Title: CORPORATE AUTOMATION PLAN PHASE 2 UPDATE
1CORPORATE AUTOMATION PLAN PHASE 2UPDATE
August 17, 2005
MTAC Washington DC
2CORPORATE AUTOMATION PLAN PHASE 2
CAP PHASE 2 CONTENTS COMPARED TO ORIGINAL CAP
Issued May 2004
3CORPORATE AUTOMATION PLAN PHASE 2
CAP PHASE 2 CONTENTS COMPARED TO ORIGINAL CAP
CAP Phase 2
Original CAP
- Automate Letter Distribution
- Automate Flat Distribution
- Automate Parcel Sorting
- Automate Bundle Processing
- Automate Tray Container Processing
- Longer Term Plans
- Delivery Automation
- Transportation
- Scanning and Tracking
4CORPORATE AUTOMATION PLAN PHASE 2
LETTERS
- AFCS Improvements
- Add OCR Capability
- Upgrade Ink Jet Canceller
- Doubles Detector
5CORPORATE AUTOMATION PLAN PHASE 2
LETTERS
- DIOSS
- OCR Capability
- Sprays Barcodes
- Transmits Images of Non-readable Mail Pieces to
the RCR
6CORPORATE AUTOMATION PLAN PHASE 2
LETTERS
Postal Automated Redirection System
Phase 2 Deployment Should be Completed by Late
2007
282 Plants and 12 Remote Encoding Centers
7CORPORATE AUTOMATION PLAN PHASE 2
FLATS
Postal Automated Redirection System
Deployment TBD
8CORPORATE AUTOMATION PLAN PHASE 2
FLATS
- OPTION 1 Delivery Point Packaging
- Develop a machine that will sequence both
letters and flats in delivery order.
- OPTION 2 Flats Sequencing System
- Develop a machine that will sequence only flats
in delivery order.
9CORPORATE AUTOMATION PLAN PHASE 2
FLATS
- OPTION 2 Flats Sequencing System
- Develop a machine that will sequence only flats
in delivery order.
10CORPORATE AUTOMATION PLAN PHASE 2
FLATS SEQUENCING SYSTEM - TIMELINE
STATUS OF RD EFFORTS 1 Contractor
Completion and Decision Point
Event
11CORPORATE AUTOMATION PLAN PHASE 2
FLATS SEQUENCING SYSTEM
POTENTIAL BENEFITS
- Letters and Flats Sorted Separately
- DPS Letter Sorting Continues
- Flats Sequencing in Delivery Point Order
- Reengineer Our Processes for Handling "Residue
Volumes"
12(No Transcript)
13CORPORATE AUTOMATION PLAN PHASE 2
FLATS SEQUENCING SYSTEM
POTENTIAL CHANGES
- Drop Ship Entry Points Would Change
- CR Presort Eliminated in Automated Zones
- 11-Digit Barcode or ID TAG Required
- Detached Address Labels To Be Determined
- Increased 5-Digit Presort Volume
- Standardized Label Placement
- Rates Reflect Appropriate Savings
14CORPORATE AUTOMATION PLAN PHASE 2
FLATS
AUTOMATED TRAY INDUCTION
15CORPORATE AUTOMATION PLAN PHASE 2
FLATS
AUTOMATED TRAY HANDLING SYSTEM
16CORPORATE AUTOMATION PLAN PHASE 2
PARCELS AND BUNDLES
AUTOMATED PACKAGE PROCESSING SYSTEM
17CORPORATE AUTOMATION PLAN PHASE 2
PARCELS AND BUNDLES
- Automate Bundle Processing
- Optional Endorsement Lines
- Pressure Sensitive Barcoded Labels
- Reduce Sack Usage
- Increase Bundle Integrity and Reduce Bundle
Breakage
18APPS DEPLOYMENT STRATEGY
CORPORATE AUTOMATION PLAN PHASE 2
PARCELS AND BUNDLES
- Align Deployment with Future Network
- Network Package and Bundle Processing Role
- Sort to Destinating RDCs at Origin RDC
- Reduce Network Handlings
- Minimize Transportation Requirements
- Support Local and Destinating Processing Centers
- Sort to 5-Digit or Scheme at Destination
19CORPORATE AUTOMATION PLAN PHASE 2
PARTNERSHIP WITH INDUSTRY
- Mail Presort Requirements Will Change As
Technology Evolves - Industry Participation Is Critical
20CORPORATE AUTOMATION PLAN PHASE 2
PARTNERSHIP WITH INDUSTRY
- Work Together to
- Ensure Lowest Combined Processing Costs
- Explore Innovative Processing Options
- Match Products and Penetration to Automated
Equipment - Establish Lead Times For Changes