Title: BOTSWANA POWER CORPORATION


1
BOTSWANA POWER CORPORATION
  • A PRESENTATION ON
  • THE ELECTRICITY SUPPLY SITUATION
  • IN BOTSWANA
  • BY
  • BOTSWANA POWER CORPORATION

  • 24th July 2008

2
Presentation Overview
  • Botswanas Sources Of Supply
  • Regional Supply Outlook
  • The Challenge
  • 4. Measures to Address the Supply Gap

3
Botswanas Sources of Supply
Constrains on the Sources of Electricity
4
The Southern African Power Pool
  •  

5
Regional Supply Demand Outlook
  •  

6
Regional Supply Demand Outlook
  •  

7
Botswana Demand Forecast
2008 2026 Demand Projection
8
THE CHALLENGE
5 Year Capacity Outlook
9
THE CHALLENGE
5 Year Energy Balance
10
THE CHALLENGE
(Apr Dec) 2008 Supply Demand Balance
11
Measures to Address the supply Gap
DEMAND MANAGEMENT
12
Impact of DSM On The Load Curve
200 MW
Base Load 300 MW
13
Annual Load Curve For 2007 TOU Periods
High Demand Season
Low Demand Season
Low Demand Season
14
MEASURES TO ADDRESS THE SUPPLY GAP
SECURING ADDITIONAL SUPPLY
15
Moruple B Phase 1 Timing
Commissioning Time Table
16
BPC System Development Plan
17
THE END
  • THANK YOU