Electrical Network Supervisor - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Electrical Network Supervisor

Description:

Process interface. RTU prototype for testing. Time frame. 1 year. 9/6/09. 10. ST ... prototype development for SE1. Database. Database design for CERN equipment ... – PowerPoint PPT presentation

Number of Views:38
Avg rating:3.0/5.0
Slides: 13
Provided by: sre66
Category:

less

Transcript and Presenter's Notes

Title: Electrical Network Supervisor


1
Electrical Network Supervisor
  • For the CERN electrical distribution network
  • Søren Poulsen

2
Architecture
3
Devices
4
Current Situation
5
Future Supervision
  • Long-term goal
  • Supervision
  • Industrial SCADA system with extended
    functionality for specific CERN requirements
  • Equipment interface
  • Industrial FE based on existing system
  • Developed with communication interface for CERN
    devices
  • Process interface
  • Industrial RTU and PLC solutions which replace
    MICENE system
  • Time frame
  • 4 years

6
Future Architecture
7
Future installation
8
ENS - Phase 2
  • Medium-term goal
  • Supervision
  • Industrial solution based on UNIX SCADA system
  • Modules for Power Flow and Energy Contracts
    Management
  • Equipment interface
  • Industrial FE based on Windows NT process
    computer
  • CERN FE computer for interface with MICENE
  • Process interface
  • Existing CERN and industrial systems
  • MICENE as process interface and automation
    (compensator control)
  • Time frame
  • 2 years
  • Coordinated with consolidation project

9
ENS - Phase 1
  • Short-term goal - Phase 1
  • Supervision
  • NCC UNIX based SCATE-X from EFACEC Portugal
  • First release SE1 supervision
  • Last release Complete CERN distribution network
  • Equipment interface
  • GATED Software interface to CERN Front End
    computers
  • No hardware installation
  • Process interface
  • RTU prototype for testing
  • Time frame
  • 1 year

10
Phase 1 - Architecture
11
Current activities - 1
  • NCC
  • MMI design phase
  • MMI principle design
  • symbol libraries
  • prototype development for SE1
  • Database
  • Database design for CERN equipment
  • Data point analysis and data point collection
  • Software Functionality
  • special CERN functionality

12
Current Activities - 2
  • GATED
  • Software Requirements Definition
  • Software Requirements Document (SRD)
  • Interface definition
  • Interface Control Document (ICD)
Write a Comment
User Comments (0)
About PowerShow.com