Title: Comet Phase Operations Study


1
Comet Phase Operations Study
LOWG8
  • J-F Fronton CNES / SONC
  • MPS, Lindau April 2005

2
Context
  • Over the three identified operation phases
    Descent and First Operations Sequence On
    primary batteries
  • Based on document established in 2001-2004
  • Definition of the Lander First Scientific
    Sequence for the On Comet Phase (J.Biele,
    D.Moura)

3
Approach / Objectives
  • Analysis and modelling on Most of descent first
    sequence (55 hours)- definition of the
    dimensional constraints (inventory,
    classification, constraints clusters,
    validation) - nominal sequence optimisation
    validation vs. science expectations plus
    constraint coverage - proposal of alternative
    sequences - analysis to limits (resource
    mission constraints)- internship Anne Vigne

4
Initial proposed sequence (1)
5
Initial proposed sequence (2)
6
Initial proposed sequence (3)
7
Initial proposed sequence (4)
8
Alternate Comet Operations
  • Possible sequenceSESAME as background (except
    when CONSERT, APXS)

9
Constraints inventory
  • Environmental constraints- comet day / night
    cycles- lander / orbiter visibility- orbiter /
    earth visibility- landing site impact
  • Lander constraints- power / temperature- memory
    management- data processing transmission rates
  • Scientific constraints- incompatibilities
    between experiments- non formal non expressed
    constraints

10
Operations modelling
  • Sequence modelling with Most- taking into
    account the variation of the constraints
    (clusters)- establishment of three case study
    scenario for each phase
  • worst case
  • nominal case
  • best case

11
Remaining activities
  • ActionsFor experiments- constraints
    validation - individual activities description-
    general scenario - general scheduling (Most)-
    instrument modelling (Most)- modelling
    validation (GRM HK data) For subsystems-
    modelling (Most)- modelling validation