WLCG-EGEE-OSG Interoperability - PowerPoint PPT Presentation

About This Presentation
Title:

WLCG-EGEE-OSG Interoperability

Description:

Special Thanks to Rob Gardner your presenter, and Torsten Antoni ... Face-to-face meetings create a flurry of activity, but it tends to fade between meetings ... – PowerPoint PPT presentation

Number of Views:24
Avg rating:3.0/5.0
Slides: 14
Provided by: robq
Category:

less

Transcript and Presenter's Notes

Title: WLCG-EGEE-OSG Interoperability


1
WLCG-EGEE-OSG Interoperability
  • Rob Quick
  • Open Science Grid Operations Center - Indiana
    University
  • Special Thanks to Rob Gardner your presenter, and
    Torsten Antoni who helped with the original
    presentation this one is based on.

2
Outline
  • Goals of Interoperability
  • Cross Grid Monitoring
  • Communication
  • Challenges
  • Conclusion

3
Goals of Interoperability
  • Seamless operations for users who wish to cross
    administrative boundaries
  • Users who want to cross grid boundaries need to
    know the environments, both technical and
    administrative, will be similar
  • Site Validation and Availability
  • Cross Grid Publication and Notification
  • Trouble Reporting
  • Security Response

4
Goals (Cont.)
  • Preserving the autonomous boundaries between
    infrastructures and provide a framework for
    scalability and defined areas of responsibility
  • Communication between operations groups to assure
    users feel at home in all WLCG environments

5
Publication and Monitoring
  • BDII
  • In place at EGEE and OSG
  • SAMs (EGEE testing of OSG sites)
  • Testing has begun on a single OSG node and is
    progressing (moderate success with job
    submission)
  • At this point no modifications have been made
    explicitly to the OSG node to allow SAM to
    function
  • I expect a minimal subset of the GLite package
    will need to be installed to have useful SAM
    results
  • Problems are being worked through as they are
    encountered
  • Short term stop in testing while OSG-ITB-0.5.2 is
    being rolled out
  • Will be restarted on Monday 29 January

6
Publication and Monitoring (Cont.)
  • VORS (OSG testing of EGEE sites)
  • A single pre-production site is being set up to
    run OSG critical tests against
  • Problems will be worked through as encountered
  • Ops VO will be used for all interop testing and
    monitoring
  • Limited set of users from both EGEE and OSG

7
Critical Communications
  • Ownership of each communication so each reported
    problem gets the proper followup and reaches
    proper resolution
  • Critical Updates
  • Relies on communication between operations
    groups, no formal policy exists
  • This should be a priority
  • Security Notification
  • WLCG Security Model has been implemented
  • Standard patches and updates
  • With interoperability monitoring we need to be
    careful that standard patches/updates do not
    break the tools we are using

8
Trouble Ticket Communication
  • Ticketing
  • OSG Footprints
  • Global Grid User Support
  • Each OSG VO and EGEE ROCs individual ticket
    system
  • All these helpdesks/ticketing systems are
    connected and are used for user support and for
    operations to formally communicate inside and
    across the infrastructures

9
Ticket Communication
Example OSG User Communicates with EGEE site
ExampleEGEE Service Communication with OSG Site
10
Communication and Planning
  • Joint Meeting (every 6 months)
  • Next Joint Meeting, 4-7 June 2007, Indianapolis,
    IN - US
  • Focus on LHC Data Taking Ramp Up
  • Weekly WLCG Operations Meetings
  • Individual Communications as Needed
  • Software groups
  • Monitoring groups
  • Operations teams

11
Challenges
  • Different Software Stacks
  • Critical Tests on both sides rely on services
    that may not be standard parts of the other grids
    software
  • ExampleGRIS will not be a standard on OSG
    releases gt 0.5.1, SAMs tests rely on information
    used by GRIS
  • GRIS will be installed and can be started on OSG
    0.5.2
  • Binaries and conf files SAM is looking for are
    not available by default on OSG nodes
  • glite-gridftp-remove, edg-wl-logev
  • A small OSG WLCG Validation software package
    may need to be developed and configured to allow
    usefull testing by SAMs
  • Environmental structures are different between
    GLite and OSG stacks

12
Challenges (Cont.)
  • Policies are different, meshing is not always
    easy or desired
  • Policies are determined by the project drivers,
    and these are not always the same
  • Ticketed communication is quick, human
    communication is not always so fast
  • Time differences make it difficult to just pick
    up the phone and work through problems
  • Face-to-face meetings create a flurry of
    activity, but it tends to fade between meetings

13
Conclusions
  • Communications is the key to interoperability and
    these processes are in place, continuing to
    refine procedures will be critical to success
  • Operations problems are getting solved
  • Technical and Monitoring issues are being
    addressed, this is not always a quick and easy
    process as we are working with different software
    stacks
  • OSG is committed to interoperability with EGEE,
    WLCG, and TeraGrid
  • With dedicated effort both technical and
    administrative challenges can be overcome
Write a Comment
User Comments (0)
About PowerShow.com