Title: CMMI 1


1
Capability Maturity Model Integration
(CMMISM)Presentation to Omaha SPINDec 2,
1999Bob Rassa, RaytheonDeputy Chair, CMMI
Project
Capability Maturity Model and CMM are
registered with the U.S. Patent and Trademark
Office SM - CMMI is a service mark of Carnegie
Mellon University
2
Objectives
  • Present the background and current status of CMM
    Integration
  • Discuss structure and sample content of the new
    maturity models
  • Present timeline for public release of the models
    and pilot assessments
  • Discuss transition from the current maturity
    models and assessment methods

3
Agenda
  • Introduction
  • Background
  • Design Approach
  • Comparison to SW-CMM v1.1
  • Comparison to EIA IS 731 (SECM)
  • Assessment Methodology
  • Comment Process
  • Transition Process
  • Discussion

4
Background
  • Objectives
  • Review CMMI objectives
  • Review key requirements and source material
  • Discuss CMMI project
  • Compare and contrast current maturity models
  • CMM for Software, SECM, IPD-CMM
  • Staged, continuous
  • Introduce CMMI terminology

5
What are Capability Maturity Models?
  • Organized collections of best practices
  • Based on work by Crosby, Deming, Juran,
    Humphrey...
  • Systematic ordered approach to process
    improvement.
  • Means of measuring organizational maturity.
  • Have proven to bring significant return on
    investment in productivity and quality.

6
How are CMMs used?
  • Process Improvement
  • Process Definition
  • Competency Assessment
  • Risk Management
  • Communication

7
The Current Situation - every silver lining has a
dark cloud
  • Explosion of CMMs and CMM-like models
  • Multiple models within an organization
  • Multiple assessments
  • Multiple training
  • Multiple expenses

8
Courtesy Sarah Sheard, SPC
9
Why is This a Problem?
  • Similar process improvement concepts, but...
  • Different model representations (e.g. staged,
    continuous, questionnaire, hybrid)
  • Different terminology
  • Different content
  • Different conclusions
  • Different appraisal methods

10
The Silver Lining - each model shares a common
basis for process improvement
  • Improvement in any discipline is a function of
    performing
  • Implementing practices that reflect the
    fundamentals of a particular topic (e.g.
    configuration management)
  • Institutionalizing practices that lead to
    sustainment and improvement of an implementation

11
Thus all CMMI source models contain
  • Implementing practices grouped by affinity
  • Institutionalizing practices that vary from model
    to model, however all models specify levels that
    describe increasing capability to perform

12
Improvement Levels
Continuously
Optimizing
(5)
improving
process
Quantitatively Managed
(measured)
(4)
Predictable
process
(standard)
Standard,
Defined
(3)
consistent
process
(planned and tracked)
Managed
(2)
Disciplined
process
(performed)
Initial
(1)
Not performed (0)
13
The CMMI Project
  • DoD and NDIA sponsored
  • Collaborative endeavor
  • Industry (NDIA Systems Engineering Committee)
  • Government (OSD plus Services)
  • SEI
  • Over 100 people involved

14
CMM Integration Project
Steering Group
Stakeholder/ Reviewers
Co-Chairs P. Babel / B. Rassa
Product Development Team
Chief Architect R. Bate
Project Manager M. Phillips/D. Ahern
Coordinating IPT Team leads
Editors (CCB)
Training Meth. IPT
Assessment Meth. IPT
Reqmts. IPT
Architecture IPT
PA Author Groups
IPPD IPT
Usability Team
Lotus Notes Team
Pilot Planning
15
The CMMI Development Team
  • U.S. Air Force
  • U.S. Navy
  • Federal Aviation Administration
  • National Security Agency
  • Software Engineering Institute (SEI)
  • ADP, Inc.
  • Boeing
  • Computer Sciences Corp.
  • Ericsson Canada
  • General Dynamics
  • Honeywell
  • Litton
  • Lockheed Martin
  • Marconi
  • Northrop Grumman
  • Pacific Bell
  • Raytheon
  • Rockwell Collins
  • Thomson CSF
  • TRW

16
CMMI Design Goals
  • Integrate the models, eliminate inconsistencies,
    reduce duplication
  • Reduce the cost of implementing model-based
    process improvement
  • Increase clarity and understanding
  • Common terminology
  • Consistent style
  • Uniform construction rules
  • Common components
  • Assure consistency with ISO 15504
  • Be sensitive to impact on legacy efforts

17
Benefits
  • Efficient, effective assessment and improvement
    across multiple process disciplines in an
    organization
  • Reduced training and assessment costs
  • A common, integrated vision of improvement for
    all elements of an organization
  • A means of representing new discipline-specific
    information in a standard, proven process
    improvement context

18
The Challenge
  • Extract the common or best features from the
    source models
  • Provide users the ability to produce single- or
    multiple-discipline models, both continuous and
    staged, tailored to their organizational needs.
  • Provide users the ability to assess and train
    based on these models.

19
CMMI Source Models
  • Capability Maturity Model for Software V2, draft
    C (SW-CMM V2C)
  • EIA Interim Standard 731, System Engineering
    Capability Model (SECM)
  • Integrated Product Development Capability
    Maturity Model, draft V0.98 (IPD-CMM)

20
Source Model Terminology
21
Staged Representations
  • Key Process Areas are grouped in the stages
    (levels) from 2 to 5
  • Each Key Process Area contains implementing
    practices (activities) to achieve the purpose of
    the process area.
  • For a Key Process Area at a given stage,
    institutionalizing practices are integral to the
    process area.

22
Staged ModelSW-CMM V2.0 draft C
Level
Focus
Key Process Areas
Org Improvement Deployment Org Process and Tech
Innovation Defect Prevention
Continuous
5
process
Optimizing
improvement
4 Quantitatively Managed
Organization Process Performance Statistical
Process Management Org Software Asset Commonality
Quantitative management
3
Peer Reviews Project Interface Coordination Softwa
re Product Engineering Organization Training
Program Organization Process Definition Organizati
on Process Focus
Process Standardization
Defined
Software Configuration Management Software
Quality Assurance Software Acquisition
Management Software Project Control Software
Project Planning Requirements Management
Basic Project Management
1
Competent people and heroics
Initial
23
Continuous Representations
  • A process area contains Specific Practices to
    achieve the purpose of the Process Area. Some of
    these practices may reside at higher Capability
    Levels (Advanced Practices)
  • Generic Practices are grouped to define
    Capability Levels
  • Generic practices are added to the Specific
    Practices of each Process Area to attain a
    Capability Level for the Process Area.
  • The order in which Process Areas are addressed
    can follow a recommended staging.

24
Continuous Model
GP
GP
CL5
GP
GP
GP
CL4
GP
GP
GP
CL3
GP
GP
GP
GP
GP
CL2
GP
GP
GP
Implemented
NI
NA
NR
PA
PP

RQ
QA
PM
SA
CM
PD
QM
CA
PI
RS
PA - Process Area
CL
- Capability Level
GP - Generic Practice
NI - Not Implemented
NA - Not Applicable
NR - Not Rated
25
CMMI Model Terminology
26
Assessment Methods
  • CBA IPI Method
  • Rating of goals
  • Single digit rating
  • Full goal satisfaction
  • More strict data validation requirement
  • SECM Assessment Method
  • Rating of practices
  • Granularity options
  • Partial credit options
  • Less strict data validation requirement

Both methods use the same basic set of activities
27
The CMMI Challenge
  • Integrate three source models that have many
    differences
  • Provide consistency with ISO 15504
  • Maintain support from user communities
  • Develop framework to allow growth to other
    disciplines

28
Design Approach
  • Objectives
  • Review design goals
  • Discuss framework for CMMI
  • Describe CMMI components
  • Outline CMMI products
  • Discuss CMMI Schedule and current issues

29
The CMMI SolutionA Product Line Approach
30
The CMMI Product Line
The CMMI product line is a product suite sharing
a common, managed set of features that satisfy
specific needs of a selected domain.
pertain to
is satisfied by
share an
Products
guides development of
are built from
31
CMMI Product Suite
Framework
Input
Transform
Output
  • Common
  • content
  • Discipline
  • content
  • Criteria for
  • content
  • Rules for
  • generating
  • products
  • -Model
  • -Assessment
  • -Training
  • Integrated
  • model(s)
  • Assessment
  • method(s)
  • Training
  • materials

Repository
32
Framework
  • Components
  • Construction rules
  • Conceptual architecture

33
The CMMI Framework
  • Framework General
  • Glossary
  • Development Standards and Guidelines
  • Document Templates
  • Assessment Methodology
  • Framework Training Materials

Shared (Discipline XY)
Discipline Y
Discipline X (DX) DX Amplifications DX Process
Areas DX Assessment Material DX Model Training
Material DX Assessment Training Material
Process Management Core (PMC) PMC Generic
Practices/Templates PMC Process Areas PMC
Assessment Material PMC Model Training
Material PMC Assessment Training Material
Integration Core (IC)IPPD Environment IC Generic
Practices/Templates IC Process Areas IC
Assessment Material IC Model Training Material IC
Assessment Training Material

Output Models Assessment Methods Model Training
Materials Assessment Training Materials
34
CMMI V0.2 Staged Process Areas Maturity Level 2
  • Process Management Core Engineering (SE SW)
  • Project Planning Requirements Management
  • Project Monitoring and Control
  • Configuration Management
  • Process Product Quality Assurance
  • Supplier Agreement Management
  • Data Management
  • Measurement Analysis

35
CMMI V0.2 Staged Process Areas Maturity Level 3
  • Process Management Core
  • Organizational Process Focus
  • Organizational Process Definition
  • Organizational Training
  • Integrated Project Management
  • Risk Management
  • Decision Analysis Resolution
  • Engineering (SE SW)
  • Customer Product Requirements
  • Technical Solution
  • Product Integration
  • Product Verification
  • Validation

36
CMMI V0.2 Staged Process AreasMaturity Levels 4
5
  • Process Management Core
  • Quantitative Management of Quality and Process
  • Organizational Process Performance
  • Causal Analysis and Resolution
  • Organizational Process Technology Innovation
  • Process Innovation Deployment

37
CMMI Products
  • CMMI Models
  • Assessment Material
  • Training Material
  • Model Developer Material

38
Assessment Material
  • Assessment requirements
  • Assessment methodology
  • Assessment data collection methods and tools
    (e.g., questionnaires, interviews)
  • Assessment Team qualifications

39
Training Material
  • Model Training
  • Assessment Training
  • Team Training
  • Lead Assessor Training

40
Model Developer Material
  • Glossary
  • Framework and model content criteria
  • Framework Training

41
CMMI Schedule
  • August 31, 1999 Release CMMI-SE/SW V0.2 for
    public review.
  • Dec 15, 1999 Release CMMI-SE/SW/IPPD for public
    review
  • Nov 1999-May 2000 Pilot assessments
  • Jun-Aug 2000 Publish models V1.0

42
CMMI-SE/SW compared to SW-CMM v1.1
  • Objectives
  • Describe Background
  • Discuss Model Component Comparison
  • Process Areas
  • Common Features

43
Background - 1
  • SEI had completed updates to the SW-CMM when the
    CMMI project was started
  • SW-CMM v2 Draft C was used as the source model
    for CMMI
  • Adapted for compatibility with SE
  • Most of the community is currently using SW-CMM
    v1.1
  • Detailed traceability matrices are being developed

44
Background - 2
  • CMMI- SE/SW staged representation is similar to
    SW-CMM v1.1
  • Maturity Levels composed of Process Areas
  • Goals are required implemented
    institutionalized
  • Practices are expected alternative practices are
    acceptable if effective at meeting the goals
  • All else is informative
  • CMMI- SE/SW continuous representation reflects
    the same info in a SPICE-like structure

45
SW-CMM v1.1 CMMI
Defect prevention Causal Analysis and
Resolution Technology change mgmt Org. Process
Technology Innovation Process change mgmt Process
Innovation Deployment Quantitative process
mgmt Org. Process Performance Software quality
mgmt Quantitative Mgmt of Quality
Process Organization process focus Organization
process focus Organization process definition
Organization process definition Training
program Organizational training Integrated
software mgmt Integrated project management Risk
Management Software product engr Customer and
Product Reqmts Technical Solution Product
Integration Intergroup coordination Product
Verification Peer reviews Validation Decision
Analysis and Resolution Requirements
management Requirements management Software
project planning Project planning Software
project tracking oversight Project Monitoring
and Control Software subcontract mgmt Supplier
Agreement Management Software quality
assurance Process Product Quality Assurance
Software configuration mgmt Configuration
Management Data Management Measurement and
Analysis
LEVEL 5 OPTIMIZING
LEVEL 4 MANAGED
LEVEL 3 DEFINED
LEVEL 2 REPEATABLE
46
Software Product EngineeringSW-CMM v1.1
Activities
  • 1 Appropriate software engineering methods and
    tools are integrated into the project's defined
    software process.
  • 2 The software requirements are developed,
    maintained, documented, and verified by
    systematically analyzing the allocated
    requirements according to the project's defined
    software process.
  • 3 The software design is developed, maintained,
    documented, and verified, according to the
    project's defined software process, to
    accommodate the software requirements and to form
    the framework for coding.
  • 4 The software code is developed, maintained,
    documented, and verified, according to the
    project's defined software process, to implement
    the software requirements and software design.
  • 5 Software testing is performed according to the
    project's defined software process.

Customer and Product Req PA
Technical Solution PA
Product Verification PA
47
Software Product EngineeringSW-CMM v1.1
Activities (continued)
  • 6 Integration testing of the software is planned
    and performed according to the project's defined
    software process.
  • 7 System and acceptance testing of the software
    are planned and performed to demonstrate that the
    software satisfies its requirements.
  • 8 The documentation that will be used to operate
    and maintain the software is developed and
    maintained according to the project's defined
    software process.
  • 9 Data on defects identified in peer reviews and
    testing are collected and analyzed according to
    the project's defined software process.
  • 10 Consistency is maintained across software work
    products, including the software plans, process
    descriptions, allocated requirements, software
    requirements, software design, code, test plans,
    and test procedures.

Product Integration PA
Product Verification PA
Validation PA
CMMI 47
48
Common Feature Comparison
Handled by the Measurement and Analysis PA
49
Conclusions
  • Organizations using SW-CMM v1.1 should be able to
    smoothly transition to CMMI, accommodating the
    following changes
  • Measurement and Analysis Data Mgmt at L2
  • Risk Management Decision Analysis and
    Resolution at L3
  • Expansion of Software Product Engineering
  • Configuration Management for all Process Areas

50
Comparing CMMI-SE/SW to EIA IS 731-SECM
  • Objectives
  • Background
  • Process Area Comparison
  • Planned IPPD Extensions

51
Background
  • EIA 731 was created as a merger of the SE-CMM and
    INCOSE SECM models
  • Used as a source model for CMMI
  • CMMI-SE/SW merges software ideas
  • Staged representation of SE available
  • Continuous representation with equivalent
    staging

52
Comparison of Elements
SE-CMM
CMMI
SECM
Engineering
Engineering
Technical
PA06 Understand Customer Needs and
Expectations PA02 Derive and Allocate
Requirements PA03 Evolve System
Architecture PA01 Analyze Candidate Solutions
PA05 Integrate System PA07 Verify and
Validate System PA04 Integrate Disciplines
1.1 Define Stakeholder and System Level
Requirements 1.2 Define Technical
Requirements 1.3 Define Solution 1.4 Assess and
Select 1.5 Integrate System 1.6 Verify System 1.7
Validate System
Reqs Management Customer and Product
Reqs Technical Solution Product
Integration Product Verification Validation
Support
2.3
53
Comparison of Elements (contd)
SE-CMM
SECM
CMMI
Project Management
Management
Project
Project Planning Project Mon and Ctl Supplier
Agree Mgt Integrated Proj Mgt Risk Management
PA12 Plan Technical Effort PA11 Monitor and
Control Technical Effort PA10 Manage Risk PA09
Manage Configurations PA08 Ensure Quality
2.1 Plan and Organize 2.2 Monitor and Control
2.3 Integrate Disciplines 2.4 Coordinate with
Suppliers 2.5 Manage Risk 2.6 Manage Data 2.7
Manage Configurations 2.8 Ensure Quality
PA04
Support
PA18
Configuration Mgt Data Management Proc and Prod
QA Meas and Analysis Decision An and Resolution

L2 GP
1.4

Not in SE-CMM
54
Comparison of Elements (contd)
SE-CMM
SECM
CMMI
Environment
Organization
Process Management
PA13 Define Organizations SE Process PA14 Improve
Organizations SE Process PA17 Provide Ongoing
Knowledge and Skills PA15 Manage Product Line
Evolution PA16 Manage SE Support
Environment PA18 Coordinate With Suppliers
3.1 Define and Improve the SE Process 3.2 Manage
Competency 3.3 Manage Technology 3.4 Manage SE
Support Environment
Org Process Focus Org Process Def Organizational
Tng Quant Mgt of Quality and Process Org Process
Perf Causal An and Res Org Process Tech
Innovation Process Innovation Deployment
L4 GP
L4 GP
L5 GP
2.4
55
Conclusions
  • EIA 731 users should be able to smoothly
    transition to the CMMI-SE/SW model
  • Continuous representation ( equivalent staged
    representation)
  • Some lower level differences
  • Integrated Product and Process Development (IPPD)
    will be added
  • Based on IPD-CMM and other practices

56
Summary - Inherited Features from Source Models
  • SW CMM
  • Goals normative
  • Informative material in Vol II
  • 731
  • Practices/activities mapped to Goals
  • Advanced practices (technical PAs only)
  • Added practices to goals as levels increase
  • Generic Attributes (optional in pilots)
  • Effectiveness of processes
  • Value of products

57
Assessment Methodology
  • Objectives
  • Assessment approach
  • Assessment Requirements for CMMI (ARC)
  • SCAMPI assessment method
  • Lead Assessor program, transition plan

58
Assessment Methods
  • CBA IPI Method
  • Rating of goals
  • Single digit rating
  • Full goal satisfaction
  • More strict data validation requirement
  • SECM Method
  • Rating of practices
  • Granularity options
  • Partial credit options
  • Less strict data validation requirement

Essentially the same activities in the two methods
59
Assessment Requirements for CMMI (ARC)
  • Similar to the current CMM Appraisal Framework
    (CAF) V1.0
  • Specifies the minimum requirements for full,
    comprehensive assessment methods, e.g., SCAMPI
  • Other assessment methods may be defined for
    situations not requiring a comprehensive
    assessment
  • initial assessment, quick-look, process
    improvement monitoring, etc.

60
Standard CMMI Assessment Method for Process
Improvement (SCAMPI)
  • Similar to CBA IPI method
  • Led by authorized Lead Assessor
  • Tailorable to organization and model scope
  • Artifacts
  • SCAMPI Method description document
  • Maturity questionnaire, work aids, templates
  • Current activities
  • Merger of SECM appraisal method features

61
CMMI Lead Assessor Program
  • Similar to existing SEI Lead Assessorand Lead
    Evaluator programs
  • Grandfather current Lead Assessors
  • Under consideration
  • Delineate by discipline, e.g., SW Lead Assessors,
    SE Lead Assessors?
  • Details of transition process for current Lead
    Assessors and other assessment leaders
  • Required training in CMMI models

62
Comment Process
  • Release CMMI-SE/SW v0.2 August 31
  • Available at http//www.sei.cmu.edu
  • Public comments due November 30
  • Release CMMI-SE/SW/IPPD December 1
  • Comments due February 28
  • Hold Focus Group discussions
  • SEI Transition
  • Assessors for both communities
  • SPINs

63
Pilot Assessments
  • Nine initial assessments (desired)
  • Supported by 3 Product Development Team (PDT)
    members,
  • Covering all CMMI models, staged and continuous
    representations
  • Product Development Team (PDT) member roles
  • CMMI Product Suite Training
  • Coaching and structured observation
  • Structured feedback from assessment participants
  • Assessors and Sponsors, and
  • Participating organization members

64
CMMI Transition Plan
  • Development Phase
  • Development of CMMI products
  • Verification and Validation of CMMI products
  • Transition Phase
  • Approval of a CMMI Product for public release
  • Evidence of sufficient use
  • Transition planning to help organizations use
    CMMI products
  • Sustainment Phase
  • Upkeep continuous improvement of the product
    suite
  • Additional evidence of adoption and use

Sustainment Phase
Transition Phase
Development Phase
65
Transitioning to Use of CMMI
  • Understand how models are used
  • Steps to enterprise-wide process improvement
  • Apply Lessons Learned in transitioning from
    single-discipline models
  • Federal Aviation Administrations experiences
    with iCMM
  • US Air Force experiences with transitioning
    between models
  • Others
  • Perform gap analysis between current processes
    and CMMI

66
Steps to Enterprise-wide Organizational Maturity
1. Vision, Goals, Buy-in
67
CMMI Benefits
  • CMMI product users can expect to
  • Efficiently and effectively improve and assess
    multiple disciplines across their organization
  • Reduce costs (including training) associated with
    improving and assessing processes
  • Deploy a common, integrated vision of process
    improvement that can be used as a basis for
    enterprise-wide process improvement efforts.

68
The promise...
  • CMMI team is working to assure the CMMI Product
    Suite addresses needs of software and systems
    engineering communities of practice
  • Use of an integrated model to guide enterprise
    process improvement promises to be one of the
    more sustainable profitable initiatives that
    any organization might pursue

69
Current Status
  • CMMI project is on schedule.
  • Initial comments on Release V0.2 are very
    positive.
  • Development of Training and Assessment
    Methodology has begun-
  • First Pilot Training conducted Sept 1999 (see
    quote)
  • Training will be conducted each quarter
  • Opportunity still exists to participate in CMMI
    Product Development
  • Model Updates based on Change Requests
  • IPPD
  • Assessment Methodology
  • Training Development
  • Call Bob Rassa, (310) 334-0764,
    RCRassa_at_west.raytheon.com

70
CMMI Steering Group
  • Phil Babel, USAF -retiring Dec 30 (Ajmel Dulai,
    replacement) - Chair
  • Bob Rassa, Raytheon - Deputy Chair
  • Tom Parry, OSD
  • Clyde Chittister, SEI
  • Bill Peterson, SEI
  • Bob Lentz, General Dynamics
  • Hal Wilson, Litton-PRC
  • Joan Weszka, Lockheed Martin
  • Mike Devine, USA
  • Dave McConnell, USN
  • Linda Ibrahim, FAA
  • Motorola Representative (for commercial industry)

71
And finally, a few statistics---
Product PAs/FAs Goals/Themes
Activities/Practices SW-CMM V1.1 18 52 150 SW-C
MM V2c 19 62 127 EIA/IS 731 19 77 381 CMMI
V0.1 27 149 324 CMMI V0.2 24 57 196
72
And Food For Thought
  • SW-CMM and EIA/IS-731 will be sunset 2 years
    after final release of CMMI (now scheduled for
    August 2000)
  • Time to start planning for CMMI!
  • CMMI Training Courses have begun at the SEI
  • 1st one conducted November 1999
  • Scheduled quarterly through 2000
  • There is still room on the Development Team
  • CMMI will transition to Sustainment Mode after
    Summer 2000
  • SEI providing User Support as they did for SW-CMM
  • We are expanding the ranks of Transition
    Partners
  • Seven (7) used on SW-CMM, many more for CMMI

73
Quote from Pilot Training attendee
  • There is a lot more positive than negative in
    this model. We dont need to wait 2-3 years to
    adopt. There is an amazing amount of value. Just
    the added scope is great. We mapped different
    models against the organizations processes.
    SW-CMM covers 1/3 of it. SE covers 75 and IPPD
    85. The difference in scope is amazing. We need
    to endorse this model. What we say is what will
    happen.