Title: Chittenden County, Vermont
1Chittenden County, Vermont
- Stormwater Projects supported by
- State-Tribal Assistance Grants
A presentation to Congressional staff by the
Chittenden County Regional Stormwater Education
Program
October 18, 2007
29 Municipalities-Burlington-South
Burlington-Winooski-Milton-Essex
Junction-Essex-Williston-Colchester-Shelburne
3 Non-traditional-UVM-Burlington Intl
Airport-VT Agency of Transportation
3(No Transcript)
4STORMWATER RUNOFF IN URBAN AREAS RESULTS IN AN
INCREASE IN WATER VOLUME AND SEDIMENT BEING
DISCHARGED TO VERMONTS WATERWAYS
5 SOURCES OF SEDIMENT IN STORMWATER IMPAIRED
STREAMS (1) WASHOFF OF IMPERVIOUS SURFACES
AND CONSTRUCTION SITES
6 SOURCES OF SEDIMENT IN STORMWATER IMPAIRED
STREAMS (2) CHANNEL EROSION AND
DOWN CUTTING
7 SEDIMENT IMPACTS ON WATER QUALITY IN
STORMWATER IMPAIRED STREAMS (1)
LOSS OF HABITAT
Degraded
Healthy
8 SEDIMENT IMPACTS ON WATER QUALITY IN
STORMWATER IMPAIRED STREAMS (2)
EMBEDDEDNESS OF ROCK SUBSTRATE WHICH IS
HABITAT FOR MACROINVERTEBRATES AND FISH
Healthy
Degraded
9Champlain Water District
- Applies for and receives grants and distributes
to municipalities. - Financial cash flow management
10VT-ANR
- Water Quality Division Stormwater Section
- Project Oversight
- Facilities Engineering Division
- Professional inspection and quality and cost
control during the construction phase - Management of design review
- Procurement of construction services
11FY 03 Appropriations
12FY 04 Appropriations
13(No Transcript)
14COLCHESTER, Canyon Estates, Before
15Colchester, Canyon Estates Outfall, After
16Colchester Street Sweeper
17Financial Example (Colchester)
- Activity STAG Local Total
- Legal 1,000 818 1,818
- Land 0 0 0
- Engineering 31,000 25,364 56,364
- Construction 194,000 158,727 352,727
- Equipment 84,000 68,727 152,727
- Totals 310,000 253,636 563,636
18MILTON Ridgefield Estates outfall
19MILTON Storm line catch basin cleaner/vacuum
truck
20Essex DPW Garage, Gas Pump Canopy
21Five Corners NorthInfrastructure Improvements
22Five Corners NorthBefore
23Inlet Diversion
24Swirl Separator
25Retention Chambers
26Five Corners NorthAFTER
27WINOOSKI Street Sweeper
28BURLINGTON Englesby Brook improvements
29(No Transcript)
30(No Transcript)
31South Burlington Farrell StreetStormwater
Detention Pond
32South Burlington Farrell StreetSwirl Separator
33South Burlington Farrell StreetNew Culvert
34South Burlington Farrell StreetBioretention
Facility
NOTE No picture of 2,000 s.f. porous asphalt
parking area. Not yet constructed.
35South Burlington Street Sweeper
36SHELBURNE Hullcrest Park detention basin
Storm Chambers for Detention and Retention
Manholes for Collection
Storm Tank for Settling Solids and Overflow
Distribution Manhole for even flow to all chambers
37Shelburne, Hullcrest Park, Intake
38Shelburne, Hullcrest Park
39Shelburne, Hullcrest Park, In construction
40Shelburne, Hullcrest Park
41Shelburne, Hullcrest Park, After
42Items for Discussion
- How well has the STAG program worked for
municipalities? - Have funds flowed smoothly?
- Any issues or concerns with program?
- What are future needs in terms of additional
funding or changes in funding process?