Transcript and Presenter's Notes

Title: Housing and Multi-Activity (Advanced)


1
Housing and Multi-Activity (Advanced)
  • Work Write-Ups, Specifications, and Requests for
    Bid

2
Work Write-Ups
  • A document that details individual tasks that
    will be addressed during the course of the Rehab
    project.

3
Work Write-Ups
  • The Work Write-Up will contain
  • A Specification detailing materials to be used.
  • The Method that will be used to install the item.
  • The Quantity of the material required to complete
    the task.
  • An Estimated Cost of the material and labor
    required to complete the task.

4
Work Write-Ups the Specification
  • A Specification describes, in great detail, the
    material and its attributes that will be used in
    the completion of the task.
  • Size or quantity of material required.
  • Composition wood, fiberglass, vinyl, tile,
    linoleum, brick, Hardi-plank, tile, etc.
  • The material attributes color, texture, pattern.
  • Quality or manufacturer name brand (or equal)

5
Work Write-Ups the Specification
  • A Specification describes, in great detail, the
    method of installation that will be used to
    complete the task.
  • Attaching hardware type.
  • Procedures and steps necessary to ensure
    professional results Manufacturers Instructions.

6
Work Write-Ups Standard Units of Measure
  • The Standard Unit of Measure is the basic unit by
    which the material is sold.
  • Square foot sq. ft.
  • Square yard sq. yd.
  • Each ea.
  • Linear foot Lf.
  • Square sq.
  • Gallon gal.

7
Work Write-Ups Unit Cost
  • The Unit Cost is the cost of each standard unit
    of measure.
  • Paint 19.75 per gallon
  • Base board .88 per linear foot
  • Windows 225.00 each
  • Carpet 15.15 per square yard

8
Work Write-Ups Quantity
  • The quantity of materials, described in Units of
    Measure, that will be needed to complete the
    task.
  • 722 sq. ft.
  • 13 sq. yd.
  • 17 each
  • 275 Lf.

9
Work Write-Ups Cost
  • Costs the Unit Cost multiplied by the number of
    units (Standard Units of Measure) required.
  • 12 gal. _at_ 19.75/gal. 237.00
  • 135 Lf. _at_ .88/ Lf. 118.80
  • 9 windows _at_ 225.00 ea. 2025.00
  • 27 sq. yd. _at_ 15.15/yd. 409.05
  • Total 2,789.85

10
Work Write-Ups an example
11
Request for Bids
  • The Request of Bid contains the same information
    as the Work Write-Up
  • EXCEPT
  • The Unit cost and the Total cost

12
Request for Bids
  • Distribute the Request for Bid among as many
    QUALIFIED contractors as possible.
  • Compare your cost estimate to those received from
    your contractors.
  • Select best (not necessarily lowest) bid.
  • Ignore Low Ball bids.
  • Negotiate final cost with selected contractor.

13
Request for Bids - an example
14
Things to Remember
  • Have the homeowner initial each page of the Work
    Write-Up. Explain each item.
  • Include the Request for Bids in the Final
    Contract.
  • Have the home owner and contractor initial each
    page of the Request for Bids as part of the Final
    Contract.
  • Your Anniversary Date and Spouse's birthday.

15
Questions or Comments