Title: Babson Green Building a Sustainable Future at Babson College
1Babson Green Building a Sustainable Future at
Babson College
Babson Energy and Environmental Club
2Project Overview
Installation plan for a small, residential scale
(1.8 kW) wind turbine on Babsons campus
- Project proposed to
- Develop relationship with cleantech industry
- Demonstrate commitment to responsible
environmental stewardship - Build support for sustainability initiatives
- Encourage students to pursue alternative energy
business endeavors
Babson Average Wind Speed
Avoided Cost
Project Price Tag
.09 kWh
9,435
4.6 m/s (10.3 mph)
3VAT Analysis
30 Models Identified
12 Being Produced
8 Appropriate
2 Sold in US
0 with MA Installers
4VAT Evaluation
Manufacturer Pac Wind Cleanfield Mariah Power Helix Wind
Model Seahawk 3.5 kW Windspire 2 kW
Power Rating (W) 500 3,500 1,000 2,000
MSRP 2,995 15,000 4,000 8,500
/Watt 5.99 4.29 4.00 4.25
Grid Connect No No Yes Yes
5HAT Evaluation
Manufacturer Proven Bergey Southwest EMS
Model Wt 600 XL.1 Skystream E 15
Power Rating (W) 600 1,000 1,800 35,000
MSRP 3,610 2,950 5,400 80,000
/Watt 6.02 2.95 3.00 2.29
Grid Connect No No Yes Yes
Approximate install cost
6Why Skystream?
- First residential generator with included
inverter - Low cost / Low risk investment
- Energy production in low wind (3.5 m/s cut in)
- Quiet and aesthetically pleasing design
- Innovative design would complement Babsons
educational focus (ABC Boston)
7Project Economics
Skystream Turbine 5,400
35 Monopole Mounting Kit 3,230
Shipping 200
Supplies Hardware Sub Total 300 9,130
Labor (Excavation / Electrical) Labor (Installation) 3,680 1,440
Permits (NE Breeze Estimate) 185
Labor Sub Total Less BEEC Contribution 5,305 (5,000)
Project Total 9,435
8Expected Turbine Output
Energy Contribution at Blank Center
Entrepreneurship Gallery (15-25)
9Expected Turbine Output
Energy Contribution at Blank Center
Entrepreneurship Gallery (40-60)
with considered LED replacement project
10Marketing Capturing Value
- Demonstrate commitment to responsible
environmental stewardship - Build support for sustainability initiatives
- Encourage students to pursue alternative energy
business endeavors - Develop relationship with cleantech industry
11Marketing Audiences
- Internal
- Students
- Administrators
- External
- Cleantech Industry
- Other Campuses
- Academic Publications
Source MTC
12Marketing Campus Integration
- On-Campus Programs
- Admissions Tours
- Orientation
- Back to Babson
13Marketing Turbine Signage
- Three placards at the base of the turbine
- Project history, goals, Fred Hamilton dedication
- How to reduce energy consumption in your everyday
life - Available to communicate current sustainability
initiatives (changeable)
14Marketing Utilizing Media
- Capitalize on Current Media Trends
- Spotlight on sustainability
- Energy independence
- Technology
- Press Global to Local
- NBC
- Business Week
- Boston Globe
- Babson Rising
- Dedication Ceremony
15Delivering Value
- Increase environmental awareness promote
sustainability at Babson - Reduce Babsons operating costs
- Respond to student demand for on-campus
alternative energy and sustainability projects - Achieve strategic objectives outlined by
President Barefoot - Improve Babsons competitive position in a
rapidly expanding, and entrepreneurial industry
16Back-Up Slides
17Next Steps
- 1. Establish a facilities lead
- 2. Engage a contractor/installer
- Choose New England Breeze
- Request for proposals
- 3. Establish review/selection period
- 4. Select contractor/installer
- 5. Obtain soil sample
- 6. Obtain PE-Stamped installation diagram
- 7. Obtain necessary permits (Town of Wellesley)
- 8. Order turbine
- 9. Design and order signage
- 10. Build foundation
- Excavation
- Concrete
- 11. Install turbine and signage
- Operational by March 15th
-
18Recommended Signage
- 24 x 18 x 1/8 Ext. Grade
- High Pressure Laminate
-
- Price includes reduced size proofs
- Art supplied on disk to KVO Industries
specifications - Cost 307.00 / sign
- Total 921.00
19Permitting Regulations
Wellesley Planning Office
- No zoning variances are required for structures
under 45 (Section XX)
Wellesley Building Office
- Construction permit will be required
Wellesley Municipal Light Plant
- No agreements needed
- Will need an electrical diagram and UL
certification before install
20Campus Photo
Potential Installation Sites Suggested by Babson
Facilities Department
Site 1
Site 2
21Zoning Overlay
22Wetland Overlay
23Site 1 Athletic Fields
SITE 1 Athletic Fields
24Site 1 Perspective Shot
25Site 1 Hull Comparison
Hull High School
660 kW Vestas Turbine
Blade Diameter
26Wind Evaluation
Wind Data Source Used
AWS TrueWind
- Coordinate based wind maps of NE
- Babson Avg. Wind Speed 4.6 m/s
Expected Yearly Generation (kWh)
Conservative 2,948 .20 kWh Optimistic 4,194
.14 kWh
Data Provided by New England Breeze