Calibration team plans: T0a measurements at Pole - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

Calibration team plans: T0a measurements at Pole

Description:

Calibration team plans: T0/a measurements at Pole. Plans for the ... Surface YAG laser used to generate photons pulses at each OM ... what is meant with laser ... – PowerPoint PPT presentation

Number of Views:24
Avg rating:3.0/5.0
Slides: 9
Provided by: www4T
Category:

less

Transcript and Presenter's Notes

Title: Calibration team plans: T0a measurements at Pole


1
Calibration team plans T0/a measurements at Pole
  • Plans for the next polar seasons

Elisa Bernardini AMANDA/IceCube Meeting Uppsala
October 2004
2
What is meant with laser calibration
  • Surface YAG laser used to generate photons pulses
    at each OM and measure the delay due to the
    (output signal) cable transit time and the
    front-end electronics response and the slewing
    corrections.
  • From measured hit
  • times (wrt a reference
  • channels) and hit
  • amplitues we get a
  • measurement of T0 and
  • a for each OM.

3
what is meant with laser calibration
  • Estimate of the 1pe peak position done off-line,
    from fits to the ADC spectra obtained from
    down-going muon data (amplitude-calibration,
    for the delayed-channels)
  • were done by the laser-calibration teams data
    processing/filtering teams M.Walter
  • will be repeated this year
  • Laser data not appropriate for amplitude
    calibration
  • how many photons injected?
  • promt-channels enter the TWR-DAQ
  • estimate of the 1pe peak were done by the TWR
    teams
  • will be repeated this year
  • X-talk maps and X-talk filter constants are
    extracted from fits to the laser calibration data
    collected for T0 and a measurements
  • data was taken by the laser-calibration teams
    analysis by I.Taboada
  • ? data will be taken this year analysis ?

4
Desired/required for the laser-calibration
  • Before starting data taking
  • The detector should be in its final state (HV,
    thresholds, front-end electronics modules,
    amplifiers gains )
  • SWAMPs replacement, channel debugging,
    HV/amplifier gains/thresholds settings should
    occur prior to starting of laser measurements
  • Data from down-going muons should be available in
    such a configuration (for cross-checks, an
    estimate of the new 1pe-peak values is also
    needed for analysis of laser data)
  • A few hours of stable data taking needed and
    spectra to be analyzed
  • Reference channel for TWR DAQ needs to be set
  • Scripts from TWR team to check status of TWR data
    taking (e.g. ADC and TDC histograms of selected
    channel and reference channel) would be helpful

5
Time schedule and manpower
  • SWAMP/VLF team 76 man-day
  • Calibration team 116
  • E.Bernardini, T.Castermans, S.Schlenstedt,
    M.Walter
  • TWR team 182
  • Overlap 1 and 2 2 persons for each team for 12
    days
  • help fixing all gains
  • check ADC spectra with down-going muon data
  • start T0 calibration as soon as possible, on
    those channels already fixed
  • Overlap 2 and 3 2 persons (cal.) and 1 person
    (TWR) for 9 days
  • further gain adjustments?
  • complete T0 calibration and calibrate eventual
    additional problematic channels with changed
    gains
  • to pass knowledge to TWR team on data taking for
    calibration

6
Time constraints for laser calibration
  • Minimum time needed for data-taking
  • 30 min/OM
  • for about 600 OMs makes 300 hours
  • with two-teams (2 people) this requires 15
    days, at regime (team complete, 20 hours/day,
    detector stable)
  • calibration team (4 people) is complete for 2
    weeks!
  • room for further-adjustments available only in
    collaboration with the SWAMP and TWR teams
  • Define now, which are the requirements for the
    gain adjustments and share the task between the
    three teams

This is the real minimum to allow in parallel
analysis of data to have immediate feed-back of
data quality and check which/if OMs should be
re-measured!!
7
Plan for calibration data taking at Pole
  • Gain adjustments currently planned for strings
    5-10, 14-16,19
  • all affected channels need T0/a calibration
  • SWAMPs will be replaced on strings 1-10
  • all affected channels on strings 1-4 need T0/a
    calibration (no major effect expected )
  • Measurement of the reference channels on the
    other strings (10 OMs)
  • cfr. http//www-zeuthen.desy.de/7Ebernardi/T0cal/
    Laser-T0-2003-2004.html
  • and summary on calibration results _at_ Bartol
    Meeting 2004
  • Data will be taken in a way to allow update of
    the X-talk filter constants (use multi-mode
    fibers/get high-amplitude hits when possible)

8
Following the measurements
  • Preliminary calibration constants for the
    muon-DAQ will be immediately available (analysis
    done at Pole)
  • Muon calibration done _at_ Penn State
  • Comparison with laser data will be done
    immediately after (M.Walter?)
  • TWR time-calibration analysis will be done by TWR
    team
  • Future of the laser calibration?