Title: Module: TPM
1Training Pack
Module Workplace Management
Element 5S / 5C
2Aims and Objectives
- Target Audience
- 5C Facilitators/Trainers, Operations and Support
Management - Purpose of Module
- To give a full understanding of the 5 Cs, their
importance and how they can be effectively
introduced. - Aims Objectives
- Understand the basis for 5C
- What each of the steps are
- Measuring Improvement
3Contents
- Introduction
- 5C Overview / Getting Started
- Clear Out Classify
- Configure
- Clean Check
- Conformity
- Custom Practice
4There are no world class manufacturing companies
without 5C in place
5C Overview
5The 5C Approach
- 5C is a systematic approach to workplace
organisation and housekeeping. Encouraging
ownership and self discipline to sustain and
further develop working practices. - It aims to -
- Remove waste from the workplace.
- Provide an environment where continuous
improvement is embraced. - Improve safety.
- Increase quality.
6Things to consider before 5C Implementation
.involving everyone with 100 communication!
75C Workplace Audit
- Establish current state.
- Using recommended audit sheets.
- Capture current state using colour photos.
- Record other problem areas, such as safety
issues or machine breakdowns.
85C Workplace Audit
95C Office Audit
10What are the 5 C ?
The C are five words, which provide the steps
to improvement.
Custom Practice
Conformity
Clean and Check
Configure
Clearout and Classify
111st Step - Clear Out Classify
- Conduct major clean-down.
- Remove all items that are not required or have
become unnecessary over a period of time. - Includes repairing broken tools equipment.
- Frequently used items should be stored at the
work area. - Infrequent used items stored away from the work
area and dispose of items that are not needed. - Never assume. Ensure everyone is in agreement.
.Remember! Redundant items cost money to
store - If you dont need it, dont keep it!
12Classify
Classify tooling / equipment by frequency of use
.within the LOW category, retrieval MUST still
be quick!!
13Red Tag Strategy
This means putting red tags on any items not
required for the current production, any items
kept in excessive amounts and any items used
infrequently. Then removing these items from the
area/cell.
14How do we Red Tag ?
Raw materials, procured parts assembly parts, etc
Floor, walkways, staging, benches, walls,
shelves, racks, etc
Machines, tools, jigs consumable items,
chairs, cabinets, trolleys, etc
Notices, minutes, drawings, reports, etc
...Red Tag Targets
15Red Tag Auction
Team evaluate Red Tagged items
- Options
- Keep item where it is.
- Move to new location of work area.
- Store away from work area.
- Hold in Red Tag Quarantine Area for evaluation.
- Dispose of e.g throw away, return to stores.
- Agree min/max quantities.
- Record Results
- Records need to be kept of items moved to a Red
Tagging Area or disposed of.
16Red Tag Analysis Sheet
Note Value Categories are 0-100
/ 100-1000 / 1000
17Why Clear Out Classify ?
- Frees up space.
- Removes clutter/obstacles.
- Stops people adding to it.
- Stops hoarding.
- Improves safety.
- Gives control of what is in your area.
- Begins the orderliness process.
182nd Step - Configure
- To arrange all necessary items for economy of
movement. - Place according to frequency of use.
- To have a designated place for everything to
label, classify and make easily visible. - A place for everything and everything in its
place. - Provide safe storage - heavy items low, light
items high. -
19Configure Examples
Personal Identity Tags
Shadow Board used
20Configure Examples
Colour coded rubbish stations
i.e.. Blue - Metallic materials Red -
Electrical wiring
Colour coded Direct Line Feed i.e.. Green -
Rivets Red - Fasteners
21Why Configure ?
- Makes things easier to find, use and return.
- Removes frustration of searching for items.
- Creates a better working environment.
- Reduces accidents.
- Assists cleanliness.
- Begins standardisation.
223rd Step - Clean Check
- Identify Cleaning Zones.
- It is everybodys responsibility.
- Set targets and work to them.
- Keep your area clean and tidy on a continual
basis. - Cleanliness extends to non-seen areas(eg behind
cupboards etc). - Routine maintenance may be incorporated (TPM).
...Agree Visualise
23Clean Check
- Can be divided into 3 sections -
..Creating a spotless workplace
24Clean Check
- Machine concern / fault analysis
..through cleaning you touch, through touching
you find when you find, you fix !!
25Clean Check Fault Finding Sheet
26Clean Check Fault Finding Sheet
27Clean Check Concern / Fault Analysis
CONCERN / FAULT ANALYSIS
CODE CLASS E ELECTRICAL M MECHANICAL L
LUBRICATION H HYDRAULIC W WATER P
PNEUMATIC 1 LOOSE 2 WORN 3 BROKEN 4
LEAKING 5 MISSING 6 DIRTY 7 DIFFICULT TO
CLEAN 8 LOCATION / OR ROUTING 9 POOR
DESIGN
28Clean Lubrication Sheet - Example
Date
Machine
Cleaning Items
Lathe
Process
JIG REMOVAL
C
Item to Clean
LOCATING PINTLE
1
2
AREA AROUND SHAFT
3
SUPPORTING ACTUATOR SHAFT
4
GENERAL AREA
C1 D1
Lubrication Inspection Items
D
Item
LOCATING PINTLE - INSPECT FOR
1
WEAR, LUBE WHERE NECESSARY
SUPPORTING ACTUATOR SHAFT -
2
C3 D2
AS ABOVE
REPORT ANY DAMAGE TO TEAM LEADER
3
29Clean Lubrication Sheet
30Clean Lubrication Standards Sheet - Example
31Clean Lubrication Standards Sheet
Machine Process Date
Frequency
Time
Cleaning Item
Method
Std / Lub
Min
Tools Required
Shift
Day
Week
2 wk
Mon.
Who
Tools Required
Method
Lubrication Standard
Std / Lub
Total
Min
32Action Plan Sheet
33Why Clean Check ?
- Makes defects easier to detect.
- Better customer perception.
- Creates a better working environment.
- Aids efficiency and reduces accidents.
- Helps standardisation.
344th Step - Conformity
- Use visual controls.
- To maintain the workplace at a level which
uncovers and makes problems obvious. - To continuously improve by continuous assessment
and generating actions. - To include routine health and safety.
..the system must be controlled and
maintained (using agreed standards.)
35Conformity
Location Indicators
365C Audit Check Sheet
- Continual assessment.
- Periodically but not scheduled.
- Help maintain the set standard.
- Apply common sense.
- Enables Plan, Do, Check, Action cycle.
- Promotes safety first.
- Publish scores on notice boards.
- Impresses the customer.
37Audit Process
Minimum Requirement
C/L to understand/ address any shortfalls then
file in C/Ls Office
The handover document to Cell / Shift Leader for
archive
Mgr CELL / SHIFT LEADER
T/L Handover
OPS MANAGER
- Daily - The incoming T/L needs to decide
whether the dept.is in an acceptable condition
- Weekly - Mgr with Cell / Shift Leader
must complete the Cell Performance/ Workplace
Mgnt Audit Sheet adhoc dip check ofT/L
Handover archive
- Weekly - /Ops Manager must conduct an audit
using the Area Map (support personnel to attend)
- Daily - T/L must complete at the end of
shift and hand to the incoming T/L
YES
NO
- Weekly - Ops Manager to review the audit with
Mgrs before the HUD is updated
T/L off the previous shift to rectify the issues
with immediate effect
T/L can now continue to deploy operators onto
station
- Weekly - Results communicated to T/Ls at the
morning brief, then communicated to
Operations (via PMS Board)
- Weekly - Mgr must then feed the results into
the HUD
ACCEPTABLE HANDOVER ?
38T/L Self Audit / Hand-over
Process
- Every day Team Leader self audits workplace
performance against a check list. - Forms part of the Team Leader handover from shift
to shift. - Agreement between Team Leaders on the current
state. - Looking for
- Housekeeping to the required standard.
- Performance management measures up to date and on
target. - Quality standards are adhered to.
- Work is being performed to the standard.
- Issues identified customer protection/counter
measure underway.
395C Audit Check Sheet
Process
- At the appropriate frequency (min. once per week)
the Mgr and Cell / Shift Leader to audit team
performance. - T/L to attend in appropriate area.
- Coach and task against non-conformances
- Audit scores feed into a weekly HUD for the
Dept. and/or Cell - Dept. Audit Scores made available for Site HUD
- Looking for
- 5C to the required standard.
- Performance management measures up to date and on
target. - Quality standards are adhered to.
- Work is being performed to the standard.
Ensure a clear standard exists for each element
audited
40Management Audit Scores
- DEPARTMENT
- Management audit conducted weekly
- One of the KPIs for the department and as such
reviewed regularly. - Targets set and trends monitored.
- Displayed openly on section.
41Housekeeping Area Map
- To be used by Ops Managers
- Once per week audit, Mgrs to lead Ops Manager
around appropriate cells. - Display on Info. Centre boards
- Mgr to feedback major non-conformance's back to
Cell / Shift Leaders and T/Ls immediately
following audit
42Why Conformity ?
- Provides schedule of 5C activities.
- Ensures deterioration does not occur.
- Gives a standard to work to.
- Starts problem solving/improvement activities.
- Makes first 3Cs a habit.
- Promotes ownership.
435th Step - Custom Practice
- Probably the most difficult of the 5Cs.
- Make it a habit.
- Setting review frequency.
- Cleaning checklist matrix.
- To maintain our habit we need to practice and
report until it becomes a way of life. - Visual communication instead of verbal!
..Ownership !! Without it the other steps
will fail!
Its everyones responsibility
44Operator Check List - Example
45Operator Check List - Example
46Why Custom Practice ?
- It makes 5C routine.
- Sustains all improvements.
- Builds on the improvements already made.
- Maintains agreed procedures.
- Ensures we dont fall back into our old ways.
475C Summary
- Improves safety.
- A structured approach.
- Applicable to the General Manager and everyone
else. - Improves productivity.
- Improves quality.
- Improves morale and teamwork.
- Enjoy - working in a clean, organised, quality,
successful, safe
environment. - You do it at home why not at work?
-
48Finally .
Improvements should be in-expensive. The more
money we spend, the less ingenuity we use to find
solutions.