Title: Asphalt-Rubber Systems
1Asphalt-Rubber Systems
Types and Uses
2Types
SAM Stress Absorbing Membrane SAMI Stress
Absorbing Membrane Interlayer ARC - DG Asphalt
Rubber Concrete Dense Graded ARC - GG Asphalt
Rubber Concrete Gap Graded ARC - OG Asphalt
Rubber Concrete Open Graded
3SAM - Stress Absorbing Membrane
Pre-existing Pavement
Aka. Chip seal or seal coat
4SAMI - Stress Absorbing Membrane Interlayer
Pre-existing Pavement
AC or ARC Overlay
Also known as a Two Layer System, or an
under-layer.
5SAMI in a three layer system
AC or ARC Overlay
SAMI
Leveling Course
Pre-existing Pavement
6Aggregate Gradation Comparison
Open Graded Gap Graded Dense Graded
7SAM - Where To Use
- Fatigue Cracking
- Little or no cracking
- Satisfactory Ride
8Fatigue Cracking - Townsend Divide
9SAM - Where To Use
- Block Cracking
- generally lt 5 spacing
- seal and fill cracks
- satisfactory ride
10Block Cracking - Ravendale
11SAMI - Where To Use
- Fatigue Cracking
- Ride Improvement Required
- Structural Improvement Required
- Moderate Severity Rutting
- (unless overlay is thick)
12SAMI - Where to Use
- Stabilized Bases
- Improved Ride vs. SAM
- Additional Structural Support
- Swelling Soils
- Reduce Moisture Variation
- Entire Width of Roadbed
13Sami in Northern, AZ
14Block Cracking
15OVERLAY .5 ACFC
1.5 AC MEMBRANE
2.75 AC AZ-MO
LEVELING
ASPHALT RUBBER MEMBRANE
CUT SECTION
16OVERLAY .5 ACFC 1.5 AC
MEMBRANE
2.75 AC AZ-MO
LEVELING
ASPHALT RUBBER MEMBRANE
FILL SECTION
17(No Transcript)
183 Layer System
- Rough or Faulted Pavements
- Reflective Cracking Stresses are High
- Very Effective on PCC Pavement
19Water Pumping Through Cracks I-40
20Open Graded ARC
- Top Course
- Rehabilitation or New Construction
- Improve Friction (Especially in Wet
- Weather)
- 2 or 3 Layer Systems
- 1 to 1-1/2 Over PCCP
- Flushed or Bleeding Pavement with
- Low Rutting
21I-19 OG Overlay Placed 1988 Valencia Rd Exit
22I-19 OG Overlay Placed 1988 Valencia Rd
Exit Photo taken 03/00
23I-40 Cracked PCCP Flagstaff, AZ 1989
24I-40, 1998 4 Conventional AC (left) 2 AR OGFC
over 2 ARC GG (right) after 8 years service
25AR-OGFC on PCCP, I-17 Phx, AZ Aug 2000
26AR-OGFC on PCCP, I-17 Phx, AZ Aug 2000
27Gap Graded ARC
- Almost Any Cracked Pavement
- Additional Structure is Required
- Top Lift in 2 or 3 Layer Systems
- Bottom Lift in 3 Layer Systems
28Gap Graded Overlay
29Gap Graded Overlay
30Open Graded 1 and 1.5 Gap Graded Overlay US 70
Tennessee
31I40 Open Graded 0.75 over PCCP Cores
32Dense Graded ARC
- New Construction
- Thick Overlay for Structure is Required
33Possum Modified AC