Osprey International Presentation - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

Osprey International Presentation

Description:

Osprey International Presentation. Presentation Overview: System Design. Typical Project ... Why Osprey. System Design. Site Visit. Geotechnical Report ... – PowerPoint PPT presentation

Number of Views:34
Avg rating:3.0/5.0
Slides: 15
Provided by: HTSI
Category:

less

Transcript and Presenter's Notes

Title: Osprey International Presentation


1
(No Transcript)
2
Osprey International Presentation
  • Presentation Overview
  • System Design
  • Typical Project
  • Professional Services
  • Construction Activities
  • Budget Variables
  • Why Osprey

3
System Design
  • Site Visit
  • Geotechnical Report
  • Loading Analysis
  • Application Requirements
  • Frequency Coordination
  • Path Analysis
  • Construction Documents

4
Sample AERIE System Package
  • 60-foot monopole
  • Complete Camera Package
  • Complete Communications Package
  • Control Center or Remote Configuration
  • Coverage map

5
Typical 60-foot Monopole
  • Aerie II Galvanized Capsule
  • Headframe with cover
  • Winch and Cable
  • Drive Motor
  • Equipment Boxes

6
Complete Camera Package (example)
  • 2 Combination video/infrared cameras
  • 2 pan/tilt heads
  • 4 channel DVR
  • Router
  • Heat Exchanger

7
Complete CommunicationsPackage (example)
  • 2 spread spectrum microwave radios
  • AC/DC Converter

8
Control Center or Remote Site?
  • Placement of pre-fabricated building
  • Control center could be co-located in close
    proximity to AERIE
  • Remote Configuration Command and Control
    functions accessible from distant control center
    or from a vehicle at the site

9
Professional Services
  • Project Management
  • Pre-construction engineering
  • Geotechnical investigation
  • NEPA survey
  • Permitting
  • As-built package

10
Construction Activities
  • Construction management
  • Foundation installation
  • Steel erection
  • Camera equipment installation
  • Communication equipment installation
  • Site utility installation and coordination

11
Budget Variables
  • Electronic Package
  • Communication Equipment
  • Surveillance Equipment
  • Lighting Signaling
  • Message Boards
  • Public Address Systems
  • Other?
  • Foundation Design
  • Soil Conditions
  • Drilled Foundation
  • Spread Footing
  • Current Raw Material Prices
  • Local Considerations

12
Why Osprey?
  • System is scaleable
  • System is upgradeable
  • Life-Cycle cost savings
  • Safety
  • Enhanced Communications
  • Electric power is upgradeable
  • Complete design/build turnkey system

13
(No Transcript)
14
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com