Title: Washington Update
1Washington Update
- MAP-21 Reauthorization, Highway Trust Funds and
Related Transportation Issues
2Federal Update
- MAP-21 Reauthorization
- Highway Trust Fund (HTF)
- AMPO MAP-21 Recommendations
- GROW America
- USDOT MAP-21 Rulemaking
- Outlook
3MAP-21 Reauthorization
- Program authorizations expire May 31, 2015
- Senate House Infrastructure Committees
- Hearings, drafting
- Senate House Revenue Committee
- Discussion revenue options
- House Senate Budget Committees
- Both budgets establish reserve funds that would
allow spending to be increased if the revenue is
found - President/USDOT
- GROW America - 478B, 6 year bill
- 14 tax on foreign earnings of US companies
4Highway Trust Fund - Revenue
- July 2014- Congress transfers 11B from general
fund to HTF to support current spending levels
through May 31, 2015 - HTF receives 40B annually in revenue and
interest - MAP-21 spends roughly 53B annually
- 13B annual funding gap to maintain current
spending levels
5Revenue for the HTF
- Where is the revenue?
- Stand alone gas tax increase?
- VMT fee?
- Comprehensive tax overhaul with a gas tax
increase? - Devolution to the states?
- Additional general fund transfers?
Unlikely
Unlikely
Unlikely
Unlikely
Likely
6AMPO ReauthorizationGeneral Recommendations
- Address long term health of the HTF keep all
options on the table - At minimum, maintain current funding plus
inflation - Pass a 6-year reauthorization bill provide
predictability and certainty in funding and
policy
7AMPO Reauthorization Recommendations
- Empower MPOs
- Increase Surface Transportation Program (STP) sub
allocation percentage to MPOs - Sub allocate Congestion Mitigation and Air
Quality (CMAQ) - Increase Planning (PL) funding
- Include MPOs in decisions for designations of
urban freight corridors
8U.S. DOT GROW America Proposal
- 478 billion, 6-year bill
- 317b for highways
- 115b for transit
- New Programs
- New 13.4 billion Critical Immediate Investments
- New 10 billion Multimodal Freight Investments
- MPOs required to be on State advisory committees
- MPOs eligible applicants under grant program
- 2 billion Fixing Accelerating Surface
Transportation (FAST) competitive grants - 1.25 billion TIGER
9U.S. DOT GROW America MPO Provisions
- Secretary may designate an MPO as a High
Performing MPO grant additional STP funds - 70 million pilot program for MPOs 1 million in
population to improve transportation connectivity
to disadvantaged Americans and neighborhoods with
limited options - Requires MPOs to offer a higher degree of public
participation
10Looking Ahead MAP-21 Reauthorization
- Staff does not anticipate major policy shifts
- USDOT completion of performance measure rules
- No changes in apportionment formulas
- Freight program with funding is possible
- Continue improving project delivery
11MAP-21 Rulemaking/Implementation
- AMPO/AASHTO Joint Comments on Proposed National
Ambient Air Quality Standards for Ozone (3/17/15) - AMPO Comments on Additional Authorities for
Planning and Environmental Linkages (11/10/14) - AMPO/NARC Joint Comments Statewide and
Non-Metropolitan, Metropolitan Transportation
Planning (10/2/14) - AMPO Comments Statewide and Non-Metropolitan,
Metropolitan Transportation Planning (9/2/14) - AMPO Comments Highway Safety Improvement Program
NPRM (6/25/14)
12MAP-21 Rulemaking/Implementation (continued)
- AMPO Comments on the Draft Designation of the
Primary Freight Network (1/11/14) - AMPO Comments on CMAQ Interim Guidance (1/11/14)
- AMPO Comments on FTA ANPRM, National Public
Transportation Safety Plan, the Public
Transportation Agency Safety Plan, the Public
Transportation Safety Certification Training
Program Transit Asset Management (12/31/13) - AMPO Comments FTA-FHWA Transit Rep Guidance
(10/30/13)
13Outlook114th CongressTransportation
- Likely MAP-21 Extension after May 31
- The key to reauthorization is the revenue
decision
14NPRMs Schedule
Rule Dates
Highway Safety Program Grants Comment Period Closed
FTA ANPRM (Rule 60) Comment Period Closed
CMAQ Program Interim Guidance Comment Period Closed
Safety Performance Measure (Rule 26) Comment Period Closed
Highway Safety Improvement Program (Rule 30) 60 day comment period. Comment Period Closed
FHWA/FTA Metropolitan and Statewide Planning (Rule 27 61) Comment Period Closed
CMAQ Weighting Factors (Rule 33) Comment Period Closed
Planning and Environmental Linkage (supplemental to Planning NPRM) Comment Period Closed
Pavement/Bridge Performance Measure (Rule 28) Comments Due May 8
Asset Management Plan (Rule 32)60 day comment period. Comments Due April 21
System Performance Measure (Rule 29) Release September 2015
15Thank You