Classrooms for the Future - PowerPoint PPT Presentation

1 / 19
About This Presentation
Title:

Classrooms for the Future

Description:

Lenovo Investment. Intel Solo Core Processor (1.66GHz/2MB Cache/400 MHz FSB) ... Lenovo Investment. Stainless Steel Hinges. Keyboard Spill Tray. HDD Shock Absorber ... – PowerPoint PPT presentation

Number of Views:45
Avg rating:3.0/5.0
Slides: 20
Provided by: pde84
Category:

less

Transcript and Presenter's Notes

Title: Classrooms for the Future


1
Classrooms for the Future
2
What knowledge and skills do students need to
THRIVE in the 21st century?
3
High School Reform in PA
  • Project 720
  • Dual Enrollment
  • Job Ready PA
  • School Improvement
  • Career and College Readiness
  • Accountability Block Grants
  • Pennsylvania Inspired Leadership
  • Pennsylvania High School Coaching Initiative
  • Keystones Technology Integrators
  • Getting to One Grants
  • Classrooms for the Future

4
Classrooms for the Future
  • A bold step toward large-scale high school reform
    for the 21st Century
  • 3 year initiative
  • 20 million Year One (79 school disticts)
  • 90 million Year Two (250 school districts)
  • 90 million Year Three (remaining school
    districts)
  • Grantees commit to -
  • Improve teaching and learning in English, math,
    science, and social studies
  • Assist us to prepare our students for tomorrows
    postsecondary and workforce opportunities
  • Support models for future classrooms
  • Promote leadership advocacy for systemic change
    in organizational and instructional practices

5
Major Goals
  • Change classroom practice
  • Change student-teacher relationships
  • Increased student engagement
  • Students responsible for learning
  • Students developing 21st century skills
  • Increased academic achievement

6
Classrooms for the Future Objectives
  • High School Reform
  • Significantly accelerate the infusion of
    technology into the curriculum
  • Provide the Commonwealths secondary school
    teachers with the professional development
    necessary to master the technology utilized to
    transform their classrooms

7
Lenovo Investment
  • Intel Solo Core Processor (1.66GHz/2MB Cache/400
    MHz FSB)
  • Microsoft Windows XP Professional Operating
    System (with upgrade to Vista)
  • 15.4in WXGA Display
  • 512MB DDR2 533MHz SDRAM, 1 DIMM (upgrade
    available to 1GB)
  • 24X CD-RW/DVD Combo Drive (Teacher PC has
    DVD-RW/CD-RW Drive)
  • 60GB Hard Drive, 9.5MM, 5400RPM
  • Integrated Intel Media Accelerator 900 Graphics
    (up to 128MB VRAM)
  • 6 Cell Primary Battery (up to 5.6 hour battery
    life)
  • Built-in IEEE 1394 (Firewire)
  • Built-in Ethernet (10/100/1000)
  • Built-in Wireless (802.11a/b/g, 54Mbps)
  • 3 Year Onsite Warranty to include Next Business
    Day replacement of parts
  • 5.8lbs

8
Lenovo Investment
  • Stainless Steel Hinges
  • Keyboard Spill Tray
  • HDD Shock Absorber
  • Active Protection System
  • Dual Cover Latches
  • Interlocking Frame
  • with Roll Cage

9
Software Titles
  • XP Pro no cost upgrade to Vista Business Pro
  • Office 2007
  • Movie Maker Create, edit, share video via Web,
    e-mail, or CD
  • Photostory
  • Media Player
  • Microsoft Publisher
  • Inspiration
  • Futurekids Learn it teach it
  • Adobe Creative Suite 2.3
  • Photoshop
  • Illustrator
  • InDesign
  • Go Live
  • Acrobat
  • Version Cue
  • Stock Photos
  • Dreamweaver

10
Software Titles Cont.
  • Thinkvantage Technologies
  • Rescue Recovery
  • Access Connections
  • Thinkvantage System Update
  • Productivity Center
  • Audacity Audio editing software
  • Promethean ACTIVStudio

11
Promethean Investment
  • Professional Development Focus
  • Post implementation support
  • Promethean Planet
  • Lesson plan integration
  • Promethean Demonstration

12
Professional Development Overview
  • Assessment for all teachers principals
  • iAssessment designed by Futurekids
  • Administrators
  • Futurekids iAssessment for Principal Futurekids
  • Pre session (curriculum needs assessment)
    Promethean
  • Post session (teacher presentations, needs
    assessment) Promethean
  • Total 2 days

13
Professional Development
  • Coaches
  • Infusing Technology Futurekids
  • Kickoff Coaches Conference Futurekids
  • Secondary Coaches Mentoring Futurekids
  • Adobe Creative Suite Course Adobe
  • Adobe Print, Web, and Mobile publishing course
    Adobe
  • Lesson plan integration Promethean
  • Post sessions Promethean
  • Total 10 days

14
Professional Development
  • Teachers
  • Lesson plan integration Promethean
  • Post implementation sessions Promethean
  • Open Box Futurekids
  • Open Box Futurekids customized online course
    available to all teachers (TC)
  • Infusing Technology Futurekids online course
    available to all teachers
  • Adobe Education Leader Series Adobe online
    lesson plan creation (4 core subjects) (TC)
  • Total 2 days

15
Professional Development
  • Technical Team
  • Setup and Installation Session CDWG Install
    Team during implementation
  • Thinkvantage Technologies Lenovo
  • Total 2 Days

16
Early Installs
  • Develop rollout plan
  • Look at infrastructure
  • Implementation Progress
  • Dedicated CFF Account Team
  • Partnership with school

17
Implementation Strategies
  • Best Practices Project Management
  • Partnership with vendor / communication
  • Site readiness will provide checklist
  • Lead time most likely installed in
    August/September
  • Storage/Security
  • Doc Access
  • Contingency planning

18
Implementation Strategies -Possible Options
  • Language Arts and Math (voluntary)
  • Language Arts (14) and Math (12) (required) 26
    classrooms total
  • All Core Subjects (voluntary)
  • All Core Subjects (required) Language Arts
    (14), Math (12), Science (12), Social Studies
    (12) 50 classrooms total

19
Website
http//www.nazarethasd.k12.pa.us/cff
20
Next Steps
  • Review Grant Proposals
  • Submit ideas for how this project could be used
    to support teaching and learning in specific
    areas (deadline Friday, March 30)
  • Rough Draft of Grant (April 13)
  • Meet to review and discuss (week of April 16)
  • Grant proposal due end of April

21
Questions???
Write a Comment
User Comments (0)
About PowerShow.com