Title: Nelson
1Parks and Recreation Division Strategic Planning
Update
Presented by Paul N. Curtis
2Timetable
- Step 1 Analysis/Assessment of the Vision 2020
Plan and the Waterways Commission Strategic Plan
(2000-2005) November, 2007 - Step 2 Conduct Workshops with PRD Districts and
interact with Department EcoTeams to introduce
them to the effort and process and to gain their
input. Perform SCOT Analysis of V2020, MSWC
Plan, and PRD as an agency January April,
2007 - - January 30Cadillac, Gaylord, and Roscommon
- - February 9Plainwell and Rose Lake
- - March 7Bay City and Pontiac
- - April 10Baraga
3- Step 3 Conduct five Public Input Workshops
across the state for assessment of PRD and its
programs. (Notewe will coordinate the UP
meeting(s) with the scheduling of a meeting with
the Baraga District staff) February April 2007 - Step 4 Conduct a Visioning Workshop April
25-26, 2007 - Step 5 Develop a Draft Strategic Plan and
conduct public review workshops May - October,
2007 - Step 6 Finalize the Strategic Plan for DNR
approvals November - December, 2007
4Vision of Michigan State Parks (MSP)
- MSP in 2020 (defined vision)
- Leader in protection/preservation of Michigans
natural and historic/cultural resources. - Have stable and sufficient funding for quality
staff, facilities, and services. - Barriers to access have been eliminated for
Michigan citizens and visitors. - Education/interpretation opportunities are
emphasized to promote enjoyment and stewardship. - Contribute to local and state economy and
contribution is recognized. - Strong public support for system built on
partnerships with users, host communities, and
private sector. - Are valued and appreciated by Michigan citizens
and visitors.
5Vision 2020 - Six Major Goal Areas
- Secure long term, stable funding.
- Strengthen and expand interpretation.
- Improve quality and variety of camping and
lodging. - Improve quality and variety of recreation
opportunity. - Improve park planning and evaluation of a dynamic
MSP system, and, improve MSP resource
stewardship. - Better market MSPs consistent with the mission
and strategic plan.
6Assessment of Vision 2020 Goals(Results from
CCMSP meeting of 11/29/2006)
- GOAL 1 - Build long-term Stable Financial Base
Secure a permanent endowment for Michigan State
Parks (MSP) through a one-cent sales tax increase
for one year. Explore other nontraditional
sources of funding for the system. - What are the Strengths you can associate with
this goal? - We do have a Trust Fund (current balance is 120
million?) - Fall 2006 Proposal 1 to protect the funds and
citizen support. - We are not only part of DNR with a funding
problem. - Citizens Committee reformed and established by
statute. - Division Chief and Director expertise.
- State Park Foundation exists even if it is not
currently active. - Resource base.
- Visits over 24 million.
- Partnerships models.
- Innovative staff.
- Citizen support of State Parks and Recreation
programs.
7- What are the Challenges you associate with this
goal? - Lack of public knowledge of state park system.
- Lack of tourism industry recognition of state
parks. - The longer you survive on less the harder it is
to get more. - How do we explain the need?
- Clearly identify the believable consequences of
inadequate funding. - How do we compete with other leisure time venues?
- Total funding picture for the state is grim.
- Establishing new users/younger.
- Need to retain existing users, particularly older
ones who serve as the gateway to outdoor
recreation for their grandchildren when parents
are too busy.
8- What are the Opportunities to be realized with
this goal? - Form a coalition of local, regional, and state
support across public and private sectors. - Future grant opportunities.
- Regularly quantify and showcase the economic
impact of state parks on local communities, and
Michigan as a whole. - Reconnect with the disconnected (former) users of
state parks. - Image of and pride in state parks is good and
needs to be fostered. - Use state parks as opportunities to re-create
family. - Strengthen public education about state parks and
their role in conservation. - Keep up with trends.
- Health and wellness activities in state parks.
- Engage under-represented public.
- Cooperation among conservation interests to find
long term stable funding for conservation in
Michigan (e.g. across the DNR and other partners)
9- What are the Threats you can associate with this
goal? - Failure to recognize the differences of internal
vs. external values. - Business as normal/usual.
- Bad customer service.
- In-flexibility
- No lost value (Parks will always be there)
- Perception we serve only upper-level.
- Replacement of single business tax appears to be
leaving DNR (including state parks) out of the
loop - Have any other funding sources been explored?
(List and describee.g. State Park Foundation) - Yes.
- Missouri uses a conservation sales tax as does
Arkansas. - The Michigan State Park Foundation exists but is
not functioning.
10- Is this still a valid goal?
- Valid goal.
- Not just for parks.
- Total DNR support.
- Build long-term stable funding with other
partners. - Would you modify this goal? (How?)
- Include a goal of users providing full funding
for day-to-day operations beyond basic resource
stewardship through the fee system and a long
term stable funding source fully capitalizing the
State Park Endowment Fund to provide capital
funds for new and renovated facilities on a
rational replacement schedule. - Would you establish any other goals related to
this topic? (What?) - Encourage and reward innovation in regards to
improved efficiency, use of energy saving
technology, etc. Promote green initiatives and
efficiency challenge goals.
11- GOAL 2 - Provide Interpretive Programs in the
Parks Establish interpretive programs as a
cornerstone for the activities provided in the
parks system. - What are the Strengths you can associate with
this goal? - Interpretation is a primary reason people visit
parks Value added experience. - Cornerstone.
- Minimize negative effect of recreation use on
natural resources to be good stewards. - Understanding ? ownership ? responsibility ?
preservation of Michigans natural and cultural
resources. - Environmental stewardship learned in state parks
transfers to stewardship at home/state/global. - Provides opportunity to educate park visitor on
department/DNR issues.
12- What are the Challenges you associate with this
goal? - Development of interpretation plans a lot of
work. - Value of Interpretive opportunities should be a
key factor in park acquisition decisions. - Funding and staffing (quality-quantity).
- Complex Supervision within MDNR-PRD-DHAL.
- Utilization/reliance on inexperienced low paid
staff. - Integrate park staff rangers into overall
interpretive effort (begin a program). - Perceived disconnect between interpreters and
marketing of state parks.
13- What are the Opportunities to be realized with
this goal? - Allow Interpretive program to expand beyond the
traditional. - Expand interpretive program to harbors and BAS.
- Take advantage of technology and innovation.
- Build relationship with state park foundation.
- Build partnership with private sector/corps for
programming. - Better integrate interpretation into each park
(not as an add-on) with all park employees
translating story of resources, orientation
information, management information in many ways
including through informal contact. - Outreach programs
- Traditional and non traditional users/non-users.
- Leave no child inside.
- More effectively train seasonal employees to
provide basic, useful interpretive information to
customers.
14- What are the Threats you can associate with this
goal? - Lack of professional development.
- Lack of funding.
- Lack of understanding of importance of
interpretation as marketing tool, etc. - Did we establish interpretive programs as the
cornerstone for the activities provided in the
parks system? - More work to do but some good work
done/underway. - To what degree is interpretation linked to
activities in the park? - Some but greater linkage needed.
- Is this still a valid goal?
- Yes!
- Would you modify this goal? (How?)
- Broaden focus on DNR and PRD goals.
- Increase focus and funding for natural resource
stewardship. - Focus and for natural resource stewardship.
- All PRD employees can provide some basic
interpretation with customers - Would you establish any other goals related to
this topic? (What?) - - (No responses)
15- GOAL 3 - Improve/Expand Camping and Lodging
Facilities Upgrade existing camping and lodging
facilities and work in partnership with the
private sector to create new overnight
accommodations. - What are the Strengths you can associate with
this goal? - Knowledgeable staff.
- Locationgeographical diversity/variety.
- Resources (natural and cultural/historical)
- Key revenue source for state parks.
- Increasing variety of accommodations.
- Raw material source.(?)
- Un-met demand (certain locations and times)
- Central Reservation System.
- Potential grant funding (foundations)
- Program to build upon.
- Loyal customer base.
- Good image.
- Land to expand.
- Valued Campground Host program.
- Valued interpretation program.
16- What are the Challenges you associate with this
goal? - Financial. (e.g. lodging provision is expensive
requiring 24 hour per day coverage) - Utility costs continue to rise.
- P.I.L.T. (Payment In Lieu of Taxes)
- Maintaining trained workforce (significant
turnover of seasonal staff.) - Need current use data (most recent study from
1997) - Park users are not a diverse group (white, middle
class) - Aging infrastructure.
- Private industry perception of unfair competition
from state parks. - Keeping quality summer staff.
- Filling vacant positions, particularly in
mid-season. - Government regulations such as health department,
drinking water, etc. are sometimes onerous. - Red tape regarding permits, etc.
17- What are the Opportunities to be realized with
this goal? - Partnerships with other agencies (e.g. county or
private sector) for maintenance, or campground
operation. - Volume buying power (utilities)
- Green initiatives (wind, solar, combustibles).
- New campground layouts to better protect
environment, link to recreational assets (e.g.
trails, lakes) and provide universal access. - Expand definition of group camping to include
wider cross-section of potential group campers. - Continue to diversify lodging opportunities.
- Attract eco-tourists/corporate tourists for
retreat/team building. - Better use technology (e-newsletter, list serve,
e-comment cards, etc.) to increase satisfaction
of customers. - Restore outdoor centers (historic structures)
- Identify future trends in camping and lodging.
- Form community partnerships.
- Expand programming to attract visitors to
lengthen stay. - Attract and accommodate special user groups.
- Learn from other entities and states.
- Attract cultural diversity (staffing and users).
- Target seniors/grandchildren (takes into account
two wage earner households, early retirement by
baby boomers, and the strong camping orientation
of baby boomers).
18- What are the Threats you can associate with this
goal? - Legislative mandates.
- Financial inability to maintain/renovate existing
infrastructure such as roads, water, sewer, and
electrical systems. - Vandalism to park facilities and potentially by
park visitors to neighboring property. - Trespass by park visitors on neighboring
property. - Social changes between different generations with
some in the younger generation not exposed to
camping. - Weather.
- Urban sprawl which creates more park border
neighbors. - Overall lack of funding.
- Reduced staff hours directly impact presence and
quality of service. - Lack of public awareness.
- Private competition forces increasingly higher
prices to provide parity with private sector. - Over dependence on fees limiting ability to
provide camping opportunity to people of limited
means.
19- Has PRD worked in partnership with the private
sector to create new overnight accommodations?
(other than design/construction) - Nofocus has been on expanding options within the
state park system using former employee housing
and innovative designs (e.g. yurts) - Is this still a valid goal?
- Yesprovides important revenue stream for state
parks and increases opportunities for
interpretive interaction and area-wide outdoor
recreation and appreciation of park resources. - Would you modify this goal? (How?)
- (No response)
- Would you establish any other goals related to
this topic? (What?) - (No response)
20- GOAL 4 - Improve/Expand Recreation Opportunities
Provide the facilities and information needed by
the public to enjoy a range of activities
throughout the parks system, and encourage new
visitors to enjoy the parks' resources. - What are the Strengths you can associate with
this goal? - The ability to partner.
- The ability to diversify.
- Wide range of resources and facilities.
- Improvements in facilities are bringing in new
users. - Friends groups/stakeholders often help in
expanding and improving recreational offerings.
21- What are the Challenges you associate with this
goal? - Access from Urban areas may be difficult due to
lack of mass transit, fees. - Programming for new activities is historically
not a priority of PRD. - Lack of staff and money.
- Create more partnerships.
- Interfacing with P.A. 59 (2 tax on lodgingwould
this apply to camper lodging?) - Training/change attitudes/enable administrators.
- Need to think aheadidentify new trends in
recreational activities, etc.
22- What are the Opportunities to be realized with
this goal? - Partner with AARP.
- Partner with community-vendors, local park and
recreation agencies, community education, etc. - Having Demo Day provide more events.
- Connect DNR PRD resources with community
resources. - Provide concierge services.
- More varieties level of challenge.
- Expand Go Get Outdoors.
- Expand No Child Left Inside.
- Create ORV at compromised sites in Southern
Michigan (e.g. Bass River) - What are the Threats you can associate with this
goal? - Attitudes.
- Non-flexibility in MVP.
- Liability.
- Funding priority.
- Better understanding potential impacts of new
activities on park resources and existing
activities.
23- How do non-resource based activities fit in with
the park system? (e.g. Model Aircraft Flying
Fields?... others?) - - Need assessment for different activities at
different parks. - Is this still a valid goal?
- - Yes (based on discussion at the session
wrap-up). Still need to keep in mind protection
of the resource first. If resource is reasonably
well protected, new activities may be warranted. - Would you modify this goal? (How?)
- - (No response)
- Would you establish any other goals related to
this topic? (What?) - - (No response)
24- GOAL 5 - Establish Programs for Stewardship, Park
Evaluation, and Park Planning Initiate inventory
and management programs that help protect
sensitive historic and natural resources in the
parks. Improve the park planning process through
better use of resource information and public
participation. Adopt criteria that can be used to
evaluate individual parks, or to guide future
park acquisitions. - What are the Strengths you can associate with
this goal? - - Stewardship
- Protect/sustain resource.
- Meets mission/law.
- New planning process.
- Inventory Natural and Historical.
- Diversifies management.
- - Planning
- New planning process.
- Ability to set priorities statewide.
- Provides meaning.
- Sensitivity to natural features.
25- Inspired other groups/advocacy.
- Allowed for more interpretation/education.
- Facilitated cooperation/partnerships.
- Provides model for planning.
- Promotes volunteerism.
- What are the Challenges you associate with this
goal? - Funding, etc.
- Preserving cultural built resources.
- Preserving archaeological resources.
- Stewardship vs. outside political interference
and economic development. - Inability to get prescribed burning done.
- Ecological restoration is long-term management,
not a one-time activity. - Accelerating and completing the planning process.
- Preservation vs. recreation (enjoying it to
death). - Public education.
- Getting public to recognize themselves as
stewards. - Changes in leadership.
- Efficiency.
- Urban sprawl.
26- What are the Opportunities to be realized with
this goal? - Geo-Tourism. (tourism focused on place) leads
to appreciation and protection of those places. - We have the authentic natural and cultural
resources coming together. - Expanding education, interpretation and
volunteering friends groups. - Take the message outside parks.
- We have infrastructure for access to resources.
- Connecting natural landscape to the
story/history. - Pod casts/technology.
- Tying Wi-Fi hotspots to appreciating resources.
- Radio broadcasts for interpretation.
- Changes in leadership.
- Better emphasize the links with hunting/fishing
interests who support habitat, clean water, clean
air. - Better using habitat related grants for
environmental restoration, acquisition of key
inholdings to protect resource integrity.
27- What are the Threats you can associate with this
goal? - Eco-poachers.
- Funding.
- Invasive species (including nuisance native
species). - Climate change.
- Hydrologic change.
- Losing resources due to benign neglect/lack of
resources. - Overuse (love it to death).
- Improper uses of sensitive sites (e.g. illegal
ORV/snowmobile use, etc.) - Changes in leadership.
- Outside uses conflicting with resources.
- Continued decline of funding relative to need.
28- Has PRD improved the park planning process
through better use of resource information and
public participation? (How?) - Yes, Management Planning incorporates
stewardship and stakeholder/public inclusion in
the planning process. - Is this still a valid goal?
- - Yes.
- Would you modify this goal? (How?)
- - Expand outside parks (e.g. to Boating)
- - Incorporate technology.
- - Growing (?)
- - How to show success.
- - How to quantify success continue/expand.
- Would you establish any other goals related to
this topic? (What?) - - Education/outreach.
- - Technology.
- - Establish separate goals for stewardship and
planning? - - Accelerate planning process.
- - Regional/Ecoregional planning.
- - Linking DNR planning with other community
planning.
29- GOAL 6 - Create a Marketing Program Develop a
marketing program for the state parks system that
would give the public more information about the
opportunities available in the system, and
provide park managers with information to guide
future decisions on park facilities, activities,
and programs. - What are the Strengths you can associate with
this goal? - Our stakeholder groups are doing it for us.
- Default marketing.
- Missing (not many strengths).
- The ability to partner and diversify products.
- Public support of state parks.
- What are the Challenges you associate with this
goal? - Partnerships.
- Lack of public support of state parks.
- Making the public aware of our funding issues.
- How do we market to harbor users. (and BAS users)
- Identify market/users.
- No cohesive marketing plan its continually
rediscovered that we need to do marketing.
30- What are the Opportunities to be realized with
this goal? - Cross market.
- Create a marketing plan identify expected
outcome. - Re-visit current policies.
- Identify and segment users and non-users and why
they are/are not using parks. - Informing public of opportunities at underused
parks. - Create an activity directory of each park and
post it on the web. - Work with the corporate sector.
- What are the Threats you can associate with this
goal? - A 5 walk-in-fee and increased fees in general
may deter use. - Policies/directives.
- Lack of training preconceived attitudes of what
marketing is and does. - Concession contracts may limit the ability to
effectively market to meet customers needs.
31- Does marketing provide guidance to park managers
in making decisions on park facilities,
activities, and programs? - - (No Response)
- Is this still a valid goal?
- - Yes (based on discussion at the session
wrap-up) - Would you modify this goal? (How?)
- - Set specific goal to have a marketing plan in
place with measurable objectives related to
visitation as a result of marketing, and measure
of user satisfaction. - Would you establish any other goals related to
this topic? (What?) - (No Response)
32(No Transcript)
33- The Commissions Vision Statement
- Through continuing efforts over the next 50
years, the Michigan State Waterways Commission
and staff envision and will work toward a future
where - Michigan is a national and international resource
for boaters and others seeking water-related
recreational opportunities. - All Michigan residents and visitors have easy,
convenient access to all the states lakes,
rivers and streams through high-quality public
facilities. - Michigans Great Lakes Harbors-of-Refuge network
has been completed and is being operated and
maintained to provide transient boaters with
safe, high-quality public facilities using the
latest, most appropriate designs and technology.
34- All of these public boating facilities are
adequately funded and are developed, maintained,
and operated in a customer-oriented, ecologically
responsible manor. - Where appropriate, these public boating
facilities are being operated through partnership
with local communities, public agencies,
conservation groups, friends groups, and
concessionaires. - Michigans residents and public officials are
aware of and appreciate the contribution of
boaters funds to acquire, develop and maintain
the States public boating and public water
access facilities. - Access to waterways is supported because of the
contribution that recreational boating makes to
the local and state economy. - The Commissions work underscores the value and
benefit of citizen oversight, input, and
guidance.
35The Commissions Goals For The Next Five Years
- Upgrade and Maintain Existing Facilities
- Create New Boat Access Site Facilities
- Create Harbors of Refuge
- Strengthen Internal Structure and Efficiency
36Assessment of MSWC Goals(Results from MSWC
meeting of 11/30/2006)
- GOAL 1 - Upgrade and Maintain Existing Facilities
Through a careful process which begins with study
and thorough inventory, the Commission will
create a maintenance schedule and prioritize the
upgrades of existing Harbor Facilities and
Boating Access Sites. Specific benchmarks will
include - By year one, complete the harbor electrical
study. - By year two, complete the Boating Access Sites
infrastructure study. - By year three, complete the harbor infrastructure
study. - By year three, develop a preventive maintenance
schedule for boating access sites. - By year five, upgrade electrical infrastructure
at 12-15 harbors (at the rate of 4-5 per year,
with priority determined by the electrical
study). - By year five, upgrade a number of boating access
sites.
37- What are the Strengths you can associate with
this goal? - Continue utility upgrades.
- Retain and attract new users.
- Framework exists.
- Loyal following.
- Preventative Maintenance.
- What are the Challenges you associate with this
goal? - Determining appropriate capacity of
electric/utilities today and future. - Need for technology updates.
- Need for utility upgrades.
- Funding.
- We have to maintain what we have.
- Upgrades pressure nearby facilities to duplicate.
- Preventative maintenance.
- Economy up/down.
- Maintaining/sustaining internal expertise (boat
crews).
38- What are the Opportunities to be realized with
this goal? - Determining trends and respond with facility(s).
- Market analysis.
- Maintaining high level of quality.
- Preventative maintenance.
- Economy ups/downs.
- Incorporate in harbor features new trends, or
changing needs (pavilions, clubhouses, kayak
rack). - Internships.
- Partnerships.
- What are the Threats you can associate with this
goal? - Fuel costs, economy.
- Regulatory changes, laws, rules.
- Expectations.
- Water levels (up and down).
- Invasive species hydrills, milfoil, z-m. (all
types) - Trainingramp builders.
- Funding.
39- Is this still a valid goal?
- Yes.
- Would you modify this goal? (How?)
- Include technology (what users desire).
- New construction trends, tools, materials.
- Alternatives. (e.g. Green products and
buildings). - Would you establish any other goals related to
this topic? (What?) - Establish annual goals with priorities.
- Combine IMA and MRBIS into electronic unit.
- Modify facilities to respond to new trends.
- Continue to improve universal accessibility.
40- GOAL 2 - Create New Boat Access Site Facilities
The Commission will increase the number of
Boating Access Sites in areas of limited access
by 5 to 10 sites to better serve the needs of
recreational boaters. The Commission will
pro-actively create partnerships and garner local
support in creating these sites. The
Commissions work will depend on - The identification of high priority areas for
public access - The establishment of a Boating Access Site
Committee - The consistent use of survey methods to test for
and gain local support. - What are the Strengths you can associate with
this goal? - Increase activity.
- Revenue available to construct sites.
- Awareness of boating.
- Other DNR opportunities.
- What are the Challenges you associate with this
goal? - Process not known to the Commissioners.
- Land availability.
- Future demands and type of demands.
- No revenue from kayaks (or other non-registered
watercraft) - No sustainability of program.
41- What are the Opportunities to be realized with
this goal? - License vs. registration to gain more revenue.
- Navigable lakes and streams.
- Expand Grants-In-Aid program.
- Elevate boating potential where it currently does
not exist. - Register non-motorized craft.
- Stronger partnership between fishing and boating
(also wildlife). - Political support.
- Synergy of activities.
- Expand funding, i.e., federal grants.
- Create a Boating Foundation (similar to the Parks
Foundation). - John Dingell. (In strong political position for
the next 18-24 months) - Partnerships with historic/cultural interests
(e.g. HAL, Foundations, etc.) - What are the Threats you can associate with this
goal? - Supporting current sites.
- Negative public reaction.
- Environmental impacts.
42- Is this still a valid goal?
- Yes.
- Would you modify this goal? (How?)
- Develop a strong process to assess and support
the development of new sites (all watercraft). - Would you establish any other goals related to
this topic? (What?) - Develop a strong process to assess and support
the development of new sites (watercraft).
43- GOAL 3 - Create Harbors of Refuge The Commission
will complete the Cedar River project and seek an
alternate design/site for a harbor of refuge at
Cross Village. The Commission will also complete
a needs study for harbors of refuge in Lake
Superior. In all efforts, the Commission will
work with the Army Corps of Engineers to identify
navigational issues in site selection, and the
Congressional delegation to seek federal funding
to establish harbors. - What are the Strengths you can associate with
this goal? - Complete the safety net.
- Increase navigation.
- What are the Challenges you associate with this
goal? - Piping Plover and environmental issues.
- Availability of funds.
- General infrastructure expenses.
- Disposal sites (adequate).
- Permitting issues.
- Continue to validate program needs.
- Marketing.
44- What are the Opportunities to be realized with
this goal? - Marketing opportunity.
- Future trends and demands.
- Partnerships with private sector.
- What are the Threats you can associate with this
goal? - Goal 2 and 3 are mirrored in many factors.
- Is this still a valid goal?
- Yes.
- Would you modify this goal? (How?)
- Yes, explore type of boat and market to serve.
- Would you establish any other goals related to
this topic? (What?) - (No response)
45- GOAL 4 - Strengthen Internal Structure and
Efficiency - A) The Commission will utilize Standing
Committees to better manage the boaters needs
in the State of Michigan. They will include - - Facilities
- - Operation/Policy
- - Boating Access
- - Public/Governmental Relations
- - Finance
- B) The Standing Committees will work to bring
outside constituency groups into the public
process of the Commission. - C) The Commission will direct staff to utilize
the Bureaus Field Structure to assist in
statewide compliance of regulations, project
agreements, and policies pertaining to all
Waterways Commission sponsored facilities.
46- What are the Strengths you can associate with
this goal? - Standing Committees work issues out beforehand.
- Can address issues quickly with core
subcommittee. - Can map out opportunities to subcommittee tasks.
- Committees help organize boaters.
- What are the Challenges you associate with this
goal? - Commissioner turnover.
- Information, meetings, sharing.
- Communities unhappy with audits.
- Staff training/scheduling/planning.
- Need to represent unorganized boating public.
- What are the Opportunities to be realized with
this goal? - - Can fully discuss an issue.
- What are the Threats you can associate with this
goal? - Boaters not an organized groupMSWC can bring
these constituents together.
47- Is this still a valid goal?
- Yes
- Would you modify this goal? (How?)
- Yes, but look at subgroups differently (have
added strategic plan too). - Part C using field structure modify language
to be current but keep basic goal. - Would you establish any other goals related to
this topic? (What?) - Knowledgeable/trained staff available for
harbor/BAS public. - Seek new methods for MSWC to reach out to boating
public (comment cards, meeting announcements,
meeting times, etc.).
48(No Transcript)
49District Meetings
- Step 2 Conduct Workshops with PRD Districts and
interact with Department EcoTeams to introduce
them to the effort and process and to gain their
input. Perform SCOT Analysis of V2020, MSWC
Plan, and PRD as an agency January April,
2007 - - January 30Cadillac, Gaylord, and Roscommon
- - February 9Plainwell and Rose Lake
- - March 7Bay City and Pontiac
- - April 10Baraga
50Cadillac, Gaylord, and Roscommon Districts on
1/30/2007
- Excellent participation (approximately 70)
- Meeting notes sent out 2/15/2007
51Plainwell and Rose Lake Districts on 2/9/2007
(Sorryno photos)
- Againexcellent participation (approximately
50) - Meeting notes sent out 2/15/2007
52RAM Center Visioning WorkshopApril 25-26, 2007
- Conduct a Visioning Workshopwith backdrop of
SCOT Analysis and planning assessments. The
Visioning Workshop is the key step in this whole
process, where all elements for our strategic
plan development come together in a working
session. Here, diverse interests will interact
and collaborate during a 2-day workshop
involving ,CCMSP, MSWC, key stakeholders, and
PRD/DNR staff at the RAM Center (central location
and a setting conducive for group interaction and
synergy for collaborative work on this plan) -
Scheduled for April 25-26, 2007
53Workshop outcomes for the PRD Strategic Plan to
include
- Vision statement (Insightful portrayal of PRD
and how it relates to the DNR and the public it
serves) - Why does PRD exist? (What is its purpose and
significance?) - What distinguishes PRD from other DNR programs?
(Mission) - Is there a priority to the four components of the
Mission Statement? (Example are natural
resources or historic/cultural resources a higher
priority than education or recreation?) - What are PRDs opportunities and threats?
- What will PRD be like in 2020?
- Who will be PRDs customers and potential
customers
54- Goals (Clear and concise description of what the
future condition will be for the PRD Parks and
Recreation Area Program and the Boating Program) - Define the role of PRD in the DNR.
- Identify the key issues or goals previously cited
that are still relevant. - Add and define any new goals.
- Objectives (What are the specific results of
program efforts that will result in meeting the
identified goals?) - Specify the desired objectives to attain each
goal. - Identify the tools needed to accomplish the
objectives, including human resources, capital,
and technology.
55Following the Workshop, the next steps will
involve
- Actions (What specific actions can be taken to
accomplish the desired results?...developed with
PRD Staff input) - Develop a thorough list of actions for each
objective. - Each action shall identify a responsible position
and a target date for completion. - Actions shall be measurable.
- Plan Review and Update
- Establish mechanism for regular plan review and
update (5-year minimum) to keep the process
dynamic.
56(No Transcript)
57Working on
- Location for Bay City-Pontiac District(s) Meeting
- (March 7expect approximately 40 staff)
- Date/location for Division Staff Strategic
Planning Meeting (Sometime in March expect
approximately 40 staff) - Baraga District Meeting (April 10expect
approximately 40 staff) - Interaction with and input from Department
EcoTeams - Scheduling Public Input Workshops
- - March 20, 21, and 22 (Lower Peninsula)
- - April 9,10 (Upper Peninsula)
- - NOTE.stakeholders specifically invited to
attend - Setting up a Web site for info on the new PRD
Strategic Plan
58Thank You