USTRANSCOM JPO - PowerPoint PPT Presentation

1 / 25
About This Presentation
Title:

USTRANSCOM JPO

Description:

CRANE. CALM. Tanker - Overview. New ... 2 Workboats, 1 Dive Boat Twin Cranes provide deployment. redundancy ... Twin Cranes do not provide redundancy ... – PowerPoint PPT presentation

Number of Views:87
Avg rating:3.0/5.0
Slides: 26
Provided by: ltcca
Category:
Tags: jpo | ustranscom

less

Transcript and Presenter's Notes

Title: USTRANSCOM JPO


1
LTC CARLSON OPDS Future22 OCT, 2002
2
Afloat Prepositioning Considerations
3
Purpose of NAVSEA Study
  • Provide cost estimate of probable system(s) for
    POM 04 budget submittal
  • Study may not identify the best system but will
    illuminate important key criteria and significant
    cost drivers
  • Provide decision makers (N42) insight as to the
    important critical decision factors,
    alternatives, and costs

4
OPDS Vessel Platform Selections
  • CURRENT SYSTEM
  • Existing Tankers
  • CONVERSION CANDIDATES
  • T-AO 187 Oiler
  • NEW CONSTRUCTION CANDIDATES
  • Tanker
  • Articulated Tug / Barge (ATB)
  • Supply Boat / Special Mission Ship
  • Lift Boat / Jack-up (w/ Lift Ship)
  • Barge Shuttle System (w/ Lift Ship)
  • Beach-Deployed - Tug Barge System (w/ Lift
    Ship)

5
Existing Tanker - Overview
  • Existing Assets, configured as needed
  • Large Tankers (270K-330K barrels)
  • Point-to-Point Transport Utility
  • Single Hull w/ Steam Plants
  • SALM effective, but difficult to deploy and
    retrieve

6
SS Chesapeake Particulars
  • Overall Length - 736 ft
  • Beam - 102 feet
  • Draft - 40 feet
  • Speed - 14 knots
  • Displacement - 61,970 long tons
  • Cargo Capacity- 278,000 barrels
  • Civilian Crew - 33 (Licensed, 11 / Unlicensed,
    22)
  • Built by Bethlehem Steel Corp., Sparrows Point,
    MD, 1964
  • Entered the RRFJuly 20, 1991

7
Existing Ships System Schematic
Resupply alongside from midship manifold
OPDS Tanker
SALM
BTU
Workboat (5)
Buoy
Resupply
Resupply Tanker
Hose
Supply Conduit
(single line)
SALM
  • SS Chesapeake Specs
  • Length 736 feet
  • Beam 102 feet
  • Draft 40 feet
  • Displacement 61,970 long tons
  • Speed 15 knots
  • Area Command ROS status
  • Crew Civilian - 33 Military 145
  • Cargo Tank Capacity 278,000 BBLS

8
T-AO 187 Kaiser Class - Overview
  • Modern Twin Screw Medium-Speed Diesel Plant
  • Concept crewed by Merchant Mariners (including
    Beach Crew)
  • Sunk Cost for Vessel Platform
  • Available ships are single hulled
  • Pumping Systems already onboard
  • Would provide point-to-pointtankage
  • Number of ships available maybe insufficient for
    OPDS needs
  • Service Life Limited, 10 yrs old
  • 180,000 BBLS
  • CALM anchoring
  • 2 Workboats, 1 Dive Boat,1 Tug

9
T-AO 187 Kaiser Class System Schematic
Converted Tanker
Supply Conduit
(single line)
BTU
2 Workboats, 1 Dive Boat, 1 Tug
CALM
Resupply
Resupply Tanker
Hose
Supply Conduit
Anchor Leg
(single line)
(typ)
  • Kaiser Class Particulars
  • Length 677.5 feet
  • Beam 97.5 feet
  • Draft 35 feet
  • Displacement 40,700 long tons
  • Speed 20.0 knots
  • Manning Civilian 81, Military 23
  • Cargo Tank Capacity 180,000 BBLS

CRANE
CALM
10
Tanker - Overview
  • New construction Double Hull Tanker
  • Largest (not longest) vessel explored
  • Point to Point Transport Utility
  • 700 ft LOA, 100 ft beam, 35 ft draft
  • 40,000 LT displacement
  • 300,000 BBLS
  • CALM anchoring
  • 2 Workboats, 1 Dive Boat, 1 Tug
  • Twin Cranes provide deploymentredundancy

11
Tanker System Schematic
New Ship with Tankage
Supply Conduit
(single line)
BTU
2 Workboats, 1 Dive Boat, 1 Tug
CALM
Resupply
Resupply Tanker
Hose
Supply Conduit
Anchor Leg
(single line)
(typ)
  • New Tanker Particulars
  • Length 700 feet
  • Beam 100 feet
  • Draft 35 feet
  • Displacement 40,000 long tons
  • Speed 14.0 knots
  • Manning Civilian 85
  • Cargo Tank Capacity 300,000 BBLS

12
Articulated Tug/Barge - Overview
  • ATB (Articulated Tug/Barge)
  • New construction Double Hull Barge
  • Longest vessel explored
  • Point to Point Transport Utility
  • Provides 12,000 HP Tug for JLOTS
  • 900 ft LOA, 100 ft Beam, 15 foot draft
  • 30,000 LT displacement
  • 200,000 BBLS
  • CALM anchoring
  • 2 Workboats, 1 Dive Boat Twin Cranes provide
    deploymentredundancy

13
Articulated Tug/Barge System Schematic
Articulated
Tug/Barge
Supply Conduit
2 Workboats, 1 Dive Boat (Sep Tug not needed)
(single line)
BTU
CALM
Resupply Tanker
Resupply
Hose
Supply Conduit
Anchor Leg
(single line)
(typ)
  • ATB Particulars
  • Length 900 feet
  • Beam 100 feet
  • Draft 15 feet
  • Displacement 30,000 long tons
  • Speed 14.0 knots
  • Manning Civilian 75
  • Cargo Tank Capacity 200,000 BBLS

14
Supply / Special Mission Ship - Overview
  • Offshore Supply Boat Construction
  • Shortest / Smallest Vessel Explored
  • No onboard tankage for transport
  • 400 ft LOA, 100 ft Beam, 30 foot draft
  • 15,000 LT displacement
  • CALM anchoring
  • 2 Workboats, 1 Dive Boat, 1 Tug
  • Similar to TAO, Tanker, and ITB,
  • but eliminates tank stowage, so less useful but
    also less life cycle maintenance and low
    acquisition cost

15
Supply / Special Mission Ship System Schematic
New Ship without Tankage
BTU
Supply Conduit
2 Workboats, 1 Dive Boat, 1 Tug
CALM
(single line)
Pump
Supply Tanker
Supply
Hose
Supply Conduit
(single line)
Anchor Leg
(typ)
  • Supply Boat Particulars
  • Length 400 feet
  • Beam 100 feet
  • Draft 30 feet
  • Displacement 15,000 long tons
  • Speed 14.0 knots
  • Manning Civilian 83

16
Lift Boat / Jack-up Pumping Station - Overview
  • Lift Boat / Heavy Lift Ship System
  • 140 ft x 80 ft x 12 ft Lift Boat carriedby 615
    ft x 105 ft x 20 ft Heavy Lift Ship
  • Provides most stable operational platform
  • 10,000 BBLS on Lift Boat
  • CALM anchoring
  • 3 Workboats, 1 Dive Boat, 1 Tug
  • Twin Cranes do not provide redundancy
  • Very Safe OPDS Operational Command Post but needs
    large number of components

17
Jack-up Ship System Schematic
Supply Tanker
Jack-up Ship
Supply Conduit
Supply
Hose
(single line)
BTU
2 Workboats, 1 Dive Boat, 1 Tug
Supply Conduit
CALM
(single line)
Pump
  • Jack-up Transport Ship Specs
  • Length 615 feet
  • Beam 105 feet
  • Draft 20 feet
  • Displacement 20,000 long tons
  • Manning Civilian 95
  • Cargo Tank Capacity 10,000 BBLS

18
Shuttle Tank Barges - Overview
  • Tug Barge / Heavy Lift System
  • Two 1500-HP 86-LOA Tractor Tugs Two 200 ft x
    40 ft x 8 ft Barges carriedby 615 ft x 105 ft x
    20 ft Heavy Lift Ship
  • 10,000 BBLS on Lift Boat plus20,000 BBLS on
    Barges
  • CALM anchoring for Shuttle Ship
  • 3 Workboats, 1 Dive Boat, 2 Tugs
  • Most Number of Components
  • Can pull fuel from alternateanchorages w/o
    moving system
  • In-Stream connections cause environmental hazard

19
Shuttle Tank Barges System Schematic
  • Shuttle Barge Specs
  • Length 200 feet
  • Beam 40 feet
  • Draft 8 feet
  • Displacement 250 long tons

20
Shuttle Tank Barges System Schematic
  • Shuttle Barge Transport Ship Specs
  • Length 615 feet
  • Beam 105 feet
  • Draft 20 feet
  • Displacement 20,000 long tons
  • Manning Civilian 102
  • Cargo Tank Capacity 10,000 BBLS

21
Beach-Deployed System - Overview
  • Offshore Supply Boat Construction
  • Upscale Supply Boat with HoseDeployment from
    Barge vs. Mother Ship
  • Manned entirely by Merchant Mariners
  • No onboard tankage for transport
  • 500 ft LOA, 100 ft Beam, 30 foot draft
  • 20,000 LT displacement
  • CALM anchoring
  • 2 Workboats, 1 Dive Boat, 1 Tug, 1 80
    Deployment Barge
  • Shuttle Barge and Beach Deployed both
    fundamentally change deployment system

22
Beach-Deployed System Schematic
Deployment
Hose deployed
from the beach
Operation
23
Beach-Deployed System Schematic
  • Beach Deployed Specs
  • Length 500 feet
  • Beam 100 feet
  • Draft 30 feet
  • Displacement 20,000 LT
  • Speed 14
  • Crew Civilian 63
  • Cargo Tank Capacity None

24
Recommendations
  • Study Goal Budget Estimate --Keep existing POM
    figure of 140M per platform
  • Complete OPDS 2001 ORD
  • Deployment and Terminal Focused RD
  • Formulate Acquisition Strategy for Early Industry
    Involvement gtgt Capitalize on Industry Knowledge
  • Discuss Entire Littoral Warfare Plans with CINCs
    for Possible Littoral Support Ship (Lighterage,
    Causeways, and OPDS etc. SS3 driven)

25
OPDS Issues
  • Emerging Army Requirements
  • 2001 ORD
  • Final OPDS Platform
  • Funding
  • Training
  • Doctrine
Write a Comment
User Comments (0)
About PowerShow.com