Babson Green Building a Sustainable Future at Babson College - PowerPoint PPT Presentation

1 / 26
About This Presentation
Title:

Babson Green Building a Sustainable Future at Babson College

Description:

Babson Green Building a Sustainable Future at Babson College – PowerPoint PPT presentation

Number of Views:106
Avg rating:3.0/5.0
Slides: 27
Provided by: erics49
Category:

less

Transcript and Presenter's Notes

Title: Babson Green Building a Sustainable Future at Babson College


1
Babson Green Building a Sustainable Future at
Babson College
Babson Energy and Environmental Club
2
Project Overview
Installation plan for a small, residential scale
(1.8 kW) wind turbine on Babsons campus
  • Project proposed to
  • Develop relationship with cleantech industry
  • Demonstrate commitment to responsible
    environmental stewardship
  • Build support for sustainability initiatives
  • Encourage students to pursue alternative energy
    business endeavors

Babson Average Wind Speed
Avoided Cost
Project Price Tag
.09 kWh
9,435
4.6 m/s (10.3 mph)
3
VAT Analysis
30 Models Identified
12 Being Produced
8 Appropriate
2 Sold in US
0 with MA Installers
4
VAT Evaluation
Manufacturer Pac Wind Cleanfield Mariah Power Helix Wind
Model Seahawk 3.5 kW Windspire 2 kW
Power Rating (W) 500 3,500 1,000 2,000
MSRP 2,995 15,000 4,000 8,500
/Watt 5.99 4.29 4.00 4.25
Grid Connect No No Yes Yes
5
HAT Evaluation
Manufacturer Proven Bergey Southwest EMS
Model Wt 600 XL.1 Skystream E 15
Power Rating (W) 600 1,000 1,800 35,000
MSRP 3,610 2,950 5,400 80,000
/Watt 6.02 2.95 3.00 2.29
Grid Connect No No Yes Yes
Approximate install cost
6
Why Skystream?
  • First residential generator with included
    inverter
  • Low cost / Low risk investment
  • Energy production in low wind (3.5 m/s cut in)
  • Quiet and aesthetically pleasing design
  • Innovative design would complement Babsons
    educational focus (ABC Boston)

7
Project Economics
Skystream Turbine 5,400
35 Monopole Mounting Kit 3,230
Shipping 200
Supplies Hardware Sub Total 300 9,130

Labor (Excavation / Electrical) Labor (Installation) 3,680 1,440
Permits (NE Breeze Estimate) 185
Labor Sub Total Less BEEC Contribution 5,305 (5,000)

Project Total 9,435
8
Expected Turbine Output
Energy Contribution at Blank Center
Entrepreneurship Gallery (15-25)
9
Expected Turbine Output
Energy Contribution at Blank Center
Entrepreneurship Gallery (40-60)
with considered LED replacement project
10
Marketing Capturing Value
  • Demonstrate commitment to responsible
    environmental stewardship
  • Build support for sustainability initiatives
  • Encourage students to pursue alternative energy
    business endeavors
  • Develop relationship with cleantech industry

11
Marketing Audiences
  • Internal
  • Students
  • Administrators
  • External
  • Cleantech Industry
  • Other Campuses
  • Academic Publications

Source MTC
12
Marketing Campus Integration
  • On-Campus Programs
  • Admissions Tours
  • Orientation
  • Back to Babson

13
Marketing Turbine Signage
  • Three placards at the base of the turbine
  • Project history, goals, Fred Hamilton dedication
  • How to reduce energy consumption in your everyday
    life
  • Available to communicate current sustainability
    initiatives (changeable)

14
Marketing Utilizing Media
  • Capitalize on Current Media Trends
  • Spotlight on sustainability
  • Energy independence
  • Technology
  • Press Global to Local
  • NBC
  • Business Week
  • Boston Globe
  • Babson Rising
  • Dedication Ceremony

15
Delivering Value
  • Increase environmental awareness promote
    sustainability at Babson
  • Reduce Babsons operating costs
  • Respond to student demand for on-campus
    alternative energy and sustainability projects
  • Achieve strategic objectives outlined by
    President Barefoot
  • Improve Babsons competitive position in a
    rapidly expanding, and entrepreneurial industry

16
Back-Up Slides
17
Next Steps
  • 1. Establish a facilities lead
  • 2. Engage a contractor/installer
  • Choose New England Breeze
  • Request for proposals
  • 3. Establish review/selection period
  • 4. Select contractor/installer
  • 5. Obtain soil sample
  • 6. Obtain PE-Stamped installation diagram
  • 7. Obtain necessary permits (Town of Wellesley)
  • 8. Order turbine
  • 9. Design and order signage
  • 10. Build foundation
  • Excavation
  • Concrete
  • 11. Install turbine and signage
  • Operational by March 15th

18
Recommended Signage
  • 24 x 18 x 1/8 Ext. Grade
  • High Pressure Laminate
  • Price includes reduced size proofs
  • Art supplied on disk to KVO Industries
    specifications
  • Cost 307.00 / sign
  • Total 921.00

19
Permitting Regulations
Wellesley Planning Office
  • No zoning variances are required for structures
    under 45 (Section XX)

Wellesley Building Office
  • Construction permit will be required

Wellesley Municipal Light Plant
  • No agreements needed
  • Will need an electrical diagram and UL
    certification before install

20
Campus Photo
Potential Installation Sites Suggested by Babson
Facilities Department
Site 1
Site 2
21
Zoning Overlay
22
Wetland Overlay
23
Site 1 Athletic Fields
SITE 1 Athletic Fields
24
Site 1 Perspective Shot
25
Site 1 Hull Comparison
Hull High School
660 kW Vestas Turbine
Blade Diameter
26
Wind Evaluation
Wind Data Source Used
AWS TrueWind
  • Coordinate based wind maps of NE
  • Babson Avg. Wind Speed 4.6 m/s

Expected Yearly Generation (kWh)
Conservative 2,948 .20 kWh Optimistic 4,194
.14 kWh
Data Provided by New England Breeze
Write a Comment
User Comments (0)
About PowerShow.com