CORPORATE AUTOMATION PLAN PHASE 2 UPDATE - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

CORPORATE AUTOMATION PLAN PHASE 2 UPDATE

Description:

Detached Address Labels To Be Determined. Increased 5-Digit Presort Volume ... Pressure Sensitive Barcoded Labels. Reduce Sack Usage ... – PowerPoint PPT presentation

Number of Views:50
Avg rating:3.0/5.0
Slides: 23
Provided by: usp46
Category:

less

Transcript and Presenter's Notes

Title: CORPORATE AUTOMATION PLAN PHASE 2 UPDATE


1
CORPORATE AUTOMATION PLAN PHASE 2UPDATE
August 17, 2005
MTAC Washington DC
2
CORPORATE AUTOMATION PLAN PHASE 2
CAP PHASE 2 CONTENTS COMPARED TO ORIGINAL CAP
Issued May 2004
3
CORPORATE AUTOMATION PLAN PHASE 2
CAP PHASE 2 CONTENTS COMPARED TO ORIGINAL CAP
CAP Phase 2
Original CAP
  • Automate Letter Distribution
  • Automate Flat Distribution
  • Automate Parcel Sorting
  • Automate Bundle Processing
  • Automate Tray Container Processing
  • Longer Term Plans
  • Delivery Automation
  • Transportation
  • Scanning and Tracking

4
CORPORATE AUTOMATION PLAN PHASE 2
LETTERS
  • AFCS Improvements
  • Add OCR Capability
  • Upgrade Ink Jet Canceller
  • Doubles Detector

5
CORPORATE AUTOMATION PLAN PHASE 2
LETTERS
  • DIOSS
  • OCR Capability
  • Sprays Barcodes
  • Transmits Images of Non-readable Mail Pieces to
    the RCR

6
CORPORATE AUTOMATION PLAN PHASE 2
LETTERS
Postal Automated Redirection System
Phase 2 Deployment Should be Completed by Late
2007
282 Plants and 12 Remote Encoding Centers
7
CORPORATE AUTOMATION PLAN PHASE 2
FLATS
Postal Automated Redirection System
Deployment TBD
8
CORPORATE AUTOMATION PLAN PHASE 2
FLATS
  • OPTION 1 Delivery Point Packaging
  • Develop a machine that will sequence both
    letters and flats in delivery order.
  • OPTION 2 Flats Sequencing System
  • Develop a machine that will sequence only flats
    in delivery order.

9
CORPORATE AUTOMATION PLAN PHASE 2
FLATS
  • OPTION 2 Flats Sequencing System
  • Develop a machine that will sequence only flats
    in delivery order.

10
CORPORATE AUTOMATION PLAN PHASE 2
FLATS SEQUENCING SYSTEM - TIMELINE
STATUS OF RD EFFORTS 1 Contractor
Completion and Decision Point
Event
11
CORPORATE AUTOMATION PLAN PHASE 2
FLATS SEQUENCING SYSTEM
POTENTIAL BENEFITS
  • Letters and Flats Sorted Separately
  • DPS Letter Sorting Continues
  • Flats Sequencing in Delivery Point Order
  • Reengineer Our Processes for Handling "Residue
    Volumes"

12
(No Transcript)
13
CORPORATE AUTOMATION PLAN PHASE 2
FLATS SEQUENCING SYSTEM
POTENTIAL CHANGES
  • Drop Ship Entry Points Would Change
  • CR Presort Eliminated in Automated Zones
  • 11-Digit Barcode or ID TAG Required
  • Detached Address Labels To Be Determined
  • Increased 5-Digit Presort Volume
  • Standardized Label Placement
  • Rates Reflect Appropriate Savings

14
CORPORATE AUTOMATION PLAN PHASE 2
FLATS
AUTOMATED TRAY INDUCTION
15
CORPORATE AUTOMATION PLAN PHASE 2
FLATS
AUTOMATED TRAY HANDLING SYSTEM
16
CORPORATE AUTOMATION PLAN PHASE 2
PARCELS AND BUNDLES
AUTOMATED PACKAGE PROCESSING SYSTEM
17
CORPORATE AUTOMATION PLAN PHASE 2
PARCELS AND BUNDLES
  • Automate Bundle Processing
  • Optional Endorsement Lines
  • Pressure Sensitive Barcoded Labels
  • Reduce Sack Usage
  • Increase Bundle Integrity and Reduce Bundle
    Breakage

18
APPS DEPLOYMENT STRATEGY
CORPORATE AUTOMATION PLAN PHASE 2
PARCELS AND BUNDLES
  • Align Deployment with Future Network
  • Network Package and Bundle Processing Role
  • Sort to Destinating RDCs at Origin RDC
  • Reduce Network Handlings
  • Minimize Transportation Requirements
  • Support Local and Destinating Processing Centers
  • Sort to 5-Digit or Scheme at Destination

19
CORPORATE AUTOMATION PLAN PHASE 2
PARTNERSHIP WITH INDUSTRY
  • Mail Presort Requirements Will Change As
    Technology Evolves
  • Industry Participation Is Critical

20
CORPORATE AUTOMATION PLAN PHASE 2
PARTNERSHIP WITH INDUSTRY
  • Work Together to
  • Ensure Lowest Combined Processing Costs
  • Explore Innovative Processing Options
  • Match Products and Penetration to Automated
    Equipment
  • Establish Lead Times For Changes

21
Thank you.
22
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com