1

VIEWS ON ACCESS REFORM Phil Baker 2 February
2007
2
Priorities
  • Minimise grid access-related barriers to the
    deployment of renewables
  • Maximise the utilisation of network assets, both
    transmission distribution
  • Maintain the reliability integrity of the
    electricity networks

3
Government Targets (1)
  • Likely to require up to 10GW of wind generation
    to meet 2010 target
  • need about 6GW in Scotland?
  • Potential shortfall - could be larger than
    necessary
  • Need to resolve queue issues and ensure that
  • projects able to proceed are allowed to do so
  • access reallocated in time
  • anticipate queue attrition?

4
Government Targets (2)
  • Require around 20GW of connections to meet 2020
    aspiration a significant challenge
  • Need to maximise the utilisation of available
    transmission capacity
  • Can existing arrangements cope?

5
Maximise Use of Available Capacity
  • Work by Centre for DG SE concluded that
  • different technologies drive transmission
    investment differently
  • conventional renewable generation should share
    available transmission capacity
  • Centres work also points to
  • lower transmission charges for wind
  • difficulties with the current arrangements in
    terms of TEC
  • need for additional short term products and
    information to allow increased utilisation of
    available capacity

6
Beyond 2010
  • 20GW of renewable generation implies notional
    plant margin of approx 50
  • Sharing available transmission capacity seems
    inevitable.
  • Existing access methodology (TEC) at odds with
    concept of sharing capacity?
  • Need for mechanisms that allow more generation to
    connect and share access
  • trading mechanisms?
  • administered solution?
  • Whatever we do, need for a transparent process
    that gives confidence to both existing and new
    players

7
Need to Develop Consensus on Way Forward
  • DTI working closely with Ofgem and the GBSO
  • Good to see ARODG in action again
  • Good to see industry coming forward with proposals