1The BABAR Silicon Vertex Tracker
- Douglas Roberts
- University of California, Santa Barbara
- BABAR Collaboration
2Outline
- BABAR and PEP-II Design and Physics Goals
- Silicon Vertex Tracker (SVT) Design
Considerations - SVT Description
- Layout
- Silicon Wafers
- Upilex Fanouts
- Readout Electronics
- Front End IC (AToM Chip)
- Hybrid and Tails
- Mechanical Support
- Assembly and Testing
- Prelim. Results From Recent System Test and Beam
Test - Project Status
3BABAR SVT Collaborators
- Italy
- INFN, Ferrara
- INFN, Milano
- INFN, Pavia
- INFN, Pisa
- INFN, Torino
- INFN, Trieste
- U.S.A.
- U.C., San Diego
- U.C., Santa Barbara
- U.C., Santa Cruz
- Lawrence Berkeley National Laboratory
- Stanford University
- U of Wisconsin
4BABAR Physics Goals
- International collaboration of 530 physicists
and engineers from 10 countries - Primary physics goal of the BABAR experiment is
the systematic study of CP asymmetries in the
decays of B0 and B0 mesons. - Reconstruct one of the B0 mesons in an exclusive
CP-study final state - Tag the flavor of the other B meson in the event
- Measure the relative decay time of the two B
mesons.
B0,zCP
ee- ????(4s),?? 0.56
5BABAR Physics Goals (cont.)
- Standard Model predicts a time-dependent CP
asymmetry - Time integral of Af(t) 0 at ?(4s), which makes
a measurement of the time dependence essential - Reason for asymmetric collider
- Good vertex determination extremely important
6PEP-II at SLAC
- Asymmetric ee- collider
- E- 9.000GeV, E 3.109GeV
- L 3.0 x 1033 cm-2 s-1 , ultimately 1034.
- 30M BB/107s
- Time between beam crossings 4.2ns
- 0? crossing angle
- Final focus dipoles 20cm from IP
- Very little space for SVT readout electronics
7SVT Design Considerations
- Vertexing Requirements
- Mean vertex separation of 250?m ???want single
vertex resolution better than 80?m. - Readily achieved with silicon strip detectors
- Acceptance
- Want as close to 4? as possible
- Magnets at 17.2?, both forward and backward
- Boost makes forward region very important
- Move most manifolds and flanges to the rear
- Coverage from 20? lt ? lt 150?.
- In center-of-mass, 0.84 gt cos?cm gt-0.95
- All electronics outside of active tracking volume
- Stand-alone tracking
- Drift chamber begins at 22.5cm, so need to
reconstruct particles with pt lt 100MeV in SVT
alone. - Radiation Tolerance
- Layer 1 averages 33 krad/yr
- Non-uniform in ?
- Local max of 240 krad/yr for 6?
8SVT Layout
- 5 Layers of double sided AC coupled silicon
microstrip detectors - Inner 3 layers have six modules arranged
azimuthally around the beampipe - Outer 2 layers have 16 and 18 modules,
respectively.
9SVT Layout (cont.)
Kevlar/Carbon Fiber Support Structure
Hybrid
Carbon Fiber Support Cone
Silicon
350mr
30?
Beam Pipe (1 X0)
- Each layer has strips oriented parallel (?
strips) and perpendicular (z strips) to the beam
line - Total of 340 silicon wafers of 6 different types
- About 0.94m2 of silicon
- 150,000 readout channels
10SVT Layout (cont.)
End View of BaBar Silicon Vertex Detector
11Silicon Wafers
- 6 different wafer models
- Wafers manufactured by Micron
- Made of 300?m thick high resistivity silicon with
a 111 orientation
12Silicon WafersMechanical Specifications
- Physical Strip Pitch includes floating strip
(strips not connected to readout electronics) - Models I, II and III have ??strips on the ? side
Models IV, V and VI have ? strips on the J side - ? strips on wedge detector vary such that the
ratio between width and pitch is a constant
13Model II Wafer, ?-Side (?)
14Model II Wafer, J-Side (z)
15Model VI Wafer (wedge),J-Side (?)
16Summary of Measured Wafer Parameters
- Quantity
- Rbias
- Vdepl
- Ibias
- CIS
- CAC
- Cback
- Rs (implant)
- Rs (metal)
- Radiation Damage
- Value
- 5 M? (varies)
- 15-40 V
- lt100nA/cm2
- 1 pF/cm
- 20-40 pF/cm
- 0.2, 0.4 pF/cm
- 27, 55 k?/cm
- 7, 13 ?/cm
- 300 nA/cm2/Mrad
Depends on model number
17Upilex Fanouts
Layer 2 Fanouts
Z Fanout
Testing Area
? Fanout
- Provide an electrical connection between the
metal strips on the silicon wafers and the
front-end chip - Gang together z strips on outer 2 layers (2
strips read out by same electronics channel) - Testing area allows for testing before readout
electronics are attached
18Upilex Details
- 50?m thick Upilex substrate
- UBE Industries Ltd, Japan.
- 4.5?m Cu layer deposited on an adhesive 150nm Cr
layer - Cu and Cr are etched to create circuit
- 150nm of Cr followed by 1?m Au (for wire bonding)
are then electrolithically deposited - Trace resistance is typ. 2?/cm
- Inter-trace capacitance 0.52pF/cm
19Front-end IC(AToM Chip)
- Must amplify, shape and digitize input in
parallel for all channels - Buffer for duration of Level 1 trigger latency
- Sparsify data for readout
- High rates and small time between beam crossings
(4.2ns) implies data acquisition, digitization,
buffering and readout must occur simultaneously
20Photo of Rad-Soft AToM
????????? 128 channels
21Shaper Output
- Shaping time set to 100ns (setable to 100, 200,
300 or 400ns) - Charge injected via on-chip calibration circuitry
22Time-Over-Threshold Output
- Comparison of analog ToT measured at comparator
output and digitized ToT
23Expected Noise Performance
- Based on full SPICE simulation
- Front-end circuit
- Detector network based on measured detector
parameters - Upilex fanout
24Test Bench ResultsLayer 2 Module
- Test bench consists of prototype of full SVT
readout system - Silicon Upilex
- Rad-Soft AToM chip and Hybrid
- Prototype data transmission and DAQ
Threshold Scan
Decreasing Threshold
Firings/(50 events)
Threshold (DAC cnts)
Firings/(50 events)
Threshold (DAC cnts)
25Test Bench ResultsLayer 2 Module
Measured Offsets and Gains for 2 ICs
26Test Bench ResultsLayer 2 Module
Noise (in DAC counts) Measured from Threshold
Scan
? Side ENC???1070 e- (calc 880 e-)
J Side ENC???860 e- (calc 600 e-)
27Hybrid
- Double sided, multi-layer, thick-film circuit
fabricated on 1.2mm thick AlN - 3 Different Models
- H1 (Layers 1 and 2) has 7 ICs/side
- H2 (Layer 3) has 10 ICs/side
- H3 (Layers 4 and 5) has 4 ICs on ? side, 5 on z
side - Connects to power and data transmission system
via flexible multi-layer kapton/copper tail (2
per hybrid)
28Hybrid Pictures
Component Layout of H1 (Layers 1 and 2) with 7
ICs per side
Photograph of H3 prototype (Layers 4 and 5)
29Mechanical SupportRibs and Foot
Layer 2 Rib and Endpiece Assembly
Exploded View of Foot Region
CF Endpiece
Kevlar/CF Ribs
Berg connector and tails
Cooling Ring
Silicon
UpilexFanouts
AToM IC
AlN Hybrid
30Mechanical Support
- Modules mounted on brass cooling rings, which are
mounted on carbon fiber support cones - Forward and Backward cones held together with
carbon fiber space frame - Entire assembly mounted on B1 magnets (final
focus RE dipoles)
31Finished Space Frame
32Module Assembly and Testing
? Side
Layer 2 Half-Module in Ringframe
fixture. Upilex testing area still attached.
z Side
33Testing Probe
- Automated probe for testing modules before
readout IC is attached - Uses 256-pin probe array to contact testing area
on Upilex fanout - Connects to pA meter / Voltage source, LCR meter,
single channel Q-amp
34Attachment of Hybrid
- Upilex testing area is removed
- Hybrid is attached to Upilex
- Still utilizes same ringframe fixture
35Module Stiffening
Gluing carbon fiber / Kevlar ribs to a Layer 2
Module
Finished Module after rib attachment(upside-down)
36Arch Module Assembly
- Module is assembled flat
- Wafer-to-wafer gluing (except at bend)
- Upilex fanout glued to silicon
- Wirebonding and testing
- Attachment to hybrid
- Bend angles vary from 21? to 28?
- Bending operation done on three fixtures that
simulate the positions of the support cone
mounting buttons - Defines rotation angle and axis
- Stiffening ribs attached after bending is
complete.
37Prelim. Testbeam Results
- CERN testbeam run with prototype layer 2 and
layer 5 modules - Just finished data taking Monday, Aug. 25
- All results are VERY PRELIMINARY
- Chip calibration not done.
- No alignment corrections made
Correlation between projected track position and
hits in the SVT module
PRELIM
38Prelim. Testbeam Results
- Position correlation vs. angle of incident track.
PRELIM
39Project Status
- Many mechanical parts fabricated support cones,
space frame, ribs, endpieces... - Silicon wafer production underway all 6 models
perform as expected - 60 of wafers already delivered from Micron
- System test has verified a working readout system
with reasonable noise performance - Final version of AToM IC has been submitted for
rad-hard fabrication expect chips in Dec. - First Layer 2 and Layer 5 modules have been
constructed - Goal for installation End of 1998