FEDs - PowerPoint PPT Presentation

1 / 2
About This Presentation
Title:

FEDs

Description:

Testing at CERN in progress. Various improvements to monitoring, new status words ... Format changes for optimal Filter software efficiency tbd. VME 64 Block ... – PowerPoint PPT presentation

Number of Views:17
Avg rating:3.0/5.0
Slides: 3
Provided by: matth94
Category:
Tags: feds | testing

less

Transcript and Presenter's Notes

Title: FEDs


1
FEDs SLINK Carrier Cards
FED Current Board Yield  98.0
SLINK Transition Carrier cards 495 SLINK cards
have been sent to CERN. 5 kept at RAL for local
tests. Final Yield of SLINK cards was
100. First Batch of 70 cards will be
returned to RAL to have shielded RJ45s fitted.
2
FED Firmware
  • FED Firmware Developments
  • SPY channel. Synchronised to Frames. Needs
    testing at CERN.
  • Fine Timing Skew calibration improved. Needs
    verifying in CERN system. Important.
  • TTC Channel B e.g. APVe broadcast. Tested at
    RAL. Testing at CERN in progress.
  • Various improvements to monitoring, new status
    words
  • Improvements to Throttle and overflow handling
  • Event Downscaling for Fast Raw pedestal readout
    tests to investigate noise at detector edges.
    Implemented, under test.
  • Event Format changes for optimal Filter software
    efficiency tbd.
  • VME 64 Block Transfers tbd
  • Outstanding problems
  • Missing buffers reported in TIF tests. Have
    recent firmware releases fixed this?
  • ZS Lite initialisation problem.
  • Intermittent Compact Flash new firmware file
    reloading failures
  • Changes needed based on operation experience,
    resets etc
  • ???
Write a Comment
User Comments (0)
About PowerShow.com