Quality AssuranceQuality Control QAQC - PowerPoint PPT Presentation

1 / 36
About This Presentation
Title:

Quality AssuranceQuality Control QAQC

Description:

Quality Assurance/Quality Control (QA/QC) Tom Hare. DJ Environmental. Cody/Powell WY ... Independent onsite monitoring of all environmental aspects of a large ... – PowerPoint PPT presentation

Number of Views:29
Avg rating:3.0/5.0
Slides: 37
Provided by: blm
Category:

less

Transcript and Presenter's Notes

Title: Quality AssuranceQuality Control QAQC


1
Quality Assurance/Quality Control (QA/QC)
  • Tom Hare
  • DJ Environmental
  • Cody/Powell WY

2
QA/QC Includes
  • Independent onsite monitoring of all
    environmental aspects of a large 3D project
  • Completion of a full monitoring report with
    permanent photo monitoring plots for future
    impact analysis
  • Proof of actual impacts during, immediately
    after, and one year later
  • Third party independence

3
BLM Reasons for QA/QC
  • BLM has less and less ability to monitor and
    perform compliance
  • BLM is unlikely to follow up on long term
    monitoring
  • QA/QC monitoring can provide 100 compliance,
    monitoring documentation, and superior mitigation
  • No additional cost to the BLM

4
Industry Benefits of QA/QC
  • Assurance of 100 compliance to BLM permit
    requirements
  • Provides immediate in field access to a BLM
    representative (QA/QC monitor) w/less delays and
    immediate resolution of issues
  • Insurance against shut downs, conflicts and
    serious problems
  • Positive BLM views on current and future permits

5
QA/QC Results and BMPs
6
Typical Buggy Drill
7
Typical Impacts
8
Typical Drill Buggy Single Pass
9
Close-up of Drill Buggy Track
10
Heliportable Drill
11
Heliportable Mesa Top Operations
12
Typical Heliportable Drill Disturbance
13
Vibroseis Buggies
14
Close-up of Single Track and Vibrator Imprint
15
Typical Single Pass in Erosive Soils
16
Single vs. Multiple Passes
17
Single ATV Pass
18
Multiple Pass Example
19
Frozen Mancos Clay/Silts
20
Examples of the Findings
21
Snow and Frozen Ground Impacts
22
Minimal Surface Imprints
23
Landscape View
24
Permanent Photo Plots
25
Frozen Ground Impacts to Burrows
26
Insect Burrow Impacts
27
Only Remaining Tracks after 30 Days
28
Unfrozen Soil Imprints
29
Deep Snow and Frozen Ground
30
Drill Buggy on Deep Snow
31
Typical Impacts
32
Vibrator on Deep Snow
33
Typical Vibrator Impacts
34
Overall QA/QC Findings
  • A series of practical and reasonable BMPs were
    discovered and applied as a result of the on
    site QA/QC monitor
  • Work never stopped
  • Changes and modifications were made in the field
    with concurrence with BLM manager
  • Impacts were greatly reduced
  • Independent documentation of impacts (or
    non-impacts) was provided

35
QA/QC Recommendations
  • QA/QC monitor should be standard practice on
    large 3D projects with substantial BLM surface
  • QA/QC can be applied to any project not limited
    to seismic operations
  • QA/QC can also be used on small, but critical
    projects (pipelines, well pads, etc.)
  • Should not be a default for all projects just
    selected projects of special importance
  • A single onsite monitor is all that is needed in
    most projects - multiple monitors create conflict
    and unnecessary costs

36
One Cow Two PassesQuestions?
Write a Comment
User Comments (0)
About PowerShow.com