
- Average speed
- Congested speeds
- Delays durations, extent, severity
- Delay per incident
- Average travel time per trip
- Persons per hour on the facility or in a corridor
- Level of Service (LOS)
- Congested lane miles
- Percent of vehicle miles traveled by function
classification - Vehicle miles traveled per lane mile
- Delay per lane mile
- Delay per vehicle mile traveled
- Delay per trip
- Delay per vehicle
- Delay rate
- Travel rate
11Model Performance
12-Model Performance
13(No Transcript)
14(No Transcript)
15(No Transcript)
16(No Transcript)
17(No Transcript)
18(No Transcript)
19(No Transcript)
20(No Transcript)
21Program Category Small Urban
- Performance Measures
- Crash Rates
- Pavement Condition Ratings
- Level of Service
22Program Category Enhancements (Non-Motorized)
- Performance Measures
- Additional miles of non-motorized facilities
constructed - Reduction in crashes involving bicycles or
pedestrians - Connections between origins and destination for
non-motorized trips - Maintenance/surface condition of the facilities
- Number of barriers eliminated
- Use by user types
- Number of gaps filled or links completed
- System connectivity, as measured by the number
and type of access points to the facility.
23Program Category Enhancements (Aesthetic)
Performance Measures Number of miles of
aesthetic treatment implemented. Equity of fund
allocation within the region for all communities.
24Program Category Enhancements (Historic
Preservation)
- Performance Measures
- Support for local preservation efforts
- Number of structures or acres preserved
25Program Category Enhancements (Wildlife
Mitigation)
- Performance Measures
- Number of projects completed
- Deer/car crashes
- Impacts on habitat preservation
- Impacts on wildlife population
26Program Category Enhancements (Drainage)
- Performance Measures
- Samples of inflow and outflow to determine
sedimentation rates, or prior similar experience
for sedimentation rates (such as the National
Urban Runoff Program database). - Acre feet of transportation related runoff
diverted from non-point source dispersion. - Number of successful project applications
27Program Category Improve-Expand
- Performance Measures
- Crash rate analysis
- Congested vehicle miles of travel
- Congested vehicle hours of travel
- Average speed
- Congested speeds
- Delays duration, extent, severity
- Delay per incident
- Average travel time per trip
- Persons per hour on the facility or in a corridor
- Level of Service
- Congested lane miles
28Program Category Improve-Expand (continued)
- Performance Measures
- Percent of vehicle miles traveled by functional
classification - Vehicle miles traveled per lane-mile
- Delay per lane mile
- Delay per vehicle miles traveled
- Delay per trip
- Delay per vehicle
- Delay rate
- Travel rate
29Program Category Improve-Expand (continued)
- In consideration of movement of people and goods,
other performance measures may include - Proportion of persons congested or delayed
- Person hours of delay
- Vehicle occupancy
- Other performance measures as integrated in the
regional Congestion Management System. - Person throughput per hour
- Does the project support increases in housing or
population density consistent with the Regional
Growth project principles
30Program Category Bridge/Critical Bridge Program
- Performance Measures
- Number of structurally deficient and functionally
obsolete bridges within the region. - Number of bridges within the region on the state
critical bridge list
31Program CategoryPreserve
- Performance Measures
- Pavement condition ratings, such as the Ride
Quality Index or the PASER rating - Number of miles and percentage of miles on the
regional federal aid system which are in fair and
good condition.
32Program Category Transportation Economic
Development Fund (TEDF) Category A
- Performance Measures
- Number of jobs attracted or retained in targeted
industries. - Number of projects and miles of facilities
constructed.
33Program Category Transportation Economic
Development Fund (TEDF) Category D
- Performance Measures
- ? Number of miles of regional all season routes
by county. - Connections to major users of the all season
system. - Number and percentage of miles of the all season
system in good or fair condition. - Pavement condition rating, such as the Ride
Quality Index or PASER Rating
34Program Category Transportation Economic
Development Fund (TEDF) Category F
- Performance Measures
- Number of miles of regional all season routes by
county. - Connections to major users of the all season
system. - Number and percentage of miles of the all season
system in good or fair condition. - Pavement condition rating, such as PASER or the
Ride Quality Index
35Program Category Transit Capital
- Performance Measures
- Passengers per vehicle mile
- Passengers per vehicle hour
- Total daily passenger trips
- Annual maintenance cost per vehicle mile
- Annual maintenance cost per vehicle
- Annual operating costs per vehicle
36Program Category Transit Operating
- Performance Measures
- Internal transit property service evaluation
criteria - Farebox/ local funding revenue cost recovery
ratios - Passengers per revenue vehicle mile
- Passengers per revenue vehicle hour
- Operating costs per hour of service
37Program Category Enhancements (Public Transit)
- Performance Measures
- ? Is the mandatory percentage of annual transit
enhancement funds spent or expended on an annual
basis? - Number of total passenger shelters
- Number of total passenger benches
38Program Category Intermodal (Freight)
- Performance Measures
- Accessibility to intermodal facilities
- Rail crossing delay
- Train-/vehicle, or train/ pedestrian crashes
- MDOT park and ride lot usage
- Intermodal transfers at ground transportation
centers - Usage of CATA bike lockers and onboard bus bike
racks
39Program Category Airports
- Performance Measures
- Enplanements
- Boardings, deboardings
- Air cargo tonnage
40Program Category Safety
- Performance Measures
- Crash reduction factors by type of crash.
- Crashes per million entering vehicles
(intersections). - Crashes per million vehicle miles (roadways).
- Annual net reduction in crashes, injuries and
fatalities per capita of regional, county or
urban area populations. - Reduction in crashes involving bicycles and
pedestrians.
41Program Category Parking
- Performance Measures
- Parking occupancy rates
- Parking turnover rates
- Spaces per employee ratios within 1/4 mile
- Spaces per retail floor area ratio within 1/4
mile
42Program Category Management and Operations
- Performance Measures
- Person throughput per hour
- Percentage of funds allocated to management and
operations on an annual basis. - Crash rate analysis
- Congested vehicle miles of travel
- Congested vehicle hours of travel
- Average speed
- Congested speeds
- Delays duration, extent, severity
- Delay per incident
43Program Category Management and Operations
(continued)
- Performance Measures
- Average travel time per trip
- Persons per hour on the facility or in a corridor
- Level of Service
- Congested lane miles
- Percent of vehicle miles traveled by functional
classification - Vehicle miles traveled per lane-mile
44Program Category Management and Operations
(continued)
- Performance Measures
- Delay per lane mile
- Delay per vehicle miles traveled
- Delay per trip
- Delay per vehicle
- Delay rate
- Travel rate
45Program Category Management and Operations
(continued)
- In consideration of movement of people and goods,
other performance measures may include - Proportion of persons congested or delayed
- Person hours of delay
- Vehicle occupancy
- Other performance measures as integrated in the
regional Congestion Management System. - Person throughput per hour
- Does the project support increases in housing or
population density consistent with the Regional
Growth project principles
46Program Category Intelligent Transportation
Systems (ITS) Deployment
- Performance Measures
- Varies greatly depending on the ITS application
under review - Generally, reduces system-wide delay compared to
pre-deployment - Number of inquiries or hits on travel
information services, such as kiosks - Reduced operational expenses for transit
properties in monitoring ridership and fare
collection - Number of emergency dispatches re-directed to
avoid congestion or incident-related delays
47Program Category Roadside Rest Areas
- Performance Measures
- Maintenance, preservation and enhancement of
existing rest areas - Usage
48Program Category Land Use, Community Development
and Other Community Impacts
- Performance Measures
- Number of projects funded
- Annual percentage of funds allocated to implement
the Regional Growth project land use vision. - Impacts of the project on increasing population
or housing density consistent with the Regional
Growth project principles. - Person throughput per hour or day
49Proposed IndicatorsRegional Land Use Vision
- Percentage of residential units in urbanized
areas built at densities greater than or equal to
3.5 units per acre. - Percentage of non-residential development in
urbanized areas built at greater than or equal to
0.25 Floor Area Ratio (FAR). - Percentage of 40-acre urban cells that are
contiguous part of the largest unbroken grouping
of urban development in the study area.
50Proposed IndicatorsRegional Land Use Vision
(continued)
- Percentage of residential development that is
concentrated in areas where residential uses are
at least 25 percent of the land area. - At least three-fourths of new residential
development should occur within the first three
rings of urban development. - Employment growth (number of jobs) in and around
high-density employment centers. - Jobs per housing balance per census tract.
- Number of mixed-use developments constructed
annually.
51Proposed IndicatorsRegional Land Use Vision
(continued)
- Connectivity defined as the number of road
connections or nodes within subdivisions. - Percentage of residential development with
densities of one dwelling unit per acre or higher
that occurs in areas planned for sewer and water. - Acres of land preserved in perpetual open space.
- Acres of environmentally sensitive lands in large
contiguous sections acquired or preserved by
easement. - Percentage of prime agricultural areas (measured
in acres) that are still in active agricultural
production.
52(No Transcript)
53Next Steps
- 1. Assess performance Survey baseline
data/trends - 2. Forecast future performance/determine needs
- 3. Assess impact of strategies, programs and
projects (integrate into project selection) - 4. Evaluate investment options/analyze future
conditions and scenarios based on forecast
conditions and achievement of goals, objectives,
strategies - 5. Implement multi-year investment program
- 6. Monitor performance of improvements
- 7. Re-evaluate measures, establish thresholds,
update strategies
54Performance Measures
What gets measured gets done
55Thank You
Paul T. Hamilton, Chief Planner Tri-County
Regional Planning Commission (TCRPC) 913 W.
Holmes Road, Ste. 201 Lansing, MI
48910 517.393.0342 (phone) 517.393.4424
(fax) tritrans_at_acd.net (email 1) phamilton_at_mitcrp
c.org (email 2) www.mitcrpc.org (web)