Title: EMCal Jet Trigger Status
1EMCal Jet Trigger Status
- Hans Muller/CERN
- Peter Jacobs/LBNL
2Jet Trigger enhancement
- Compare central PbPb to reference measurements
- PbPb peripheral vary system size and shape
- pA cold nuclear matter effects
- pp (14 TeV) no nuclear effects, but different
energy - pp (5.5 TeV) ideal reference, but limited
statistics
All reference systems are required for a complete
systematic study
Includes acceptance, efficiency, dead time,
energy resolution
3Jet trigger in pp
pp in ALICE L 5x1030/cm2/s 200 kHz ALICE DAQ
limits recording to 200 Hz ? L1 rejection
2000-4000 for pp
Chris Anson
Sharp threshold at required L1 rejection
4Jet yields one LHC year
Large gains due to jet trigger Large variation
in statistical reach for different reference
systems
5Jet quenching measurementpPb reference
- With EMCal jet trigger improved jet
reconstruction provides - much greater ET reach
- systematically improved response
6Jet quenching measurementPeripheral PbPb
reference
Without EMCal, significant quenching measurements
beyond 100 GeV are not possible
7PHOS / EMCal readout and trigger
L1 (6 ms) 2x2 tower analog sum ? TRU ? 4x4 tower
peak finder EMCal 12 FEE/GTL bus ? 1232384
towers/TRU configure as 1624 towers ?Dh x
Df0.22 x 0.34
8Cartoon of jet patch trigger
Jet patch trigger
Max aggregate input bandwidth 3 Gbit/s
latency 1-2 ms
lt 100 Mbit/s
100 bits/evt
13K towers 30 TRUs
9First TRU card proto ( PHOS)
10L0 timing simplest algorithm
Pack and ship every bunch crossing (75 bits/TRU?)
11L1 timing simplest algorithm
Just the data transfer takes too long!
Simplest approach no bunch filter at L0
Lumi loss due to pileup ? need local L0?
? Need to filter at TRU1 based on global L0
12Bunch Filter
Level-0 _at_ 1.2 us
9x
- Initially planned major design effort not
required ! - -gt TMU / SMU cards from TRD can do the job
lt- - Major step forward for building JET proto within
1 year
13TMU card (Alice TRD detector , KIP Heidelberg )
14Bunch filter implementation with TMU and SMU
1 optical Output 3.1 Gbit/s
Common LVDS I/O bus
Compact PCI bus 64 bit
SMU
TTC
TMU
Level-0 trigger from TTC _at_ 1200 ns after Bx
L0
FiFo
Transfer selection L0 at 1.2 us, max 200 kHz
Xilinx Virtex-IV
FPGA
Input 11 x 3.1Gbit/s
One SMU /DCS card for n TMU cards ( assume n3)
11 optical inputs ( 1/3rd of TRU) pre-selected
bunch packets from TRU
15SMU concentrator cards with ALICE DCS ethernet
and TTC link ( LHC clock, bunch count, L0,L1)
16TMU/SMU crate for EMCal JET
Need space for 2 Compact PCI crates
TRU
Jet Trigger
out
TTC
Ethernet
1 Gbit fiber output
LVDS communication bus
Water-cooled PS
Rocket I/O fiber connections
SYS
empty
99 Gbit fiber inputs from 33 TRU -gt 9 TMU
17EMCal system overview
Time after Bx
BW
Comment
6000 ns
Level-1 yes/No
Output L1 40 MHz NRZ
V0 (10 Multiplicity bits)
Patch search of JET over V0-defined threshold
TRU
1 GTL branch
Level-1-JET
2000 ns
Input Max 1.35 Gbit/s
CTP
1 optical R/IO link ( 2 spares)
10 x TMU 3 x dcs 1 TRU
L0-triggered forwarding of selected packets
1750 ns
3
3
3 x 3 optical R/IO links
1 TMU Output Max 0.15 Gbit/s
1500 ns
dcs
L0-packets-gtout
L0 lt 200 kHz
TTC
LTC
1200 ns (lev-0)
level-0 selection
DCS, Ethernet
1050 ns
Packet synch -gt FiFo
1 TMU Input 11 x 3.1 Gbit/s
3 x 11
3 x 11
3 x 11
Level-0 3 x Level-1
33 TRU
Xmit 10-bunch Packets 750bit/250 ns 1 link32
TRU channels
33
3 x 3 x 11 optical R/IO links 3.1 Gbit/s
digital
Bunch sync / reset
Trigger-OR
800 ns
Level-0 (600 ns)
1 TRU output Max 9.3 Gbit/s
3
TRU
Bunch Thresh max 2 of 10
320 ns
TRU
3 x Level-1
3x
155 ns
analogue-gtdigital 12 bit
1 TRU Input 96 x 0.48Gbit/s 46 Gbit/s
12
DAQ HLT
12
1 TRU input channel analogue OR of 2x2 towers
22 x RCU 44 branches
22 DDL
RCU
RCU
12 x 8 Analogue Fast OR (100 ns)
150 ns
9 FEE/GTL branch
analogue
396 x FEE
100 ns quad shaper
FEE
FEE
FEE
Ne -gtCSP Steo Voltage
32
36 FEE/SM
4
g -gt Ne conversion
11 Super-Modules
1 Super-Module 12 x 24 Modules
12
g
24
Particle TOF
12672 x APD / CSP / Towers
collision
o
18Jet trigger summary
- Estimated cost SFr 100K-150K
- Relaxed schedule relative to other project
issues - jet trigger effective only for full device and
high lumi - current plans commission late 08
- Technical solutions may be in hand now (thanks to
TRD) - Participating institutions CERN (H. Muller),
LBNL, Grenoble, Nantes, ORNL,